• Title/Summary/Keyword: Sale Facility

Search Result 32, Processing Time 0.022 seconds

A Field Study attention: The Population Density in Resident Area and Evacuation Regulation on Sale Facility(II) (대형 판매시설물의 피난안전규정을 위한 재실자 밀도에 관한 현장조사 연구(II))

  • Lee, Sang-Hee;Seo, Dong-Goo;Hwang, Eun-Kyung;Hwang, Keum-Sook;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.273-276
    • /
    • 2008
  • As the rapid and various changing of social aspects, the structures are getting bigger, higher and more complex. The importance of evacuation is on the rise as increased using frequency of multiplex sale facility and it's high population density. According to the result of a survey with 4 domestic wholesales mart's population density, the average and maximum was 0.41(人/$m^2$) and 0.46(人/$m^2$). considering evacuation dangerousness, the maximum value will be suitable for computation of evacuation capacity and this will be submitted as a basic data for computation of evacuation capacity.

  • PDF

A Case Study on the Remodeling Plan of Closed School as Elderly Facility And Developing Composition Type -Implication of Chung ok Elementary School- (폐교를 활용한 노인복지시설 리모델링 사례와 평면유형 개발 -경남 의령군 대의면 천곡초교를 대상으로-)

  • Lee, Woong-Gu;Nam, Yun-Cheol
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.39-46
    • /
    • 2010
  • Recently, in rural areas have been occurred closed school due to reduce children of people who consider educational environment. In July 2009 statistic, Closed school are ut to 3,348; sale process(61%), lease(25%), neglect(14%). Closed school are not only local community education, but also to act as cultural and historical role. First of all, it will be utilized public facilities as well as welfare facilities for local residents. In this study suggests the welfare facility where is remodelled as good case so that it will use as a data when closed school need remodeling. The main contents is as follows; it is set the slope next to the school building, a classroom is remodelled 2 triple rooms which are installed Ondol and a toilet, teacher's room is converted into the canteen, corridors are converted into the kitchen. Having good condition in the area, close school is appropriate to use welfare facility and also effective to convert teacher's space into normal space, canteen, kitchen. Finally, developed 2~5 composition type of elderly facility.

(r, Q) Policy for Operation of a Multipurpose Facility (단일 범용설비 운영을 위한 (r, Q) 정책)

  • ;Oh, Geun-Tae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.3
    • /
    • pp.27-46
    • /
    • 1992
  • This paper considers an (r, Q) policy for operation of a multipurpose facility. It is assumed that whenever the inventory level falls below r, the model starts to produce the fixed amount of Q. The facility can be utilized for extra production during idle periods, that is, when the inventory level is still greater than r right after a main production operation is terminated or an extra production operation is finished. But, whenever the facility is in operation for an extra production, the operation can not be terminated for the main production even though the inventory level falls below r. In the model, the demand for the product is assumed to arrive according to a compound Poisson process and the processing time required to produce a product is assumed to follow an arbitary distribution. Similarly, the orders for the extra production is assumed to accur in a Poisson process are the extra production processing time is assumed to follow an arbitrary distribution. It is further assumed that unsatisfied demands are backordered and the expected comulative amount of demands is less than that of production during each production period. Under a cost structure which includes a setup/ production cost, a linear holding cost, a linear backorder cost, a linear extra production lost sale cost, and a linear extra production profit, an expression for the expected cost per unit time for a given (r, Q) policy is obtained, and using a convex property of the cost function, a procedure to find the optimal (r, Q) policy is presented.

  • PDF

The Optimal Design of a PC System in HIBRAND (PC공법을 이용한 최적의 구조설계)

  • Kim, Jong-Soo;Park, Hyung-Suk;Choi, Dong-Sub
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.298-301
    • /
    • 2006
  • The HIBRAND located in Yangjaedong, Seochogu, Seoul is a large complex shopping center of total space 48,000 p'yongs which consists of a nineteen-story business facility and a six-story sale facility. In the case of a big construction work in the downtown, they are suffered much difficulty by construction period and working space lack. They, however, can satisfy construction period, constructability and quality using a PC system in HIBRAND. Also, we maximized the advantage of each material being the abreast of a RC and steel structure method partially and devised a reasonable copula. A PC system with advantages of construction period, constructability and quality assurance should be actively practiced to big downtown construction work.

