Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.4
/
pp.159-167
/
2015
We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.
Journal of the Korea Society of Computer and Information
/
v.25
no.6
/
pp.119-129
/
2020
Software development activities are influenced by stochastic theory rather than deterministic one due to having process variability. Stochastic methods factor in the uncertainties associated with project activities and provides insight into the expected project outputs as probability distributions rather than as deterministic approximations. Thus, successful software projects systematically manage and balance five objectives based on historical probability: scope, size, cost, effort, schedule, and quality. Although software size estimation having much uncertainty in initial development has traditionally performed using deterministic methods: LOC(Lines Of Code), COCOMO(COnsructive COst MOdel), FP(Function Point), SLIM(Software LIfecycle Management). This research aims to present a function point method based on stochastic distribution and a case study based on Monte Carlo Simulation applying on an automotive electrical and electronics system software development. It is expected that the result of this paper is used as guidance for establishing of function point method in organizations and tools for helping project managers make decisions correctly.
Background: Health-care providers typically undergo shift work and are subjected to increased stress. Night shift work may induce disturbed sleep cycles and circadian rhythm. The objective of this study was to explore if night shift workers (NSWs) show an increased risk of abnormal thyroid-stimulating hormone (TSH). Methods: We conducted a retrospective cohort study of 574 employees without thyroid disease and abnormal TSH at baseline who underwent annual check-ups between 2007 and 2016 in a medical center. NSWs were defined as those with working time schedules other than daytime hours. We calculated the incidence rate and estimated the adjusted hazard ratio (HR) for incident abnormal TSH and subclinical hypothyroidism compared with non-NSWs using a Cox regression model. Results: A total of 56 incident abnormal TSH cases and 39 subclinical hypothyroidism cases in NSWs were identified during 3000 person-years of follow-up. In models adjusted for age, sex, obesity, and working departments, we found no increased relative risk for incident abnormal TSH (HR: 0.72, 95% confidence interval: 0.33-1.60) or subclinical hypothyroidism (HR: 0.52, 95% confidence interval: 0.19-1.45) when comparing NSWs to non-NSWs; nor were incidence rates significantly different among exclusively medical employees after excluding administrative staff. Conclusion: In this hospital-based nine-year follow-up retrospective cohort study, NSWs were not associated with increased relative risk of incident abnormal TSH and subclinical hypothyroidism, in contrast to previous cross-sectional studies.
The purpose of this study is to investigate the current status and causes of misclassification of school records and to suggest the directions to improve the School Records Management Criteria Table(general disposition authority for school records), which will lead to misclassification reducement. This study begins with analysing the records created or received in four schools sampled for one year to investigate the status and causes of misclassifications. A advisory group including four administrative officers and seven records managers was formed and group meeting was held twice to identify the causes of the misclassification and to suggest alternatives. In this study, 33 unit tasks(transactions) with frequent misclassification were identified, and the cause of misclassification was analyzed based on focus group interviews. The main causes of misclassification were categorized into two types. This study concludes with suggesting the improvement of the School Records Management Criteria Table for addressing the causes, including commentary reinforcement and the addition of workflow to complex tasks.
Yun, Eun Ji;Lee, Yo Seb;Hong, Mi Yeong;Park, Mi Sook
Health Policy and Management
/
v.31
no.2
/
pp.173-179
/
2021
Background: In Korea, the length of stay and medical expenses incurred by medical aid patients are increasing at a rate faster than the national health insurance. Therefore, there is a need to create a management strategy for each type of hospitalization to manage the length of stay of medical aid patients. Methods: The study used data from the 2019 National Health Insurance Claims. We analyzed the factors that affect the length of stay for 186,576 medical aid patients who were hospitalized for more than 31 days, with a focus on the type of hospitalization in long-term care hospitals. Results: The study found a significant correlation between gender, age, medical aid type, chronic disease ratio, long-term care hospital patient classification, and hospitalization type variables as factors that affect the length of hospital stay. The analysis of the differences in the length of stay for each type of hospitalization showed that the average length of stay is 291.4 days for type 1, 192.9 days for type 2, and 157.0 days for type 3, and that the difference is significant (p<0.0001). When type 3 was 0, type 1 significantly increased by 99.4 days, and type 2 by 36.6 days (p<0.0001). Conclusion: A model that can comprehensively view factors, such as provider factors and institutional factors, needs to be designed. In addition, to reduce long stays for medical aid patients, a mechanism to establish an early discharge plan should be prepared and concerns about underutilization should be simultaneously addressed.
