• Title/Summary/Keyword: Schedule network

Search Result 276, Processing Time 0.027 seconds

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Design of Neuro-Fuzzy based Intelligent Inference Algorithm for Energy Management System with Legacy Device (비절전 가전기기를 위한 에너지 관리 시스템의 뉴로-퍼지 기반 지능형 추론 알고리즘 설계)

  • Choi, In-Hwan;Yoo, Sung-Hyun;Jung, Jun-Ho;Lim, Myo-Taeg;Oh, Jung-Jun;Song, Moon-Kyou;Ahn, Choon-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.5
    • /
    • pp.779-785
    • /
    • 2015
  • Recently, home energy management system (HEMS) for power consumption reduction has been widely used and studied. The HEMS performs electric power consumption control for the indoor electric device connected to the HEMS. However, a traditional HEMS is used for passive control method using some particular power saving devices. Disadvantages with this traditional HEMS is that these power saving devices should be newly installed to build HEMS environment instead of existing home appliances. Therefore, an HEMS, which performs with existing home appliances, is needed to prevent additional expenses due to the purchase of state-of-the-art devices. In this paper, an intelligent inference algorithm for EMS at home for non-power saving electronic equipment, called legacy devices, is proposed. The algorithm is based on the adaptive network fuzzy inference system (ANFIS) and has a subsystem that notifies retraining schedule to the ANFIS to increase the inference performance. This paper discusses the overview and the architecture of the system, especially in terms of the retraining schedule. In addition, the comparison results show that the proposed algorithm is more accurate than the classic ANFIS-based EMS system.

A K Least Time Paths Searching Algorithm for Time Dependent Intermodal Transportation Networks with Departure Time Schedule Constraints (출발시간제약이 존재하는 동적 복합교통망의 K최소시간경로탐색)

  • Jo, Jong-Seok;Sin, Seong-Il;Mun, Byeong-Seop;Im, Gang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.3 s.89
    • /
    • pp.167-176
    • /
    • 2006
  • An minimum path algorithm for integrated networks with departure time constraints require considering arrival time of arriving mode, transfer time. waiting time, and departure time of next mode. Integrated network with diverse modes commonly include departure time constraints. Because public mode suck as train and airplane have fixed service schedule which provide passengers. This study developed the k-path algorithm in integrated network with time varying conditions and departure time constraints. We proposed the extended method based on entire path deletion method, and examined the application of the proposed algorithm through case study.

TLSA: A Two Level Scheduling Algorithm for Multiple packets Arrival in TSCH Networks

  • Asuti, Manjunath G.;Basarkod, Prabhugoud I.
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.8
    • /
    • pp.3201-3223
    • /
    • 2020
  • Wireless communication has become the promising technology in the recent times because of its applications in Internet of Things( IoT) devices. The IEEE 802.15.4e has become the key technology for IoT devices which utilizes the Time-Slotted Channel Hopping (TSCH) networks for the communication between the devices. In this paper, we develop a Two Level Scheduling Algorithm (TLSA) for scheduling multiple packets with different arrival rate at the source nodes in a TSCH networks based on the link activated by a centralized scheduler. TLSA is developed by considering three types of links in a network such as link i with packets arrival type 1, link j with packets arrival type 2, link k with packets arrival type 3. For the data packets arrival, two stages in a network is considered.At the first stage, the packets are considered to be of higher priority.At the second stage, the packets are considered to be of lower priority.We introduce level 1 schedule for the packets at stage 1 and level 2 schedule for the packets at stage 2 respectively. Finally, the TLSA is validated with the two different energy functions i.e., y = eax - 1 and y = 0.5x2 using MATLAB 2017a software for the computation of average and worst ratios of the two levels.

A MAC Protocol Considering Traffic Loads Information For a Clustered Wireless Sensor Networks (클러스터 기반의 무선 센서 네트워크 환경에서 트래픽 부하 정보를 고려한 MAC 프로토콜)

  • Kim, Seong-Cheol;Kim, Hyung-Jue
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.3
    • /
    • pp.113-119
    • /
    • 2009
  • In this paper, we proposed an efficient TDMA scheduling algorithm for a clustered Wireless Sensor Network. Since some previous algorithms used unnecessary idle period and schedule period in each frame. It became an overhead that might consume unexpected energy and delay data transmission. To solve this problem, a dynamic scheduling algorithm according to the number of member nodes and node traffic load within a cluster was suggested. Our proposed DS-MAC(Dynamic Scheduling MAC) could save energy and reduce transmission delay Then DS-MAC was analyzed mathematically to compare with the previous algorithms.

