• Title/Summary/Keyword: Schedule Module

Search Result 69, Processing Time 0.024 seconds

Study on the Satellite Thermal Control Hardware Composed of Two Parallel Channels Working for Heat Pipe and Phase Change Material (열관과 상변화물질을 일체형으로 병렬 배열한 위성용 열제어 부품 연구)

  • Kim, Taig-Young;Hyun, Bum-Seok;Lee, Jang-Joon;Rhee, Ju-Hun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.11
    • /
    • pp.1087-1093
    • /
    • 2010
  • The satellite thermal control H/W composed of two parallel channels working for heat pipe (HP) and phase change material (PCM) is suggested for the high heat dissipating component which works intermittently with short duty. In a limited point of view, the HP-PCM device is a kind of off-the-shelf component that requires no dedicated configuration and thermal designs to PCM. Therefore, it can be used with less impact on the program cost and schedule different from most of the PCM applications. In present study the typical honeycomb structure radiator applying the HP-PCM device is designed and the detail thermal math model is developed for numerical analyses. The result comparison between without and with PCM shows that the HP-PCM device redistributes the peak heat around the whole mission period through the alternate melting and freezing of PCM, and, as a result, the maximum and minimum temperatures are effectively alleviated. The drawback of PCM application due to low thermal conductivity can be successfully resolved by means of parallel arrangement of HP channel.

Developing User Interfaces of Mobile PMIS Modules Based on Technology Demand Analysis (국내·외 사용자 기술수요 분석에 따른 모바일 PMIS UI개발)

  • Park, Kyung-Mo;Lee, Hyun Woo;Kim, Chang-Duk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.244-251
    • /
    • 2014
  • Project Management Information System (PMIS) has not yet fully met needs of the construction industry. Based on the deficiency of the current system, the present study performed a survey to identify a need for mobile PMIS in the industry. The survey revealed that most respondents expect the development of mobile PMIS would contribute to improving the productivity and efficiency of field operations. Based on the survey findings, this study proposes a suite of modules for mobile PMIS, which are focused on construction management, document management, schedule management, and field information management. Mobile PMIS would allow to access from the field through mobile devices by using tablet computers and smart-phones. The study also suggests that the effectiveness of the system can be enhanced by user interfaces that are customized for each module.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

A Development of Computerized Management System for Construction and Demolition Waste (건설해체공사의 폐기물 통합관리 시스템의 개발)

  • Kim, Chang Hak;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.627-634
    • /
    • 2006
  • Now, in a domestic country, the rebuilding and redevelopment of existing houses has been rapidly increasing with an economic growth and the improvement of living condition. As a result of that, a lot of C&D waste has been also produced. Nevertheless, it is not easy to find the research results for appropriate treatment and management of C&D waste in domestic. Therefore this study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse or recycle rate of material different from traditional demolition. The system makes it possible to plan and manage in advance quantity of C&D waste, demolition methods of each structural elements and application methods of produced C&D waste through an integrated and computerized system. The purpose of the system is ultimately to contribute to minimizing environmental damages and reducing construction waste quantity of a country. This system is largely composed of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management and each module can be also used individually according to the purpose of a user.

HW/SW Partitioning Techniques for Multi-Mode Multi-Task Embedded Applications (멀티모드 멀티태스크 임베디드 어플리케이션을 위한 HW/SW 분할 기법)

  • Kim, Young-Jun;Kim, Tae-Whan
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.8
    • /
    • pp.337-347
    • /
    • 2007
  • An embedded system is called a multi-mode embedded system if it performs multiple applications by dynamically reconfiguring the system functionality. Further, the embedded system is called a multi-mode multi-task embedded system if it additionally supports multiple tasks to be executed in a mode. In this Paper, we address a HW/SW partitioning problem, that is, HW/SW partitioning of multi-mode multi-task embedded applications with timing constraints of tasks. The objective of the optimization problem is to find a minimal total system cost of allocation/mapping of processing resources to functional modules in tasks together with a schedule that satisfies the timing constraints. The key success of solving the problem is closely related to the degree of the amount of utilization of the potential parallelism among the executions of modules. However, due to an inherently excessively large search space of the parallelism, and to make the task of schedulabilty analysis easy, the prior HW/SW partitioning methods have not been able to fully exploit the potential parallel execution of modules. To overcome the limitation, we propose a set of comprehensive HW/SW partitioning techniques which solve the three subproblems of the partitioning problem simultaneously: (1) allocation of processing resources, (2) mapping the processing resources to the modules in tasks, and (3) determining an execution schedule of modules. Specifically, based on a precise measurement on the parallel execution and schedulability of modules, we develop a stepwise refinement partitioning technique for single-mode multi-task applications. The proposed techniques is then extended to solve the HW/SW partitioning problem of multi-mode multi-task applications. From experiments with a set of real-life applications, it is shown that the proposed techniques are able to reduce the implementation cost by 19.0% and 17.0% for single- and multi-mode multi-task applications over that by the conventional method, respectively.

