Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

Field Application of Surface Insulation Curing Method to Cold Weather Concreting (한중콘크리트의 현장 표면단열 양생공법 시공사례 연구)

  • Kim Jong-Back;Lim Choon-Goun;Han Min-Cheol;Kim Seoung-Soo;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.25-28
    • /
    • 2005
  • This study investigates the field application of surface insulation curing method, which combined double layer bubble sheet(DBS) and thick-curing-material(TCM) for cold weather concreting. According to the test, deck slab, curing only upper section with DBS and TCM, does not make big different temperature history with that, curing both upper and bottom section during daily average temperature 6.5t. It is concluded that combination of DBS and TCM in only upper section can be safely cured in early period of time during cold water concreting. The field test was carried out with this favourable data. The upper deck slab was insulated by combination of DBS and TCM, and the construction was surrounded by tent. in order to protect from outside wind. The test result shows that the lowest temperature of deck slab indicated 6$ ^{circ}C $. It demonstrated that this curing method can resist early frost and save construction cost in the side of management and saving labor cost, compared with previous method. In addition, the column specimen, combined both form and bubble board, exhibited favorable temperature history, due to internal hydration heat insulation effect.

  • PDF

A Review on the Reconstruction of Jeonju Eupsung during the early years of King Young-Joe (영조초년(英祖初年)의 전주읍성(全州邑城) 개축공사(改築工事)에 관한 재고찰(再考察))

  • Seo, Chi-Sang;Cho, Hyung-Rai
    • Journal of architectural history
    • /
    • v.16 no.6
    • /
    • pp.27-46
    • /
    • 2007
  • Through reinvestigations of early years of King Young-Joe provincial castles, Jeonju Eupsung, this study seeks to broaden the understanding of castle construction of the later period of Chosun Dynasty. Jeonju Eupsung was established by reform-minded king and his loyalist Cho, Hyun Myung. Their new conceptual framework for reconstruction of Jeonju Eupsung was affected by Yoo, Hyung Won, a realist scholar of 17th century. It is obvious that adopted new administrative systems of financing, building and maintaining of Jeonju Eupsung were based on the his theories of castle. This study demonstrates that Jeonju Eupsung built by Cho, Hyun Myung, during the early years of King Young-Joe were based on those new concepts and systems of the new age. The study shows that the designer of this castle had in mind efficient construction design and execution and effective defense of provincial towns located on flat ground. And, the study explains how those original designer sought higher productivity through greater localization of securing resources and more detailed and improved organization of construction responsibilities. In short, this study seeks to prove that the provincial castles of the early 18th century reflected the new thinking on practicality that was spreading throughout the society of Chosun Dynasty at the time.

  • PDF

An Experimental Study for Basic Properties of Mortar Applied PC Panels by PVA and Nylon Fiber Ratio (PVA 및 나일론 섬유 혼입률에 따른 PC 패널용 모르타르의 기초 물성에 관한 실험적 연구)

  • Lee, Jae-Hyun;Song, Young-Chan;Kim, Yong-Ro;Kim, Ook-Jong;Lee, Do-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.137-140
    • /
    • 2009
  • Nowadays, the high performance composite materials are famous for the new construction materials as the construction buildings are bigger and higher. Out of them of all, the fiber reinforced concrete and mortar have been studied to develop and strengthen the performances of concrete, such as tensile strength, durability and the resistibility of crack. Also, it is considered that precast concrete is important alternatives of dry process for saving time, upgrading the material's quality and the productivity. Thus, PC panel is being produced for the use of dry wall as well as exterior finishing materials and it requires lots of tests and studies to be conducted to meet the various functional conditions. According to this study, it is considered that PVA fiber might be more effective than nylon fiber for developing the exterior PC panels.

  • PDF

The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project (항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안)

  • Yoon, Moo-Hee;Ahn, Kyung-Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.6
    • /
    • pp.533-546
    • /
    • 2007
  • This paper studied the design VE (Value Engineering) process among the various methods to satisfy the requirement of user and cost saving in the overall redesign process for the Turn-key base construction project. This study has been estabilished the rational and practical analysis process with the stepwise by using the design VE process. The efficiency and safety were verified with the adoptian of computer simulation to cope with the problem of initial analysis and verification for design VE process in the large construction project. In the previous design VE process, there is a limitation for the analysis of design VE in the planing stage and the execution time period of the large construction project. The previous application of VE technique was only for the construction of harbor facilities, so there was no contribution of cost saving in the function and construction. However, this paper proposed the selection methodology of VE items and hence the redesign VE process can be efficiently improved. It can be also improved the process of functional analysis rationally and practically. About 4.6 billion won has been saved with applying to the harbor construction project with using the VE method proposed in this paper. The study gives the direction of VE to be accomplished efficiently in the similar project.

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

Development of Construction Information Management Module through the Use of Vector-Photo (벡터사진 활용을 통한 시공정보 관리모듈 개발)

  • Kim, Kyoon-Tai;Lim, Myung-Gu;Kim, Gu-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.619-626
    • /
    • 2013
  • Many pictures are taken at a construction site, but the information of the pictures is not managed in an efficient and systematic manner. For this reason, when a construction worker has scant field experience or knowledge, it is hard to communicate with others efficiently. Therefore, the information of the pictures taken is not fully utilized in any deliberation or conflict among interested parties, facilities maintenance, and construction of another structure, although they were taken for those purposes. This study discusses the need for combining vector-photos with image and 5W and 1H information, and develops a prototype module for creating vector-photos and saving them in a server. The vector-photos taken can be saved to a server in real time, and efficiently managed by a DB system. If a system to link the vector-photos with a BIM model is developed in the future, it is expected that the vector information in the picture can be connected with the property information of an object. As a result, the vector-photos can be utilized in more diverse ways.

Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5 (대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언)

  • Seol, Un-Ho;Bae, Byung-Hoon;Park, Jong-Seo;Shin, Jae-Choul;Lee, Geun-Il
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

An Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling (사무소 리모델링의 실내환경요소에 대한 선호도 분석 -수요자와 공급자 측면 비교를 중심으로-)

  • Choi, Jin-Hyuk;Park, Tae-Eun;Lee, Jeong-Bok;Kim, So-Yeon;Lee, Kyung-Hoi
    • KIEAE Journal
    • /
    • v.2 no.4
    • /
    • pp.57-64
    • /
    • 2002
  • Nowadays the importance of Building Remodeling as a means to create an architectural environment capable of responding to the social, economic changes has increased more than before. After long time pass, the aged building have faced the need for the overall repair of the structure and function. Remodeling is much more saving the time and cost than new construction in the office building. This study was focused in functional and efficient evaluation. Based on these points, we developed the evaluation factors, and verified a validity of evaluation factors through a survey. The purpose of this study was focused on the Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling. This study provides us the competitive guidance of remodeling. The owners and tenants take the maximum efficiency with the minimum cost.

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.