A Survey on Predicting Workloads and Optimising QoS in the Cloud Computing

  • Omar F. Aloufi;Karim Djemame;Faisal Saeed;Fahad Ghabban
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.2
    • /
    • pp.59-66
    • /
    • 2024
  • This paper presents the concept and characteristics of cloud computing, and it addresses how cloud computing delivers quality of service (QoS) to the end-user. Next, it discusses how to schedule one's workload in the infrastructure using technologies that have recently emerged such as Machine Learning (ML). That is followed by an overview of how ML can be used for resource management. This paper then looks at the primary goal of this project, which is to outline the benefits of using ML to schedule upcoming demands to achieve QoS and conserve energy. In this survey, we reviewed the research related to ML methods for predicting workloads in cloud computing. It also provides information on the approaches to elasticity, while another section discusses the methods of prediction used in previous studies and those that used in this field. The paper concludes with a summary of the literature on predicting workloads and optimising QoS in the cloud computing.

Behavioral Tendency Analysis towards E-Participation for Voting in Political Elections using Social Web

  • Hussain Saleem;Jamshed Butt;Altaf H. Nizamani;Amin Lalani;Fawwad Alam;Samina Saleem
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.2
    • /
    • pp.189-195
    • /
    • 2024
  • The issue "Exploring Social Media and Other Crucial Success Elements of Attitude towards Politics and Intention for Voting in Pakistan" is a huge study embracing more issues. The politics of Pakistan is basically the politics of semantic groups. Pakistan is a multilingual state more than six languages. There are 245 religious parties in Pakistan, as elaborated by the Daily Times research. The use of social media sites in Pakistan peaked to its maximum after announcement of election schedule by the Election Commission of Pakistan in March 22, 2013. Most of the political parties used it for the recent elections in Pakistan to promote their agenda and attract country's 80 million registered electors. This study was aiming to investigate the role of social media and other critical variables in the attitude towards politics and intention for voting.

A CSP-based Load Leveling Algorithm for Ship Block Erection Network

  • Ryu, Ji-Sung;Park, Jin-Hyoung;Kim, Hong-Tae;Lee, Byung-No;Shin, Jong-Gye
    • Journal of Ship and Ocean Technology
    • /
    • v.10 no.2
    • /
    • pp.37-44
    • /
    • 2006
  • The erection in shipbuilding is the process to assemble all the blocks one by one in certain order and requires more leveled and efficient schedule than other processes do. However, erection schedule includes too many constraints to be systemized with simple programs and constraints are changed frequently. These difficulties make it rare to find automatic erection schedule generation system with load leveling ability. In this paper, a CSP (Constraint Satisfaction Problem)-based load leveling algorithm using a maximum load diminution technique is proposed and applied to the block erection scheduling of a dock in a shipyard. The result shows that it performs better than currently used scheduling method based on empirical logics. The maximum load of welding length and crane usage are reduced by 31.63% and 30.00% respectively. The deviation of resource usage amount also decreases by 8.93% and 7.51%.

User context conjecture system using location and schedule information

  • Ogasawara, Naohito;Sato, Kiwamu;Nunokawa, Hiroshi;Shiratori, Norio;Noguchi, Shoichi
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2002.05a
    • /
    • pp.152-155
    • /
    • 2002
  • In recent years, with the spread of communication media, such as a cellular phone and E-mail, we are able to communicate with others without any restriction of position or time. However, complexity of communicative context has increased so that user has to guess a partner user's situation and status in order to use various medias efficiently. This problem will grow larger as new media are brought in the expanding communications network. To solve this problem, we propose the system that guesses the context in communication by a user's media from the position information on PHS (Personal Handy phone System) and schedule information from schedule application. In this system a user's agent guesses automatically the context that owner has set, and answers the demand of the context from a partner user. Moreover, the agent decides a suitable answer, when there is a demand of communication by the media, which cannot be used.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.