• Title/Summary/Keyword: Scale-up facility

Search Result 104, Processing Time 0.026 seconds

3D Modeling and Simulation using Virtual Manipulator (가상 조작기를 이용한 3D 모델링 및 시뮬레이션)

  • Park, Hee-Seong;Kim, Ho-Dong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.547-550
    • /
    • 2011
  • The purpose of this paper is to verify and validate the maintenance tasks of the construction of a nuclear facility using a digital mock-up and simulation technology instead of a physical mock-up. Prior to the construction of a nuclear facility, a remote simulator that provides the opportunity to produce a complete digital mock-up of the PRIDE (Pyroprocess Integrated Inactive DEmonstration Facility) region and its remote handling equipment, including operations and maintenance procedures has been developed. In this paper, the system architecture and graphic user interface of a remote simulator that coincides with the extraordinary nature of a nuclear fuel cycle facility is introduced. In order to analyze the remote accessibility of a remote manipulator, virtual prototyping that was performed it by using haptic device of external input devices under a 3D full-scale digital mock-up is explained.

A Conceptual Design Study for a Spent Fuel Pyroprocessing Facility of a Demonstration Scale (사용후핵연료 파이로 처리공정 실증시설의 개념설계 연구)

  • Yoo, Jae-Hyung;Hong, Kwon-Pyo;Lee, Han-Soo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.3
    • /
    • pp.233-244
    • /
    • 2008
  • A conceptual design study for a pyroprocesing facility, has been carried out in this study, which is available for the recovery of uranium and transuranic elemental group(TRU), that is, reusable as a nuclear fuel especially in a next generation-type reactor. The scale of this facility has been chosen as 20 kg HM/batch, comparatively small engineering size in order to collect scale-up data for the design of a commercial facility as well as to get operational experience. The spent fuel to be handled in this process is as follows : 3.5 % enriched uranium fuel, 35,000MWd/tU and 5-year cooled. The major items considered in the conceptual study are a building lay-out including various hot cells, safety management of the process operation in conjunction with material balance control, radiation safety, inert atmosphere control in shielded hot cells, and criticality control of uranium and TRU products.

  • PDF

ASSESSMENT OF ACTIVITY-BASED PYROPROCESS COSTS FOR AN ENGINEERING-SCALE FACILITY IN KOREA

  • KIM, SUNGKI;KO, WONIL;BANG, SUNGSIG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.7
    • /
    • pp.849-858
    • /
    • 2015
  • This study set the pyroprocess facility at an engineering scale as a cost object, and presented the cost consumed during the unit processes of the pyroprocess. For the cost calculation, the activity based costing (ABC) method was used instead of the engineering cost estimation method, which calculates the cost based on the conceptual design of the pyroprocess facility. The calculation results demonstrate that the pyroprocess facility's unit process cost is $194/kgHM for pretreatment, $298/kgHM for electrochemical reduction, $226/kgHM for electrorefining, and $299/kgHM for electrowinning. An analysis demonstrated that the share of each unit process cost among the total pyroprocess cost is as follows: 19% for pretreatment, 29% for electrochemical reduction, 22% for electrorefining, and 30% for electrowinning. The total unit cost of the pyroprocess was calculated at $1,017/kgHM. In the end, electrochemical reduction and the electrowinning process took up most of the cost, and the individual costs for these two processes was found to be similar. This is because significant raw material cost is required for the electrochemical reduction process, which uses platinum as an anode electrode. In addition, significant raw material costs are required, such as for $Li_3PO_4$, which is used a lot during the salt purification process.

Scale-up of Melting Chamber for a Pyrolysis Melting Incinemtion System (폐기물 열분해/용융 소각 시스템의 용융로 Scale-up 연구)

  • Yang, Won;Kim, Bong-Keun;Yu, Tae-U;Jeun, Keum-Ha
    • 한국연소학회:학술대회논문집
    • /
    • 2007.05a
    • /
    • pp.168-175
    • /
    • 2007
  • Ash melting chamber is one of the key facility of the pyrolysis-melting incineration system, and it should be designed and operated very carefully for avoiding solidification of slag. In this study, an example of numerical and experimental scale-up process of the melting chamber, in which high speed air is injected to the molten slag and generates bubbles, which enhances agitation of the slag and char combustion, is presented. Cold flow test, combustion and melting test in a lab-scale (30 kg/hr) chamber and a pilot scale (200 kg/hr) chamber. Minimum energy for maintaining molten slag is derived, and it was found that the molten slag can be maintained efficiently by concentrating heat into the bubbling slag.

