Browse > Article
http://dx.doi.org/10.5345/JKIBC.2014.14.3.244

Developing User Interfaces of Mobile PMIS Modules Based on Technology Demand Analysis  

Park, Kyung-Mo (School of Civil & Construction Engineering, Oregon State University)
Lee, Hyun Woo (School of Civil & Construction Engineering, Oregon State University)
Kim, Chang-Duk (Department of Architectural Engineering, Kwangwoon University)
Publication Information
Journal of the Korea Institute of Building Construction / v.14, no.3, 2014 , pp. 244-251 More about this Journal
Abstract
Project Management Information System (PMIS) has not yet fully met needs of the construction industry. Based on the deficiency of the current system, the present study performed a survey to identify a need for mobile PMIS in the industry. The survey revealed that most respondents expect the development of mobile PMIS would contribute to improving the productivity and efficiency of field operations. Based on the survey findings, this study proposes a suite of modules for mobile PMIS, which are focused on construction management, document management, schedule management, and field information management. Mobile PMIS would allow to access from the field through mobile devices by using tablet computers and smart-phones. The study also suggests that the effectiveness of the system can be enhanced by user interfaces that are customized for each module.
Keywords
mobile project management information system; user interface; demand analysis;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Kim EJ, Park MS, Lee HS. Suggestion of Safety Management Smartphone Application based on PMIS. Journal of the Architectural Institute of Korea. 2010 Oct 30;26(10):343-6.
2 Yoon YS, Suh SW, Jang GS, Choi JS. Improvement of Cost-Schedule integration based Progress Management through PMIS. Journal of the Korea Institute Construction Engineering and Management. 2013 Sep 30;14(5):144-52.   과학기술학회마을   DOI
3 Yoon SW, Chin SY, Shin TH, Choi CH. A Strategy for Building BIM+PMIS System. Journal of the Korea Institute Construction Engineering and Management. 2008 Oct 30;9(11):75-82.
4 Suh BG, Lee G, Yun SH. Adoption of Virtual Technology to the Development of a BIM based PMIS. Journal of the Korea Institute of Building Construction. 2013 Aug 20;13(4):333-40.   과학기술학회마을   DOI
5 Kim SG, Cho JI, Min BY, Kim GH, Kim CD. Proposal of Domestic Application through domestic & oversea mobile PMIS and BIM case analysis. Proceeding of Journal of the Korea Institute Construction Engineering and Management. 2012 Nov 11; Daegy, Korea Kyungpook (Korea): Journal of the Korea Institute Construction Engineering and Management. 2012 Nov 11;5(11):219-23.
6 Yu JH. Status and Expectation of Construction Project Management Information System. Journal of the Architectural Institute of Korea. 2006 Oct 30;22(10):25-8.
7 Giannotti A, Fisher D. Project Information Management System-Another Approach. Journal of Management in Engineering. 1993 Sep 30;10(1):52-63.
8 Bowden S.L. Application of mobile IT in construction: Loughborough University Institutional Repository. 2005.
9 Park KM, Im CW, Kim CD, Jeong HS. The Development of Next Generation Smart PMIS System. Journal of the Korea Institute Construction Engineering and Management. 2013 Mar 30;14(2):117-30.   과학기술학회마을   DOI   ScienceOn
10 Jo J, Yun SH. A Study of the Improvement through the present condition on Project Management Information System (PMIS). Journal of the Korea Institute Construction Engineering and Management. 2006 Nov 30;7(11):176-80.
11 Kim MJ, Jung TH, Noh GT, Koo KJ. Prototype Structure of integrated Document Forms for Construction PMIS based on Analysis. Journal of the Korea Institute Construction Engineering and Management. 2011 Sep 30;9(12):3-12.   과학기술학회마을   DOI
12 Sung MW, Kim KR, Lee SK, Yu JH. Effect of PMIS Quality on Intention to Use and User Satisfaction. Journal of the Korea Institute of Building Construction. 2012 Feb 30;2(1):122-33.   과학기술학회마을   DOI