• Title/Summary/Keyword: School road safety

Search Result 189, Processing Time 0.023 seconds

Preparation and Electromagnetic Properties of an Electromagnetic Wave Absorber

  • Sun, Chang;Sun, Kangning;Pang, Laixue;Liu, Jian
    • Journal of Magnetics
    • /
    • v.21 no.1
    • /
    • pp.61-64
    • /
    • 2016
  • In this study, we report the as-prepared MgO-doped $BaFe_{12}O_{19}$, which was prepared by calcination technique and high-energy ball milling process, as an electromagnetic wave absorber. The phase analysis of $BaFe_{12}O_{19}$ and the as-prepared MgO-doped $BaFe_{12}O_{19}$ was detected utilizing X-ray Diffractometer (XRD). The microstructure was characterized using Scanning Electron Microscope (SEM). By means of the transmission/reflection coaxial line method, the electromagnetic properties and microwave absorbing properties of the as-prepared electromagnetic wave absorber were studied. It is found that the electromagnetic wave absorber has a minimum reflection loss value of -41 dB at 4.27 GHz with a matching thickness of 2.6 mm. The experiment results revealed that the as-prepared electromagnetic wave absorber could find potential applications in many military as well as commercial industries.

Machine Learning based Optimal Location Modeling for Children's Smart Pedestrian Crosswalk: A Case Study of Changwon-si (머신러닝을 활용한 어린이 스마트 횡단보도 최적입지 선정 - 창원시 사례를 중심으로 -)

  • Lee, Suhyeon;Suh, Youngwon;Kim, Sein;Lee, Jaekyung;Yun, Wonjoo
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.1-11
    • /
    • 2022
  • Road traffic accidents (RTAs) are the leading cause of accidental death among children. RTA reduction is becoming an increasingly important social issue among children. Municipalities aim to resolve this issue by introducing "Smart Pedestrian Crosswalks" that help prevent traffic accidents near children's facilities. Nonetheless such facilities tend to be installed in relatively limited number of areas, such as the school zone. In order for budget allocation to be efficient and policy effects maximized, optimal location selection based on machine learning is needed. In this paper, we employ machine learning models to select the optimal locations for smart pedestrian crosswalks to reduce the RTAs of children. This study develops an optimal location index using variable importance measures. By using k-means clustering method, the authors classified the crosswalks into three types after the optimal location selection. This study has broadened the scope of research in relation to smart crosswalks and traffic safety. Also, the study serves as a unique contribution by integrating policy design decisions based on public and open data.

Field measurement study on snow accumulation process around a cube during snowdrift

  • Wenyong Ma;Sai Li;Xuanyi Zhou;Yuanchun Sun;Zihan Cui;Ziqi Tang
    • Wind and Structures
    • /
    • v.37 no.1
    • /
    • pp.25-38
    • /
    • 2023
  • Due to the complexity and difficulty in meeting the multiphase flow complexity, similarity, and multiscale characteristics, the mechanism of snow drift is so complicated that the snow deposition prediction is still inaccurate and needs to be far improved. Meanwhile, the validation of prediction methods is also limited due to a lack of field-measured data about snow deposition. To this end, a field measurement activity about snow deposition around a cube with time was carried out, and the snow accumulation process was measured under blowing snow conditions in northwest China. The maximum snow depth, snow profile, and variation in snow depth around the cube were discussed and analyzed. The measured results indicated three stages of snow accumulation around the cube. First, snow is deposited in windward, lateral and leeward regions, and then the snow depth in windward and lateral regions increases. Secondly, when the snow in the windward region reaches its maximum, the downwash flow erodes the snow against the front wall. Meanwhile, snow range and depth in lateral regions have a significant increase. Thirdly, a narrow road in the leeward region is formed with the increase in snow range and depth, which results in higher wind speed and reforming snow deposition there. The field measurement study in this paper not only furthers understanding of the snow accumulation process instead of final deposition under complex conditions but also provides an important benchmark for validating prediction methods.

Bus-only Lane and Traveling Vehicle's License Plate Number Recognition for Realizing V2I in C-ITS Environments (C-ITS 환경에서 V2I 실현을 위한 버스 전용 차선 및 주행 차량 번호판 인식)

  • Im, Changjae;Kim, Daewon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.11
    • /
    • pp.87-104
    • /
    • 2015
  • Currently the IoT (Internet of Things) environments and related technologies are being developed rapidly through the networks for connecting many intelligent objects. The IoT is providing artificial intelligent services combined with context recognition based knowledge and communication methods between human and objects and objects to objects. With the help of IoT technology, many research works are being developed using the C-ITS (Cooperative Intelligent Transport System) which uses road infrastructure and traveling vehicles as traffic control infrastructures and resources for improving and increasing driver's convenience and safety through two way communication such as bus-only lane and license plate recognition and road accidents, works ahead reports, which are eventually for advancing traffic effectiveness. In this paper, a system for deciding whether the traveling vehicle is possible or not to drive on bus-only lane in highway is researched using the lane and number plate recognition on the road in C-ITS traffic infrastructure environments. The number plates of vehicles on the straight ahead and sides are identified after the location of bus-only lane is discovered through the lane recognition method. Research results and experimental outcomes are presented which are supposed to be used by traffic management infrastructure and controlling system in future.

A Development of Criteria for Evaluating School Zone by Utilizing Analytic Network Process (네트워크분석법(ANP)을 이용한 어린이보호구역 평가항목 개발)

  • Jeong, Kwang Seop;Kim, Tae Ho;Park, Je Jin;Won, Jai Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.191-197
    • /
    • 2009
  • This study choose the Criteria by conducting survey questionnaire of expertise, ANP analysis, and reviewing literature to samples of School Zone in a synthetic and reasonable way. It draws the estimating factors including a variety of existing aspects (user, facility, operation and management, and education and institution) from the analyses and applies ANP to reflect the decision making process. The results show as follows: first, first level of weights presents proportion of 'facility' and 'user' takes 65% of total weights. It implies that the facility protects children from obstacles is the top priority of the settings. second, the second level of weights present similar importance with the first level. Facility management, road to school, surroundings, safety facility, decelerating facility hold approximately 72% of overall levels. This indicates that improving and repairing surroundings, and safety and decelerating facility are the first priority to consider. These estimating indicators will be properly utilized to rationally appoint prevention zone with reflecting various factors and social class.

Driving Behavior Characteristics under Red Right Camera Enforcement at Signalized Intersections (신호교차로에서 무인교통단속 규제에 따른 주행 특성)

  • Han, Myungjoo;Lee, Soongbong;Kim, Hyeweon;Lee, YoungIhn;Kim, Sangok
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.63-73
    • /
    • 2016
  • PURPOSES : The objective of this study was to analyze variations in the vehicle driving behavior characteristics on signalized intersections according to the use of traffic enforcement camera (red light camera). METHODS : In order to analyze the driving behavior characteristics on signalized intersections when red light camera are installed, the target sites for investigation were selected depending on whether the red light camera is installed and accident rates increased after the installation. In particular, to analyze the characteristics of dilemma zones in signalized intersections, approach speed and deceleration speed of 3 type vehicles (passing vehicles during a yellow light, stopping at a yellow light, passing vehicles during a green light) were examined. Based on these data, the starting point, ending point, and distance of the dilemma zones were calculated. Also, the locations of increased traffic accidents and decreased accidents after the installation of the equipment were distinguished when analyzing the traffic accident characteristics. RESULTS : Analysis results revealed that there was a tendency for the dilemma zone distance to decrease after the installation of equipment(red light camera) in most sites. This tendency was found to be due to the decrease in the approaching speed of vehicles at intersections after the installation of equipment, resulting in the starting and ending points of dilemma zone to become closer to the stop line. Moreover, analysis showed that the number of traffic accidents decreased for most intersections after the installation of equipment and safety of the intersections increased somewhat. CONCLUSIONS : In general, installation of equipment(red light camera) caused the intersections approaching speed and dilemma zone distance to decrease. Decision-making is difficult for drivers in the dilemma zone, so the decrease in the dilemma zone distance implies an improvement in traffic safety. Furthermore, the number of accidents within intersections significantly decreased after the equipment was installed, leading to the conclusion that installation of the equipment affected the decrease in traffic accidents.

Evaluation Methodology of Greenhouse Gas On-Line Monitoring on Freeway (고속도로 구간의 온실가스 On-Line 모니터링 산정방법)

  • Lee, Soong-bong;Chang, Hyun-ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.2
    • /
    • pp.92-104
    • /
    • 2017
  • Previous management for speed in road traffic system was aimed only to the improvement of mobility and safety. However, consideration for the aspect of environment and energy consumption efficiency was valued less than the former ones. Nevertheless, economical damage scope caused by climate change has been increasing and it is estimated that environmental value will be increased because of the change of external circumstances. In addition, policy for reducing carbon emission in transportation system was assessed as insufficient in improving the condition of traffic road since it only focused on the transition of private vehicle into public transportation and development of eco-friendly car. Now it is the time to prepare for the adaptation strategy and precaution for the increased number of private vehicle in Korea. For this, paradigm shift in traffic operation which includes the policy not only about the mobility but also about caring environment would be needed. It is needed to be able to monitor the actual amount of greenhouse gas in real time to reduce the amount of emitted greenhouse gas in the aspect of traffic management. In this research, a methodology which can build on-line greenhouse gas emission monitoring system by using real time traffic data and predicting the circumstance in next 5 minutes was suggested.