  • PDF

An Analysis of Relation between Supply Criteria of Public Facilities and Residents' Satisfaction for the Community Revitalization in the Apartments (공동주택 내 커뮤니티 활성화를 위한 주민공동시설 설치기준과 주민 만족도와의 관계 분석)

  • Choi, Ki-Taek;Lee, Joo-Hyung
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.19-28
    • /
    • 2011
  • This study examines the current status on the supply of community facilities based on the supply criteria of present welfare facilities. Analyzing satisfaction of residents about community facilities based on physical supply criteria. The study sets up the concept and proposed trend of the related studies and distinction through the examination of previous researches. Next, the present systematical supply criteria, was used to make indication in order to propose the promotion of improvement on supply criteria for community facilities. Multi dimensional analyzing system and the satisfaction level of the community facility was used to analyze the relationship between the two. The direction of policy improvement according to the analysis is as per the following. First, it is necessary to improve supply criteria of household to guarantee the minimal amount of space. Second, specification of the minimum distance of community facility to residential area in the complex is needed. Also, the presentation of bottom boundary line of the formation area size to expand the size up to minimal level of size is needed. Third, resident exercise facility supply criteria among the community facility supply criteria need to be improved from the number of household base to the size for each household base. Forth, resident resting facility criteria among the community facility supply criteria should be changed from the present criteria of one facility per five hundred households.

Slitting Test of Simulated Fuel Rod by Using a Newly Developed Decladding Device (실증용 탈피복 장치를 이용한 모의 핵연료 슬릿팅 시험)

  • Jung, J.H.;Hong, D.H.;Kim, Y.H.;Park, B.S.;Lee, J.K.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2006.05a
    • /
    • pp.141-144
    • /
    • 2006
  • In this study, we developed a decladding device which separates 250 mm length of simulated nuclear spent fuel rod into the pallets and the pieces of the hulls after inserting the rod cut into the module with several pairs of blades. To improve the performance of the equipment, we considered some mechanisms to prevent the rod cut from being exposed or bounced into the hot-cell, to reduce the operation time, and to insert the rods automatically. It is expected that the newly developed system will contribute to prevent radioactive pollution in the hot-cell, reduce the operation time, and to increase the safety of the operators. As a result of the performance test for some mockup fuel rod cuts in the ACP(Advanced Spent Fuel Control Process) facility, it was verified that the decladding device could be applied to the actual fuel rod cut. And it will be able to use for a scale-up facility in the future.

  • PDF

HOT CELL RENOVATION IN THE SPENT FUEL CONDITIONING PROCESS FACILITY AT THE KOREA ATOMIC ENERGY RESEARCH INSTITUTE

  • YU, SEUNG NAM;LEE, JONG KWANG;PARK, BYUNG SUK;CHO, ILJE;KIM, KIHO
    • Nuclear Engineering and Technology
    • /
    • v.47 no.6
    • /
    • pp.776-790
    • /
    • 2015
  • Background: The advanced spent fuel conditioning process facility (ACPF) of the irradiated materials examination facility (IMEF) at the Korea Atomic Energy Research Institute (KAERI) has been renovated to implement a lab scale electrolytic reduction process for pyroprocessing. The interior and exterior structures of the ACPF hot cell have been modified under the current renovation project for the experimentation of the electrolytic reduction process using spent nuclear fuel. The most important aspect of this renovation was the installation of the argon compartment within the hot cell. Method: For the design and system implementation of the argon compartment system, a full-scale mock-up test and a three-dimensional (3D) simulation test were conducted in advance. The remodeling and repairing of the process cell (M8a), the maintenance cell (M8b), the isolation room, and their utilities were also planned through this simulation to accommodate the designed argon compartment system. Results and conclusion: Based on the considered refurbishment workflow, previous equipment in the M8 cell, including vessels and pipes, were removed and disposed of successfully after a zoning smear survey and decontamination, and new equipment with advanced functions and specifications were installed in the hot cell. Finally, the operating area and isolation room were also refurbished to meet the requirements of the improved hot cell facility.

