A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Development of Risk Management Process for KSLV-I Program (KSLV-I 사업을 위한 위험관리 프로세스 개발)

  • Yoo, Il-Sang;Cho, Kwang-Rae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.94-100
    • /
    • 2006
  • The risk management is an organized method for identifying and measuring risk and for selecting, developing, and implementing options for the handling of risk. The risk management covers all programatic and technical factors which affect the system development performance, cost, and schedule. While technical issues are primary concern for systems engineering, the three elements(performance, cost, and schedule) must be balanced for a successful risk management process. This paper proposes the risk management process for the KSLV-I(Korea Space Launch Vehicle-I) program using computer-aided systems engineering tool, Cradle. The risk management process of KSLV-I program is similar to the general risk management process, but it has its own specific features to manage large-scale complex characteristics of KSLV-I program.

Blog-based Schedule Risk Management System (블로그 기반 공정리스크 관리시스템)

  • Jin, Soo-Myeong;Yoon, You-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.47-56
    • /
    • 2009
  • As contemporary society becomes information-oriented, major construction companies have recently invested in information management, but small and medium ones have not. Though the small and medium companies recognize the information management is necessary and important, they don't have an ability to possess technical expertises. The purpose of this study is to develop a Schedule Risk Control System based on blogs using IT and web technologies for construction managers in small and medium construction companies. The system makes a chance to identify risk factors and prepare for responses to settle risks happened in preconstruction phases, and enables the managers and headquarters to predict and handle schedule risks by sharing information about risks on the blogs.

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF