• Title/Summary/Keyword: Sand Dam

Search Result 122, Processing Time 0.033 seconds

Study on Seepage Behavior of Concrete Faced Gravel-Fill Dam with Cracked Face Slab (차수벽에 균열이 발생한 표면차수벽형사력댐의 침투거동 연구)

  • Cho, Sung-Eun;Park, Han-Gyu;Im, Eun-Sang;Kim, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.866-873
    • /
    • 2009
  • CFRD (Concrete Faced Rockfill Dam) has been world-widely constructed due to a lot of advantages compared with rockfill dam and recently, sand/gravel materials, instead of crushed rock materials, are also utilized as a main rockfill material to overcome geological and environmental problems. In this paper, the process of water infiltration into the originally unsaturated sand/gravel-fill dam is studied using two-dimensional saturated-unsaturated seepage theory. According to the results of seepage analysis, if the effective drainage zone is installed in the dam, the reservoir water infiltrate into the dam along a downward flow path towards the lower drainage area. The main body constructed with sand/gravel materials, therefore, remains unsaturated.

  • PDF

Characteristics of Fish Community Structure before the Dam Operation in the Naeseong Stream, Korea (내성천에서 영주댐 운영전 어류 군집구조의 특성)

  • Won, Jong-Seo;Kim, Seog Hyun;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.1
    • /
    • pp.34-43
    • /
    • 2017
  • The Naeseong Stream as a tributary of Nakdong River has conserved the unique structure and function of a typical sand-bed stream ecosystem. However, it is expected to change the stream bed environments and then the fish fauna in the downstream of the dam after the operation of the Yeongju Dam from 2016. We collected fishes and investigated their habitat environments from 2014 to 2016 in the downstream of the Yeongju Dam under construction in order to monitor changes in habitat environment, fauna and community structure of fishes in the Naeseong Stream. The size of the bed materials increased immediately downstream of the Yeongju Dam under construction. Before the operation of the Yeongju Dam, Zacco platypus was dominated and Opsarichthys uncirostris amurensis, Coreoleuciscus splendidus, Hemibarbus longirostris and Pseudogobio esocinus were sub-dominated according to the different sampling sites. Hemibarbus labeo, H. longirostris, Pseudogobio esocinus, Gobiobotia nakdongensis, Cobitis hankugensis and Leiocassis ussuriensis were found as a psammophilous fish specific to sand stream in the Naeseong Stream. At the downstream of the dam, the fish community was classified into a group of gravel-bed fishes such as Microphysogobio yaluensis, Coreoleuciscus splendidus and Coreoperca herzi and a group of sand-bed fishes such as Hemibarbus labeo, Cobitis hankugensis and Gobiobotia nakdongensis. These fish communities gradually tended to change from sand-bed fish community to gravel-bed fish community during the construction of the Yeongju Dam. Therefore, it is necessary to collect the baseline data for the stream ecosystem conservation in the sandy stream by continuously monitoring changes in the environment and fish in the downstream of the Youngju Dam.

Measures to improve the legal system for commercialization of sand dams (샌드댐 상용화를 위한 법제도 개선 방안)

  • Shim, Young-Gyoo;Chung, Il-Moon;Kim, Min-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.8
    • /
    • pp.635-643
    • /
    • 2022
  • Attempts are being made to use the sand dam as an alternative water resource securement facility by installing and operating sand dams in valleys, where water intake capacity is extremely limited, in areas with limited water supply in the upstream watershed of Korea. In the case of some countries in Africa, where sand dams are known to be most actively installed and used, it is difficult to find examples of establishing and applying a separate legal system for sand dams. A sand dam is a kind of groundwater dam, and in view of its concept, structural and technical form and characteristics, purpose, use, and function, it will be said that it has the legal character and status as a facility for securing groundwater resources specified in the current 「Ground Water Act」. Interpretation and application of regulations on facilities for securing groundwater resources also supports this. Therefore, it is legal and realistic to promote and implement the sand dam project as one of the installation and management projects for securing underground water resources based on the 「Ground Water Act」.

Preliminary Analysis on Improvement of Water Supply Capacity of Sand Dam (샌드댐 설치에 따른 물공급 개선 효과 예비 분석)

  • Chung, Il-Moon;Lee, Jeongwoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • It is important to introduce a local adaptive water supply system for upper mountainous regions, which provide a margin of water supply. This can be done through the process of securing a water source, planning for optimal use, and combining it with a water source that can be linked. In particular, in a mountainous region located at the uppermost part of the watershed, an approach should be found to utilize the groundwater discharge supplied through valley water and lateral discharge. This study sought to improve the water supply system using sand dams in drought-prone areas in Chuncheon, in Gangwon Province. Our approach involved virtually installing a sand storage tank under the existing water source to perform modeling in consideration of the current water intake and calculating the amount of water that can be taken from the sand dam. When the sand dam was applied at a size four times larger than the existing water source, it was found that the groundwater drainage increased significantly with changes in water surface slope and hydraulic conductivity.

Depositional Environment and Distribution of Heavy Metal off the Shihwa Dam

  • Oh, Jae-Kyung
    • Journal of the korean society of oceanography
    • /
    • v.32 no.3
    • /
    • pp.120-127
    • /
    • 1997
  • Depositional environment off the Shihwa Dam has been studied to investigate the change of sedimentation process and the pollution. In order to understand how the sediments are distributed, polluted and modified, depositional factors have been analyzed and compared with the previous data. Study area, located off the Shihwa Dam, was surveyed to collect 25 bottom samples and 2 cores in 1996 and echo-sounding in 1997. These sediments were analyzed for the study of the global characteristics of sediment such as grain size and organic matter. Among these samples, the selected twenty surface sediments were analyzed for the comparison with their contents of metallic elements (Al, Mn, Fe, V, Cr, Co, Ni, Cu, Zn, Cd, Pb, As). According to field and lab analysis of sediments, three sedimentological zones have been generally identified around study area; near the dam (sandy Silt), near the dike (Sand) and offshore (silty Sand) zones. Textural parameters show that the content of silt and clay is dominant near the dam excepting the dike zone of LNG Storage Base and offshore (Palmido). The total concentration of Mn, Ni, Fe, Zn and Cd in bulk sediments was increased after the construction of the dam, while the content of Mn and Cr were higher near tidal channel than in the offshore area. Meanwhile, the annual increasing pattern of some heavy metal has appeared in this area. Based on this primary study, modification of the depositional environment may be caused by the construction of the dam and LNG Storage Base. Additionally, environmental evaluation on organic/inorganic factors has been suggested for interpreting environmental changes caused by coastal development in the nearshore such as the Shihwa coastal area.

  • PDF

Effect of Characteristics of Sand/Gravel and Rock Materials on Behavior of Dam during Construction and Impounding (사력재와 석산재의 특성이 축조와 담수시 댐체 거동에 미치는 영향)

  • Seo, Min-Woo;Cho, Sung-Eun;Shin, Dong-Hoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.6
    • /
    • pp.45-55
    • /
    • 2008
  • CFRD (Concrete Faced Rockfill Dam) has been world-widely constructed due to a lot of advantages which it has compared with rockfill dam and recently, sand/gravel materials, Instead of crushed rock materials, are also utilized as a main rockfill material to overcome geological and environmental problems. In Korea, two dams using sand/gravel materials as a main fill material were designed and are being constructed. In this research, the strength and deformation characteristics of the rockfill and sand/gravel materials taken from 2 dam sites were tested by using a laboratory large triaxial testing equipment for a total of 7 cases. From the results of large triaxial and compaction tests, it was observed that two kinds of materials show a little different compaction, shear strenght and deformation characteristics. It could be expected that the shear strength of sand/gravel material was not disadvantageous compared with that of rockfill materials, however, there was some difference between two materials with respect to behavior characteristics. On the other hand, smaller displacements were observed from numerical analysis based on the data from a large triaxial test when the sand/gravel is used as a main fill material compared with the case when the crushed rock material is used as a main fill material. Finally, in spite of a little different shear strength and behavior characteristic between two materials, it was concluded that it will not lead to a significant problem when the sand/gravel material is used as a main rockfill material.

A study on Location Condition for Erosion Control Dam - Focus on Chungcheong region and Kyeongsangbuk-do - (사방댐 입지조건에 관한 연구 - 충청지역과 경북지역을 중심으로 -)

  • Park, Sae-Jun;Lee, Joon-Woo;Choi, Yeon-Ho;Kim, Myeong-Jun;Kweon, Hyeong-Keun;Jeon, Yong-Jun
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.2
    • /
    • pp.223-229
    • /
    • 2010
  • This study is to analyze location conditions for erosion control dams to be constructed in Chungcheongnam-do, Daejeon Metropolitan City, Chungcheongbuk-do and Gyeongsangbuk-do in order to establish proper conditions for erosion control dams in the future. 199 sites where erosion control dams are expected to be built in 2010 were chosen and investigated in terms of 12 factors including basin area, basin slope, and landslide risk. The results showed that erosion control dams for Chungcheongnam-do and Daejeon Metropolitan City are mostly impermeable gravity dams mainly composed of concrete. In contrast, Chungcheongbuk-do and Gyeongsangbuk-do are increasing the number of permeable or compound erosion control dams. Basin analysis at planned erosion control dam sites showed that at least 44.5% of the total area has high landslide risk. Gyeongsangbuk-do had the largest basin area for erosion control dam sites at 157.3ha, followed by Chungcheongbuk-do at 64.4ha and Chungcheongnam-do at 54.8ha. Analysis of sand deposits in the Chungcheongnam-do erosion control dam built in 2010 confirmed an average deposit of 971.8m3. The sand deposit capacity and amount of sediment control for erosion control dams have a very low correlation with basin area or flow path slope, and this needs to be addressed in future sand deposit capacity designs.

Mix design of CSG method (CSG 공법적용을 위한 배합설계기법)

  • Kim, Ki-Young;Jeon, Je-Sung;Cho, Sung-Eun;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.293-301
    • /
    • 2005
  • The CSG(Cemented Sand and Gravel) method is construction technique using as raw materials earth and gravel generated from a local construction site, mixing them with cement and rolling with vibration rollers. Recently, The use of this method for cofferdam and large dam is gradually increasing in Japan. The purpose of an CSG mix design is to develop project specific properties to meet the structure design requirements. But uniform mix design of CSG method has not yet been established. The experience of practitioners from the geotechnical and concrete disciplines has given rise to two genernal approaches to mix design for CSG. This paper reports the concept of how to set the mix design according to modified Proctor compaction test process and the test results on properties such as compaction, compressive strength and modulus of elasticity that obtained by unconfined compression test.

  • PDF

Application study of C.S.G method by the test construction and field test (시험시공 및 현장시험을 통한 C.S.G 공법의 적용성 검토)

  • Kim, Ki-Young;Park, Han-Gyu;Cho, Sung-Eun;Jeon, Je-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.61-68
    • /
    • 2006
  • Cemented Sand and Gravel(CSG) is a material made by simple mixing of rock-based raw materials such as excavated soil and riverbed gravel together with cement and water. The use of CSG methodl for cofferdam and large dam is gradually increasing in Japan because a quarry and aggregate plants can be diminished. Also, the CSG method can reduce dam construction cost, construction duration and destruction of environment. In this paper, field test and test construction of CSG method was conducted on Hwabuk Dam. The mechanical properties of CSG, such as compressive strength, extention strength and field permeability test were investigated. From the results of the experimental study, application study of CSG method was discussed.

  • PDF

Sand Levee의 사면안정 해석

  • 최기봉;안병철
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.10a
    • /
    • pp.207-213
    • /
    • 2003
  • 본 연구는 양수발전 등을 목적으로 축조한 소형 Dam 및 Sand Levee의 수위가 급상승할 경우 제체의 내측면에 미치는 영향을 Bishop's simplified method를 사용하여 Seepage Force(침투력)의 항을 중심으로 분석한 것이다. 특히 침투력의 항은 제체의 사면경사가 급할 경우 및 수위의 상승속도에 따라 제체의 안전성에 많은 영향을 미친다.(중략)

  • PDF