Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

A Review of Quality Management and Improvement of Trauma Fee Schedule in Regional Trauma Center (권역외상센터의 질 관리와 수가 개선 현황)

  • Seo, Eun-Won;IM, Jeehye
    • Health Policy and Management
    • /
    • v.31 no.4
    • /
    • pp.399-408
    • /
    • 2021
  • The emergency medical service system in Korea was built upon the Emergency Medical Service Act, 1995 to respond adequately to be much in demand for emergency medical services. In addition, the government recognized the importance of the trauma care system and set out to plan for the designation and establishment of the regional trauma center by 2012. This study aimed to investigate features of quality management and trauma fee schedule on better understanding of trauma care system. First, quality management of the regional trauma center has been implemented by several quality programs involved in quality assessment, committee on trauma quality management, and mortality and morbidity conference. Second, the trauma fee schedule has reflected a specific quality of severe traumatic conditions and added the result to it, which are graded A, B, and C according to quality assessment. Although the government has contributed to instituting a trauma quality assessment program and trauma fee schedule for the regional trauma center, it could not lead to such a fixed standard for quality management of them. Therefore, it will promote discussion on the sustainability of the regional trauma center that requires reducing preventable trauma death rate and the way to apply comprehensive quality management.

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

Research of Earned Schedule Method to forecast progressed schedule of IT Project (IT 프로젝트 수행 시 추진 일정 예측을 위한 Earned Schedule Method 활용에 관한 연구)

  • Eom, Seung-Wook;Lee, Seouk-Joo;Kang, Jae-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1352-1355
    • /
    • 2011
  • Earned value management(EVM)는 프로젝트 진행 상태를 파악하기 위해 주로 비용과 일정 편차, 성과지표를 통합하여 분석하는 것으로 비용/원가 관리를 위해 발전되어 사용되어 왔다. 그러나 최근에는 경영환경 변화에 따라 불확실성이 증가하여 프로젝트 전체 일정의 예측에 대한 성과지표로 사용되고 있다. 본 연구에서, 비용관점에서 분석된 earned value management의 성과 지표와 시간관점에서 분석된 earned schedule의 성과 지표를 비교하여 차이점을 도출하고 비용관점에서의 지표가 프로젝트 전체 일정을 예측하는 것에서는 신뢰성이 떨어지는 현상을 발견하였다. 향후 본 연구를 통해 프로젝트 비용관리와 더불어 earned schedule의 성과 지표를 이용한 일정 예측을 통해 성공적인 프로젝트 수행에 도움이 되도록 하고자 한다.

Schedule Management for Outside Duty Personnels Using Mobile Communication Data Synchronization (이동통신 자료 동기화를 이용한 외근 사원 일정관리)

  • Jang, Dae-Jin;Park, Kee-Hyun;Ju, Hong-Taek;Yoo, Sang-Jin
    • Information Systems Review
    • /
    • v.8 no.2
    • /
    • pp.1-15
    • /
    • 2006
  • Schedule Management for outside duty personnels and their groups is fairly difficult since they spend most of their time on working outside individually rather than inside office. Everytime when schedule change for personnels or their groups is needed, it is necessary to call every personnel in order to notify the schedule change. It would be much easier to handle the schedule management problem if outside duty personnels are able to download schedule of their groups(and, upload their schedule) using their mobile communication devices such as PDAs. In this paper, using a data synchronization protocol in mobile communication environments, a schedule management system for outside duty personnels is designed and implemented. Data synchronization in mobile communication environments is a process of maintaining consistency between data stored in mobile devices and data stored in a (central) server at office. In other words, using SyncML data synchronization protocol proposed by OMA(Open Mobile Alliance) as an open standard for data synchronization in mobile communication environments, a schedule management system for outside duty personnels which allows them to check schedule of their groups and to notify their schedule to their groups at anytime anyplace is designed and implemented.

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.