• Title/Summary/Keyword: Schedule Management

Search Result 1,272, Processing Time 0.027 seconds

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Opportunity Tree and Algorithm design to schedule management (일정관리를 위한 Opportunity Tree 및 알고리즘 설계)

  • Lee, Eun-Se;Lee, Sang-Ho
    • The KIPS Transactions:PartD
    • /
    • v.12D no.7 s.103
    • /
    • pp.965-978
    • /
    • 2005
  • There are many defects that cause the schedule and qualify problems during software development. This paper designs the opportunity tree framer work that removes and manages the schedule and quality problems as well. For the similar projects, we can estimate defects and prepare to solve them by using domain expert knowledge and the opportunity tree framework which can greatly improve the software process. This research provides solution of schedule defect problem and detection of defect and its causes that happen on software development.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

Application of Linear Schedule Chart for Schedule Management of Linear Construction Project (선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안)

  • Lee, Jaehee;Kang, Hyojeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.13-23
    • /
    • 2023
  • Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

Some Conjectures for the Newsvendor Problem under Progressive Multiple Discounts (점진적 복수할인이 있는 뉴스벤더 문제에 관한 몇 가지 추측)

  • Won, You-Kyung
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.36 no.3
    • /
    • pp.27-43
    • /
    • 2011
  • This paper investigates properties of the newsvendor problem under a schedule involving progressive multiple discounts compared with the standard newsvendor problem under a no-discounts schedule. Unlike most conventional approaches using the criticial fractile to analyze the retailer and/or supplier behavior(s) in the newsvendor problem, our approach uses riskless profit. From the properties revealed through a series of computational experiments, two conjectures regarding the relationship between the expected profits of both newsvendor problems as a generalization over Khouja's argument (1995) are raised. Those conjectures encourage newsvendors who may face budget or warehouse capacity restriction to use the extended model under a multiple-discounts schedule rather than the standard model with no-discounts schedule because they apply for every order quantity as well as the optimal order quantity. In addition to the conjectures, some insightful results are found to justify the implementation of a multiple-discounts schedule from the computational experiments and a new interpretation for implementation of a multiple-discounts schedule that has not been addressed in Khouja is provided.

A Study on the Visualization of an Airline's Fleet State Variation (항공사 기단의 상태변화 시각화에 관한 연구)

  • Lee, Yonghwa;Lee, Juhwan;Lee, Keumjin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.2
    • /
    • pp.84-93
    • /
    • 2021
  • Airline schedule is the most basic data for flight operations and has significant importance to an airline's management. It is crucial to know the airline's current schedule status in order to effectively manage the company and to be prepared for abnormal situations. In this study, machine learning techniques were applied to actual schedule data to examine the possibility of whether the airline's fleet state could be artificially learned without prior information. Given that the schedule is in categorical form, One Hot Encoding was applied and t-SNE was used to reduce the dimension of the data and visualize them to gain insights into the airline's overall fleet status. Interesting results were discovered from the experiments where the initial findings are expected to contribute to the fields of airline schedule health monitoring, anomaly detection, and disruption management.