International Journal of Computer Science & Network Security
/
v.21
no.1
/
pp.137-142
/
2021
The Internet of Things (IoT) paradigm is at the forefront of present and future research activities. The huge amount of sensing data from IoT devices needing to be processed is increasing dramatically in volume, variety, and velocity. In response, cloud computing was involved in handling the challenges of collecting, storing, and processing jobs. The fog computing technology is a model that is used to support cloud computing by implementing pre-processing jobs close to the end-user for realizing low latency, less power consumption in the cloud side, and high scalability. However, it may be that some resources in fog computing networks are not suitable for some kind of jobs, or the number of requests increases outside capacity. So, it is more efficient to decrease sending jobs to the cloud. Hence some other fog resources are idle, and it is better to be federated rather than forwarding them to the cloud server. Obviously, this issue affects the performance of the fog environment when dealing with big data applications or applications that are sensitive to time processing. This research aims to build a fog topology job scheduling (FTJS) to schedule the incoming jobs which are generated from the IoT devices and discover all available fog nodes with their capabilities. Also, the fog topology job placement algorithm is introduced to deploy jobs into appropriate resources in the network effectively. Finally, by comparing our result with the state-of-art first come first serve (FCFS) scheduling technique, the overall execution time is reduced significantly by approximately 20%, the energy consumption in the cloud side is reduced by 18%.
Objectives: The combination of Harm-Avoidance (HA) and Self-Directedness (SD) of Temperament and Character Inventory (TCI) has been reported pivotal for mental health; however its clinical usefulness in integrative medicine has not sufficiently reported. The purpose of this study was to illustrate multi-phasic mental health of subjective satisfaction with life, emotional well-being, and psychopathology, following the HA-SD profile groups. Methods: A total of 527 Korean university students reported HA and SD scores as to render their HA-SD profile, and multi-phasic mental health characteristics using Satisfaction with Life Scale (SWLS), Positive Affect and Negative Affect Schedule (PANAS), and Beck Depression Inventory (BDI) with composite well-being scales of SC (Sum of Self-Directedness and Cooperativeness score) and HI (Happiness Index, subtraction of Negative Affect (NA) score from Positive Affect (PA) score) as standardized. Pearson's correlation was used to report correlation coefficient, and the ANCOVA with age and sex as covariates, to show significant differences in mental health and well-being between the HA-SD profile groups. Results: The HA-SD profile groups showed distinctive multi-phasic mental health characteristics; health related scores of SWLS, PA, SC and HI decreased following the order of hS (low HA and high SD), HS (high HA and high SD), hs (low HA and low SD) and Hs (high HA and low SD) profile groups; however the non-health related scores of NA and BDI showed contrasting order. Conclusions: The HA-SD profile was found to be clinically useful for examining multi-phasic mental health and well-being status, and the TCI may be an imperative personality inventory for integrative medicine.
International conference on construction engineering and project management
/
2009.05a
/
pp.1140-1147
/
2009
Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.
International conference on construction engineering and project management
/
2022.06a
/
pp.484-491
/
2022
A paradigm shift in teaching modular construction in higher education and K-12 is proposed as a means to increase the future adoption of the modular construction technique. To this effect, a new education module is presented to STEM educators. This education module is based on LEGOs and directed towards educators in the architecture, engineering, and construction (AEC) industry. The main objectives of the education module are to increase interest and knowledge of modular construction, acknowledge the benefits of using 3D design with 4D scheduling, and create a simulating hands-on educational opportunity. The education module is designed to allow participants to experience a hands-on simulation of modular construction and stick-built construction through building a LEGO project. Participants are challenged to find the advantages and disadvantages in both construction systems first-hand and record their findings. Results are presented from the preliminary testing of this education model on a group of construction management students at the University of Nevada, Las Vegas. Overall, the survey results showed that the LEGO education module was successful at achieving the project's three main objectives: 1) increasing the participants' interest and knowledge of modular construction through an interactive project; 2) increasing the participants' understanding of the benefits of 3D design with 4D scheduling over the use of 2D drawings; and 3) creating a simulating hands-on educational opportunity to help participants compare modular construction to stick-built construction. In the end, this proposed a new LEGO education module addressing the problems identified from this study with more participants.
Journal of Korean Academic Society of Home Health Care Nursing
/
v.30
no.1
/
pp.15-25
/
2023
Purpose: This study describes the associations between shift work factors, workplace violence bystander types, and the missed nursing care of hospital nurses. Methods: A cross-sectional survey was conducted among hospital nurses using structured questionnaires related to shift work factors, workplace violence bystander types, and missed nursing care. The study participants were 199 nurses caring for adult patients and working in two tertiary hospitals. Results: The missed nursing care of the participants showed a statistically significant positive correlation with the facilitating bystander (r=.40, p<.001) and abdicating bystander (r=.28, p<.001) among the workplace violence bystander types. However, rest time during duty showed a significant negative correlation (r=-.16, p=.026). A regression model with control variables (department and clinical career), shift work factors, and workplace violence bystander types explained approximately 25% of missed nursing care of the study participants. Further, the facilitating bystander type influenced the missed nursing care of hospital nurses. Conclusion: As a result of examining the associations between shift work factors, workplace violence bystander types, and missed nursing care of hospital nurses, it was confirmed that missed nursing care was influenced by the facilitating bystander type. It is necessary to improve the nursing culture within the department so that nurses do not behave as negative bystanders to workplace violence.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.