Scaling analysis of the pressure suppression containment test facility for the small pressurized water reactor

  • Liu, Xinxing;Qi, Xiangjie;Zhang, Nan;Meng, Zhaoming;Sun, Zhongning
    • Nuclear Engineering and Technology
    • /
    • v.53 no.3
    • /
    • pp.793-803
    • /
    • 2021
  • The small PWR has been paid more and more attention due to its diversity of application and flexibility in the site selection. However, the large core power density, the small containment space and the rapid accident progress characteristics make it difficult to control the containment pressure like the traditional PWR during the LOCA. The pressure suppression system has been used by the BWR since the early design, which is a suitable technique that can be applied to the small PWR. Since the configuration and operating conditions are different from the BWR, the pressure suppression system should be redesigned for the small PWR. Conducting the experiments on the scale down test facility is a good choice to reproduce the prototypical phenomena in the test facility, which is both economical and reasonable. A systematic scaling method referring to the H2TS method was proposed to determine the geometrical and thermohydraulic parameters of the pressure suppression containment response test facility for the small PWR conceptual design. The containment and the pressure suppression system related thermohydraulic phenomena were analyzed with top-down and bottom-up scaling methods. A set of the scaling criteria were obtained, through which the main parameters of the test facility can be determined.

R&D Status of NOx and Flue-gas Treatment Technologies in KIER (KIER의 NOx 및 연소배가스 처리기술 개발현황)

  • Min, Byoung-Moo;Choi, Sang-Il
    • 한국연소학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.295-300
    • /
    • 2003
  • In Korea, the emission standards for air pollutants will be more tighten from Jan. 2005. Especially, the new emission standards is focused on the nitrogen oxide. From this trend of standards, nitrogen oxide emission is hot issue in energy fields. Also, we have a new environmental problem, the carbon dioxide emission, which are related to the global warming. To solve the environmental problems, we must define the situation of clean-up technologies level in Korea and decide the direction of R&D for flue gas cleaning technologies. Now, this paper discus briefly on the De-NOx R&D activities and the large scale testing facility for flue gas clean-up technologies in Korea Institute of Energy Research. These discussions are contribute to the increasing of the R&D activities for flue gas clean-up technologies in Korea.

  • PDF

The Analysis of Present Condition and Utilization Planning of Closed School in Chungbuk Province (충북(忠北) 미활용(未活用) 폐교(閉校)의 실태(實態)와 활용방안(活用方案)에 대한 조사연구(調査硏究))

  • Jung, Jinju;Park, Seungryeol;Kim, Seunggeun;Choi, Hyoseung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.2 no.2
    • /
    • pp.23-34
    • /
    • 2000
  • Many primary schools that have been an important role in the community at the same time local important facility not only local area but also all area in Korea have shown a situation for closing and into grating a school because of a social and political measure. The education policy for man power training and closing policy for small scale school not more than 100 students can't role in the rural development policy, coming farming and fishing villages. The reasons for thinking some application paradigm and closing schools have been important role in the point of education and culture parts. Of course, the application paradigm for closing school facility will get accomplished for a mood of local residents and a point of cultural deference, not keeping up unconditionally for closing a school. For accomplishing versatile purposes, initiative role of the organs of local education is very important. The organs of local education have an application paradigm that closing schools are the facilities for local organs of education will plan some specific facility to be matched for local special quality and connection quality of surrounding facility and environment. Before an application paradigm of closing school, it is very important that a fundamental factor for negligence the facility will be solved. Eventually, the organs of education have a plan for technical study of this paradigm and consider keeping and mending of closing facility, rent the facility for payment or not they want, and confer money problem not an unconditional scale.

  • PDF