Area-efficient Interpolation Architecture for Soft-Decision List Decoding of Reed-Solomon Codes (연판정 Reed-Solomon 리스트 디코딩을 위한 저복잡도 Interpolation 구조)

  • Lee, Sungman;Park, Taegeun
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.3
    • /
    • pp.59-67
    • /
    • 2013
  • Reed-Solomon (RS) codes are powerful error-correcting codes used in diverse applications. Recently, algebraic soft-decision decoding algorithm for RS codes that can correct the errors beyond the error correcting bound has been proposed. The algorithm requires very intensive computations for interpolation, therefore an efficient VLSI architecture, which is realizable in hardware with a moderate hardware complexity, is mandatory for various applications. In this paper, we propose an efficient architecture with low hardware complexity for interpolation in soft-decision list decoding of Reed-Solomon codes. The proposed architecture processes the candidate polynomial in such a way that the terms of X degrees are processed in serial and the terms of Y degrees are processed in parallel. The processing order of candidate polynomials adaptively changes to increase the efficiency of memory access for coefficients; this minimizes the internal registers and the number of memory accesses and simplifies the memory structure by combining and storing data in memory. Also, the proposed architecture shows high hardware efficiency, since each module is balanced in terms of latency and the modules are maximally overlapped in schedule. The proposed interpolation architecture for the (255, 239) RS list decoder is designed and synthesized using the DongbuHitek $0.18{\mu}m$ standard cell library, the number of gate counts is 25.1K and the maximum operating frequency is 200 MHz.

The Effectiveness of School Based Short-Term Social Skills Training in Children with Attention-Deficit/Hyperactivity Disorder(ADHD) (ADHD 초등학생을 위한 학교 중심 사회성기술 훈련 프로그램의 효과에 대한 연구)

  • Paek, Myung-Jae;Ahn, Jung-Kwang;Lim, So-Yun;Kim, Yang-Ryul;Park, Min-Hyeon;Kim, Boong-Nyun;Cho, Soo-Churl;Shin, Min-Sup;Kim, Jae-Won;Kim, Hyo-Won
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.20 no.2
    • /
    • pp.82-89
    • /
    • 2009
  • Objectives: Children with attention-deficit hyperactivity disorder(ADHD) often have difficulties in social behavior. The aim of this study was to evaluate the effectiveness of a short-term training program for improving social skills, self-perception and attention deficits. Methods: The subjects were nine children diagnosed with ADHD with(or without) other mental disorders using the Diagnostic Interview Schedule for Children(DISC-ADHD) module. Children were given eight sessions of a social skills training program. Parents of children simultaneously participated in their own training which was designed to support their children's generalization of skills. Assessments included child, parent and teacher ratings of social skills, self-perception and attention deficit at baseline and post-treatment. Results: Social skills training led to significant improvements in child-reported measures of self-esteem, in teacher reported measures of social skills, and in parent-reported measures of attention deficit. Conclusion: This study suggests that short-term social skills training programs for children with ADHD may improve their social skills, self-perception and attention deficits.

  • PDF

A Indoor Management System using Raspberry Pi (라즈베리 파이를 이용한 실내관리 시스템)

  • Jeong, Soo;Lee, Jong Jin;Jung, Won Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.745-752
    • /
    • 2016
  • In the era of the Internet of Things, where all physical objects are connected to the Internet, we suggest a remote control system using a Raspberry Pi single-board computer with ZigBee, which can turn an indoor light-emitting diode (LED) and a multiple-tap on and off, and with a smart phone can control the brightness of the LED as well as an electronic door lock. By connecting an infrared (IR) transmitter module to the Raspberry Pi, we can control home appliances, such as an air conditioner, and we can also monitor indoor images, indoor temperatures, and illumination by using a smart phone app. We developed a method of finding out IR transmission codes required for remote-controllable appliances with an AVR micro-controller. We suggest a method to remotely open and shut an office door by novating the door lock. The brightness level of an LED (between 0 and 10) can be controlled through a PWM signal generated by an ATmega88 microcontroller. A mutiple-tap is controlled using an ATmega32, a photo-coupler, and a TRIAC. The signals for measured temperature and illumination are converted from analog to digital by using the ATtiny44A microcontroller transmitting to a Raspberry Pi through SPI communication. Then, we connect a camera to the CSI head of the Raspberry Pi. We can turn on the smart multiple-tap for a certain period of time, or we can schedule the multi-tap to turn on at a specific time. To reduce standby power, people usually pull out a power code from multiple-taps or turn off a switch. Our method helps people do the same thing with a smart phone, if they are away from home.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.