• Title/Summary/Keyword: Schematic Design Phase

Search Result 36, Processing Time 0.027 seconds

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

A Study on Cost Estimate for Building Parts in the Schematic Design Phase -Focusing on Educational Research Facility- (부분별 코스트산정법을 활용한 계획설계 비용예측에 관한 연구 - 교육연구시설을 중심으로 -)

  • Kim, Yo-Han;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.18-25
    • /
    • 2011
  • Construction cost estimation in the early phase provides the opportunity to make reasonable decisions related to the project. For estimating this cost, various methods have been developed. But several problems have been recognized like accuracy, relation beteewn design and cost etc. In this study, we developed the method of cost estimating for building parts. The modified method has defferent ratio of space functions to calculate cost more correctly. Also historical cost data is used in this modified method for architects to estimate cost conveniently. By this modified method, we expects architects should easily design buildings based on cost.

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements (고층건물 수직·수평 요소기반 골조공사 개산견적 모델)

  • Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.3-10
    • /
    • 2014
  • High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

A Study on the phase angle detection of power source for PWM converter based on PLL method (PLL기법에 기반한 PWM 컨버터 전원 위상각 검출에 관한 연구)

  • Choi Cheol;Lee Sang-Hun;Kim Cheol-U
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.284-288
    • /
    • 2005
  • This paper proposes the direct detection method of phase angle for the power source, which is based on the PLL method. The proposed method using a bidirectional photo-coupler is used to directly detect the zero crossing of phase voltage and calculate the angular frequency in the controller based on a M/T algorithm. Through the method, the additional installation space in the traditional method using a potential transformer can be minimized and it can be easy to design. The paper presents straightforward schematic circuits, design and experimental results.

  • PDF

The Extraction for each Design phase using Environment-Friendly Design Factors by In-depth Evaluation of Experts in social housing (전문가집단 심층평가를 통한 사회주택 건축단계별 친환경적 계획요소 추출에 관한 연구)

  • Choi, Young-Oh;Choi, Moo-Hyuck
    • Journal of the Korean housing association
    • /
    • v.21 no.1
    • /
    • pp.1-9
    • /
    • 2010
  • Housing problems in city have being caused social contradiction that contains social discord and conflict between poor and rich. And they have raised one of social problems including a disequilibrium of demand and supply, a housing trouble, and a poor residential environment. Therefore, the purpose of this study is to suggest to the improvement of social housing that exposes to a poor environment for social integration. For this, this study is to extract environmental-friendly design factors for each building phase by in-depth evaluation of experts, and to analyze the problems of domestic social housing and environment-friendly design factors considered prior literature. The results as follow. It might be considered highly phase of schematic design, The building construction, and performance management having factors. Specially, it analyzed to 'Living Environment', 'Economic Efficiency', and 'renewable Energy Systems' should be considered highly. Ultimately, this study would be reconsidered the improvement of social housing proposed by the Government for the social outcast.

Development of Schematic Illustration for the Qi Related Terminology (동의생리학의 '기' 관련 용어 분류 및 개념 도식화 고안)

  • Kwon, Young Kyu;Chae, Han;Lee, Sang Jae
    • Journal of Physiology & Pathology in Korean Medicine
    • /
    • v.27 no.1
    • /
    • pp.20-25
    • /
    • 2013
  • The education of traditional Korean medicine has been challenged for the lack of illustrated explanation of fundamental and pivotal concepts. The purpose of this study was to make suggestions for the diagrammatic concept on Qi. Thorough review was made performed to elucidate pictorial concept of Qi with medical classics and textbooks on the human physiology based on the central theories including Yin-Yang, five phase, and correspondence between nature and human. Medical terminology and its taxonomy for the Qi were examined here. We proposed more clarified terminology and related metabolic pathways for the design of schematic illustration of Qi. This study would contribute to the development of introductive drawings and educational materials fit for the apprentice.

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

A House Design Method of Normative Modules adopting Hanok and Traditional Building Framing Skills

  • Park, Soo-Hoon
    • Journal of Korea Multimedia Society
    • /
    • v.21 no.3
    • /
    • pp.423-431
    • /
    • 2018
  • In this paper, we try to verify a normative module based house design procedure consisted of several sequential steps. The first step is to suggest formalization of designing so that we could clarify each phase and operation we are adopting in our design process. The second step is the clearing up the conceptual schema of traditional skills that we adopt and utilize from traditional Hanok framing techniques. The third step is to formulate adequate modular kits for the assembly of house design solutions for the schematic, conceptual and preliminary phases of designing. The fourth step is to implementing our ideas and methods to a proper computational platform such as Unity3D. The final step is to verify our symbolic descriptions of design formalization with the output of our experiments so that we have better understanding of design reasoning characteristics such as in house design.

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF