• 제목/요약/키워드: Schedule acceleration

검색결과 12건 처리시간 0.021초

도로터널 굴착공사의 적정공기 판단기준 (Optimum Construction Duration for Road Tunnel Excavation Works)

  • 김하나;김대영;김대영;정성춘;허영기
    • 대한건축학회논문집:구조계
    • /
    • 제34권4호
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.

Z축 운전구조를 갖는 선형 영구자석형 동기 전동기 운전제어에 관한 연구 (A study of control system on Permanent Magnet Linear Synchronous Motor with Z-axis operation structure)

  • 이진하;최철;박한웅;김철우
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(2)
    • /
    • pp.654-658
    • /
    • 2003
  • In this study a control system with variable gain schedule using real speed and moving direction is proposed to control a Permanent Magnet Linear Synchronous Motor (PMLSM) with Z-axis operation structure. The implementation of the controller is designed on the DSP TMS320C32 board. PMLSM is operated by using 4-point absolute positions profile with each velocity, acceleration and deceleration. The direction of the initial angle action for starting is set from the lower limit point to the upper limit point on PMLSM operation stroke. The effectiveness of a control system with variable gain schedule is demonstrated by some experimental results.

  • PDF

산업용 로보트를 위한 3차 다항식 조인트궤적의 구성과 최적화 (Formulation and optimization of cubic polynomial joint trajectories for industrial robots)

  • 김태산;배준경;박종국
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1988년도 한국자동제어학술회의논문집(국내학술편); 한국전력공사연수원, 서울; 21-22 Oct. 1988
    • /
    • pp.92-97
    • /
    • 1988
  • The path planning is done at the joint level. Cubic spline functions are used for constructing joint trajectories for industrial robots. For N-joint robot, Cartesian knots are transformed into N sets of joint displacements, with one set for each joint. For industrial application the speed of operation affects the productivity. An algorithm is developed to schedule the time intervals between each pair of adjacent knots such that the total traveling time is minimized subject to the physical constraints on joint velocties acceleration and jerks.

  • PDF

A Flexible Branch and Bound Method for the Job Shop Scheduling Problem

  • Morikawa, Katsumi;Takahashi, Katsuhiko
    • Industrial Engineering and Management Systems
    • /
    • 제8권4호
    • /
    • pp.239-246
    • /
    • 2009
  • This paper deals with the makespan minimization problem of job shops. The problem is known as one of hard problems to optimize, and therefore, many heuristic methods have been proposed by many researchers. The aim of this study is also to propose a heuristic scheduling method for the problem. However, the difference between the proposed method and many other heuristics is that the proposed method is based on depth-first branch and bound, and thus it is possible to find an optimal solution at least in principle. To accelerate the search, when a node is judged hopeless in the search tree, the proposed flexible branch and bound method can indicate a higher backtracking node. The unexplored nodes are stored and may be explored later to realize the strict optimization. Two methods are proposed to generate the backtracking point based on the critical path of the current best feasible schedule, and the minimum lower bound for the makespan in the unexplored sub-problems. Schedules are generated based on Giffler and Thompson's active schedule generation algorithm. Acceleration of the search by the flexible branch and bound is confirmed by numerical experiment.

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

힘제한 방법을 이용한 소형 위성의 진동시험 (Force Limited Vibration Tests of Micro-Satellites)

  • 김영기;김홍배;김경운;우성현;김성훈;문상무
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.446-451
    • /
    • 2004
  • Over testing problems of satellites and theirs components have been issued due to their effects on satellite development cost and schedule. Force limited vibration tests were introduced as solution of the problems in 1980s. Over testing phenomena occurs due to the lack of similarity on interface impedance. Force limited vibration tests control interface force to simulate actual interface impedance. In this research, force limited vibration tests are applied on two satellites environmental tests. Force limits are calculated by using TDFS method and Semi-Empirical method. Four force sensors are employed to control interface force. The tests prove that force limited control reduced maximum interface acceleration in order of 3.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • 국제초고층학회논문집
    • /
    • 제8권3호
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Z축 운전구조를 갖는 선형 영구자석형 동기 전동기 운전제어에 관한 연구 (A Study on the Control System of Permanent Magnet Linear Synchronous Motor Applied to the Z-axis Operation Structure)

  • 최철;이진하;박한웅;김철우
    • 전력전자학회논문지
    • /
    • 제9권2호
    • /
    • pp.142-149
    • /
    • 2004
  • 선형 영구자석형 동기 전동기는 기구학적인 변환 장치를 사용하는 기존의 방식과 비교하여 소음, 진동의 저감 및 가속도, 속도에 있어서 우수한 동특성을 가지고 있기 때문에 자동화 분야, 공작기계 및 반도체 장비를 중심으로 널리 사용되고 있다. 그러나 수직축(Z-axis)에 선형 영구자석형 동기 전동기가 적용될 경우에 제어를 위한 초기각 설정 및 상승, 하강 운전 특성을 향상시키기 위한 방법이 필요하다. 본 논문에서는 수직축 구조를 갖는 선형 영구자석형 동기 전동기의 초기각 설정 알고리즘 및 상승, 하강 운전 특성을 향상시키기 위해 실제 속도와 운전 방향을 변수로 하는 가변 이득 조절 알고리즘을 제안한다. 제안된 알고리즘들을 증명하기 위해서 4점의 절대위치 프로파일(profile)을 통해서 기존의 이득 시스템과 가변 이득 조절 시스템을 비교하여 제안된 알고리즘의 효용성을 검증하였다.

가이드 폭과 위치조절이 가능한 퍼팅훈련시스템 개발 및 유용성 평가 (Development and Evaluation of a Putting Training System with Changeable Guideline of Width and Distance)

  • 길세기;김장회;문제헌;박종철;김태완;김광준;이상철;황종학
    • 재활복지공학회논문지
    • /
    • 제8권4호
    • /
    • pp.275-281
    • /
    • 2014
  • 본 연구에서는 가이드 폭과 위치조절을 통해 퍼팅 시 순차적인 집중력 강화를 유도하여 퍼팅능력향상을 이끌어낼 수 있는 퍼팅훈련시스템을 개발하고 유용성을 평가하였다. 시스템의 하드웨어는 LEGO NXT 콘트롤러와 금속 Tetrix 세트를 이용하여 개발하였으며 소프트웨어는 LabVIEW ver. 2010을 사용하였다. 시스템의 유용성 평가를 위해 비숙련자 10인과 숙련자(KPGA) 5인에 대해 개발된 시스템의 폭 위치 변화 퍼팅훈련을 10세트 실시하고 의견을 조사하였다. 실험결과 손목부위에서의 속도 가속도 변화 감소 및 머리부위의 변위 감소를 확인할 수 있었으며, 의견조사에서 집중력 향상과 동기부여에 도움이 된다는 소견을 얻을 수 있었다. 본 시스템의 가이드 폭 위치 조절방식의 훈련법은 퍼팅을 위한 것으로 비슷한 운동구조를 갖는 노약자 장애인용 파크골프나 게이트볼 훈련에도 쉽게 적용이 가능할 것으로 판단된다.

  • PDF

실시간 열차 속도 프로파일 최적화 기법에 관한 연구 (A Study on the Real-time Optimization Technique for a Train Velocity Profile)

  • 김무선;김정태;박철홍
    • 한국산학기술학회논문지
    • /
    • 제17권8호
    • /
    • pp.344-351
    • /
    • 2016
  • 열차 운영사의 관점에서, 열차 운행에 관한 주요 관심사는 정해진 운행시간의 준수뿐만 아니라, 그와 동시에 열차 운행을 위해 소비되는 에너지 량을 최소화하는 것이다. 일반적인 수동 운전시, 기관사는 운행 노선의 특성에 따라 미리 규정된 최대 속도 프로파일을 기준으로, 노치를 제어함에 따라 규정 속도를 넘지 않도록 열차의 가감속을 조절한다. 이때 규정 속도를 준수하면서 동시에, 전체 운행 중에 소요되는 에너지 량의 절감을 위해, 기관사가 적절한 노치를 선택할 수 있는 구간별 노치 지정 가이드가 있어야 하며, 이는 운행구간에서의 노치 단계 최적화라는 절차를 통해 가능하다. 본 논문에서는 일반적인 운행 환경뿐만 아니라, 열차가 운행 중에 일시적으로 잔여구간의 트랙 정보 또는 규정속도 정보가 변경되는 이벤트 발생시에도 변화된 정보들을 기반으로 실시간으로 잔역구간의 노치 단계를 최적화 할 수 있는 유전 알고리즘을 활용한 실시간 노치 최적화 방안을 제안하였다. 또한 유전 알고리즘을 통해 얻어진 최적해를 적용할 때 에너지 절감 효과와 최적해 수렴특성에 관하여 분석하였다.