A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

공정리스크 관리를 위한 BIM 적용 방안 (BIM Utilization Plan for Schedule Risk Management)

  • 이계현;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

공정리스크의 정량적 도출을 위한 기초적 방법 (Quantitively deducing basic method of construction schedule risk)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안 (Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase)

  • 류한국;김선국;이현수
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.119-127
    • /
    • 2005
  • 최근의 건설시장 축소와 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화에 따라 건설 수주 경쟁은 더욱 치열해지고 있다. 그러나 건설공사는 공기지 연을 유발하는 수많은 공정리스크가 존재하고 있으며 이러한 공정리스크에 대한 인식과 그에 따른 체계적인 관리가 부진한 경우 건설공사의 경쟁력을 확보하는 데 여러 어려움이 존재한다. 이러한 문제점을 해결하기 위한 기존 연구는 공정리스크의 분류, 공정 리스크의 관리, 리스크 관리를 위한 시스템 개발에 치중하였다. 이에 본 연구는 전체 공정에 영향력이 크며, 위험발생 확률이 높은 철근콘크리트공사를 대상공종으로 선정하고 기존연구를 바탕으로 수차례의 전문가 면담과 난상토론을 실시하여 현실적인 리스크 요인과 관리방안을 제시하였다.

건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 - (The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -)

  • 서상욱;윤유상;김선국
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.177-185
    • /
    • 2005
  • 건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.

KSLV-I 사업을 위한 위험관리 프로세스 개발 (Development of Risk Management Process for KSLV-I Program)

  • 유일상;조광래
    • 산업경영시스템학회지
    • /
    • 제29권1호
    • /
    • pp.94-100
    • /
    • 2006
  • The risk management is an organized method for identifying and measuring risk and for selecting, developing, and implementing options for the handling of risk. The risk management covers all programatic and technical factors which affect the system development performance, cost, and schedule. While technical issues are primary concern for systems engineering, the three elements(performance, cost, and schedule) must be balanced for a successful risk management process. This paper proposes the risk management process for the KSLV-I(Korea Space Launch Vehicle-I) program using computer-aided systems engineering tool, Cradle. The risk management process of KSLV-I program is similar to the general risk management process, but it has its own specific features to manage large-scale complex characteristics of KSLV-I program.

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

블로그 기반 공정리스크 관리시스템 (Blog-based Schedule Risk Management System)

  • 진수명;윤유상;장명훈;서상욱
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.47-56
    • /
    • 2009
  • 정보화 사회로의 전환으로 대변되는 최근의 건설 환경 변화로 인하여 대형 건설업체는 정보관리사업에 투자를하고 있는 반면, 중소형 건설업체는 정보관리시스템의 필요성을 인식하고 있음에도 불구하고 기술력의 부재로 인하여 정보 관리에 문제점을 가지고 있다. 더욱이 중소형 건설업체는 경쟁력 강화를 위한 범용적인 정보관리시스템의 부재로 인하여 중장기적으로 경쟁력 강화를 위한 효율적인 공정관리와 공정리스크 관리에 문제점을 가질 것으로 예상된다. 따라서 IT시스템 기반이 미비한 중소형 건설업체를 대상으로 공정관리 업무 수행에 필요한 정보를 제공하고 건설프로젝트 수행과정에서 존재하는 공정리스크 요인에 대해서 프로젝트 초기단계와 착공 전 단계에서 미리 대비하며, 경험이 부족한 건설현장 실무자에게 공정리스크 관리지식을 제공하기 위한 시스템이 필요하다. IT시스템 중에서도 최근 웹상의 연계 기술과 네트워크의 힘으로 인해서 효율적인 KM 실행 도구로 인식되고 있는 블로그를 공정리스크관리와 연계시켜 활용함으로써 공사경험이 부족한 현장관리자가 시공단계에서 발생할 가능성이 높은 공정리스크에 대해 착공 이전 단계에서 확인하고 관리대상리스크 선정 및 대응방법의 기준을 마련하기 위해 공정리스크관리 지원도구로서 블로그 기반의 공정리스크 관리 시스템을 개발하였다.

건설 공정리스크 관리도구 개발 및 활용방안 (The Development and Application of Schedule Management Tools in Building Construction)

  • 정우준;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.384-387
    • /
    • 2004
  • 건설프로젝트 참여자들이 전체공기에 영향을 미치는 공정리스크 관리에 대한 중요성을 공감하고 있지만 그에 대한 관리 절차 및 도구 등이 체계화되어있지 않아 어려움을 겪고 있다. 또한 발생한 리스크에 대한 대응방안 및 관리방법에 대한 연구는 비교적 활발히 추진되었지만 시공단계의 리스크를 착공 전 단계에 파악하고자 하는 노력은 부족하였다. 따라서 본 연구에서는 건설프로젝트 전체공기에 중요한 영향을 미치는 착공 전 단계에서의 공정 리스크 관리업무를 지원하기 위하여 공사프로세스 중심의 리스크 분류체계와 전산시스템 구축을 위해 요구되는 코드체계 및 공정리스크에 대한 사전대비를 위한 공정리스크 검토양식을 개발하고, 이에 대한 활용방안을 제시하고자 한다.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF