Journal of the Korea Institute of Building Construction
/
v.13
no.3
/
pp.209-217
/
2013
The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.268-270
/
2006
The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.
Although the language of Geoffrey Chaucer as part of late Middle English has been discussed by many studies, among which David Burnley (1983) seems to be most remarkable, some aspects of Chaucer's language still need to be better illuminated for a more thorough understanding of not only Chaucer's work and language but also the English language in the late Middle English period. This paper examines the English negation of Chaucer's language, shown especially in his Canterbury Tales, and explains how negation is used in his work, focusing on the three different types of sentence negation and the uses of or and and in the scope of negation.
In current complex nature of management with task-structures, a method to reach the enterprise's informationalization success is not common. To satisfy these various requirement, improving the usability of information technology (IT) is a key factor which defining the level of organizational requirement first. Imposing an IT-solution which has excess service of the organization's previous task-environment, procedure and scope is not effective to SME-level unit, which unit could not have a formal organization structure and task structure. SME level informationalization will be success if each function realizes easier on the task-employee's viewpoint. Achieving this objective, a solution provider or department must reflect their work characteristics of nature which has least level of work performing resistance. It is most useful system for SME level unit, if a provider develops single programs which based on task activities, and each program can configure network-linking.
A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.
International Journal of Computer Science & Network Security
/
v.22
no.5
/
pp.317-319
/
2022
Rich morphology language such as Arabic needs more investigation and method to improve the sentiment analysis task. Using all document parts in the process of the sentiment analysis may add some unnecessary information to the classifier. Therefore, this paper shows the ongoing work to use sentence location as a feature with Arabic sentiment analysis. Our proposed method employs a supervised sentiment classification method by enriching the feature space model with some information from the document. The experiments and evaluations that were conducted in this work show that our proposed feature in the sentiment analysis for Arabic improves the performance of the classifier compared to the baseline model.
Hong Hyun-Seok;Yeo Seong-Jin;Jeong Young-Heun;Kim Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.552-555
/
2004
As the scale of building construction is larger and more complex, accident is increasing on the steel structure work process. But Safety-Inspection has been carried out through many other checklists in the workplace, it hasn't been used actively. Because checklist wasn't written at the level of specific work and applied scope is Insufficient. So, we must grasp accidental cause about detailed work for making safety management checklist accurately. For this study, we are confining a range to steel structure work of all the building construction. We will classify steel structure process into the detailed work for preventing accident. And we will grasp accidental cause about detailed work for developing the checklist in the future.
An improved Reactor Regulating System (RRS) logic architecture, which is combined with genetic algorithm (GA), is implemented in this work. It is devised to provide an optimal solution to the current RRS. The current system works desirably and has contributed to safe and stable nuclear power plant operation. However, during the ascent and descent section of the reactor power, the RRS output reveals a relatively high steady-state error, and the output also carries a considerable level of overshoot. In an attempt to consolidate conservatism and minimize the error, this work proposes to apply GA to RRS and suggests reconfiguring the system. Prior to the use of GA, reverse engineering is implemented to build a Simulink-based RRS model. Reengineering is followed to produce a newly configured RRS to generate an output that has a reduced steady-state error and diminished overshoot level. A full-scope APR1400 simulator is used to examine the dynamic behaviors of RRS and to build the RRS Simulink model.
As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.
Ever since the year 2000, Korea's musical markets has invited famous overseas license performances and have therefore cooperated with staffs working overseas in regards to stage costumes. This study aims to suggest the methodology of the stage costume making process according to the present advanced production system of Korea's musical market. The researcher participated in the stage costume making work of 'Chicago' as a costume supervisor. It took place at the Opera House of Seongnam Art Center from January 10, 2010 to February 28, 2010. Furthermore, there was significance in reinforcing academic values and implementing practical making process of stage-costumes based on the actual field work. The method of this research was carried out through a theoretical research and a case study that focused on empirical research. As for the research scope, it was limited to the actual stage-costumes that the researcher fully engaged with as a costume supervisor of the musical 'Chicago.' The results of this study were as follows. The stage costume making process of the musical 'Chicago' was categorized according to the classification of production system in the performance. For pre-production, it was divided according to the information of the actor and the analysis of the bible. Rehearsal period was divided according to the product clothes and fitting. Production week & preview were divided according to the changeover of clothes and the arrangement of dressers. The Run was divided according to the inspection of the situation concerning clothes in general during the performance. Post-Production Period was divided according to the collection of clothes and the implemented database. This study eventually suggested appropriate stage-costume making processes for the costumes making environment according to the expansion of overseas license musical market. However, it has a limitation of the research scope to the musical 'Chicago.' The creative performances of the domestic version are planned in diverse forms and come to abroad animate by the Korean Wave. Therefore, the field of stage-costume is necessary for the establishment of practical schemes of the system and copyright in accordance with the environment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.