New Methodology about the Criteria for Appointing School Zones (어린이보호구역 지정 기준의 방법론 제시에 관한 연구)

  • Kim, Yo-Sep;Park, Je-Jin;Park, Kwang-Won;Park, Seong-Yong;Kim, Jeong-Hyun
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.5
    • /
    • pp.29-40
    • /
    • 2008
  • Police agency is indicated that the number of children's traffic accident is tending downwards, however about one child is dead every day due to traffic accident. Major parts of the accidents happen during walking; among the rest, jaywalking is the biggest reason. Many accidents take plate on the road to school or near the home so government legislate children safeguard zone at 1995. According to the legislation, drivers have to reduce speed and there are safety facilities for children at children safeguard zone. This study finds the problems of children safeguard zone and suggest more effective and quantitative method for children safeguard zone. Firstly this study grasps the characters of children's pattern movement and children's traffic accident at children safeguard zone and then divides specific danger factors of children's traffic accident at children safeguard zone. Secondly, each factor is given danger level depending on danger degree and suggests effective method for assignment standard of children safeguard zone using all of these things.

The Estimated Evacuation Time for the Emergency Planning Zone of the Kori Nuclear Site, with a Focus on the Precautionary Action Zone

  • Lee, Janghee;Jeong, Jae Jun;Shin, Wonki;Song, Eunyoung;Cho, Cheolwoo
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.3
    • /
    • pp.196-205
    • /
    • 2016
  • Background: The emergency planning zone (EPZ) of the city of Busan is divided into the precautionary actions zone (PAZ) and the urgent protective action planning zone; which have a 5-km radius and a 20-km to 21-km radius from the nuclear power plant site, respectively. In this study, we assumed that a severe accident occurred at Shin-Kori nuclear unit 3 and evaluated the dispersion speed of radiological material at each distance at various wind speeds, and estimated the effective dose equivalent and the evacuation time of PAZ residents with the goal of supporting off-site emergency action planning for the nuclear site. Materials and Methods: The total effective dose equivalent, which shows the effect of released radioactive materials on the residents, was evaluated using the RASCAL 4.2 program. In addition, a survey of 1,036 residents was performed using a standardized questionnaire, and the resident evacuation time according to road and distance was analyzed using the VISSIM 6.0 program. Results and Discussion: According to the results obtained using the VISSIM and RASCAL programs, it would take approximately 80 to 252.2 minutes for permanent residents to move out of the PAZ boundary, 40 to 197.2 minutes for students, 60 to 232.2 minutes for the infirm, such as elderly people and those in a nursing home or hospital, and 30 to 182.2 minutes for those temporarily within the area. Consequently, in the event of any delay in the evacuation, it is estimated that the residents would be exposed to up to $10mSv{\cdot}h^{-1}$ of radiation at the Exclusion Area Boundaries (EAB) boundary and $4-6mSv{\cdot}h^{-1}$ at the PAZ boundary. Conclusion: It was shown that the evacuation time for the residents is adequate in light of the time lapse from the initial moment of a severe accident to the radiation release. However, in order to minimize the evacuation time, it is necessary to maintain a system of close collaboration to avoid traffic congestion and spontaneous evacuation attempts.

Performance Analysis of Adaptive Channel Estimation Scheme in V2V Environments (V2V 환경에서 적응적 채널 추정 기법에 대한 성능 분석)

  • Lee, Jihye;Moon, Sangmi;Kwon, Soonho;Chu, Myeonghun;Bae, Sara;Kim, Hanjong;Kim, Cheolsung;Kim, Daejin;Hwang, Intae
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.8
    • /
    • pp.26-33
    • /
    • 2017
  • Vehicle communication can facilitate efficient coordination among vehicles on the road and enable future vehicular applications such as vehicle safety enhancement, infotainment, or even autonomous driving. In the $3^{rd}$ Generation Partnership Project (3GPP), many studies focus on long term evolution (LTE)-based vehicle communication. Because vehicle speed is high enough to cause severe channel distortion in vehicle-to-vehicle (V2V) environments. We can utilize channel estimation methods to approach a reliable vehicle communication systems. Conventional channel estimation schemes can be categorized as least-squares (LS), decision-directed channel estimation (DDCE), spectral temporal averaging (STA), and smoothing methods. In this study, we propose a smart channel estimation scheme in LTE-based V2V environments. The channel estimation scheme, based on an LTE uplink system, uses a demodulation reference signal (DMRS) as the pilot symbol. Unlike conventional channel estimation schemes, we propose an adaptive smoothing channel estimation scheme (ASCE) using quadratic smoothing (QS) of the pilot symbols, which estimates a channel with greater accuracy and adaptively estimates channels in data symbols. In simulation results, the proposed ASCE scheme shows improved overall performance in terms of the normalized mean square error (NMSE) and bit error rate (BER) relative to conventional schemes.