  • PDF

A Study of Light Train AFC System Planing (경전철에서 역무자동설비 설계 방안)

  • Lee, Jung-Ju;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1574-1585
    • /
    • 2007
  • In the more and more continues traffic difficulty which comes to be serious it is for solve, in order to like this used plan for new town light train automatic fare collection system, the city development which is balance and the passenger whom it uses, in consequence of the fact that recently believer instruction, the automatic fare collection system the reverse which is convenient is used in the scripture season which is embossed with means it introduces it operates and a manpower with the scientific service control which leads the electric computer anger of passenger service improvement and accounting and statistical business it reduces, the use is convenient and the possibility facility of operating efficiently in rational plan in order to be, description below for the service automation equipment where the efficiency improves it is. Service automation equipment uses a scripture season to be the first boundary gate of the passenger, there must be a place where it uses a service automation facility and in order to be convenient, it considers the moving area and a wait of the reverse station passenger moving area and the space where, must secure the automatic fare collection system which it follows in automation of facility and the service operation of the reverse station which is ticket sale, the collection of tickets back the passenger is convenient and in order it will be able to use, must do and must consider, must arrange the efficient characteristic of the maintenance civil official services.

  • PDF

Economic Feasibility of Using Forest Biomass as a Local Energy Source (산림바이오매스의 지역 에너지 이용의 경제성 분석)

  • Min, Kyungtaek;An, Hyunjin;Byun, Seungyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.111 no.1
    • /
    • pp.177-185
    • /
    • 2022
  • In this study, the economic feasibility of a local energy facility that uses forest biomass as an energy source was assessed. We analyzed profitability using data from the Forest Energy Self-sufficient Village Project financed by the Korea Forest Service. The energy facility has a cogeneration generator and wood chip boiler. Wood chip, which has lower heat value and is cheaper than wood pellets, is used as fuel. Revenue comes from the sale of electricity, heat, and renewable energy certificates. Additionally, we considered the sale of carbon credits as substitutes for fossil fuels. The expenditure consists of fuel costs and fixed costs, and the initial investment is treated as a sunk cost. Under the condition of a 55% operation rate and wood chip price of 95,000 KRW per ton, the annual net revenue is positive. Crucial factors for managing the facility sustainably are operation rate and fuel cost. A simulation in which two factors were changed showed that the annual net revenue is negative with a 50% operation rate and 100,000 KRW per ton of wood chip price. To improve net revenue, an increase in the operation rate or a decrease in the wood chip price is required. Additionally, selling carbon credits will make the operation of the facility more profitable. Furthermore, the payment required to procure wood chips could contribute to the rural economy. To foster the use of forest biomass for energy, the price for heat supplied from renewable energy sources should be subsidized.

Economic Evaluations of Direct/indirect Coal Liquefaction Processes (직.간접석탄액화공정의 경제성 평가)

  • Park, Joo-Won;Bae, Jong-Soo;Kweon, Yeong-Jin;Kim, Hak-Joo;Jung, Heon;Han, Choon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.857-860
    • /
    • 2009
  • This report examines the economic feasibility of a commercial 50,000 barrel per day direct/indirect coal liquefaction (DCL/ICL) facility to produce commercial-grade diesel and naphtha liquids from medium-sulfur bituminous coal. The scope of the study includes capital and operating cost estimates, sensitivity analysis and a comparative financial analysis. Based on plant capacity of 50,000BPD, employing Illinois #6 bituminous coal as feed coal the total capital cost appeared $3,994,858,000(DCL) and $4,942,976,000(ICL). Also, the internal rate of return of DCL/ICL appeared 13.27% and 12.68% on the base condition. In this case, coal price and sale price of products were the most influence factors. And ICL's payback period(6.8 years) was longer than DCL's (6.6 years). According to sensitivity analyses, the important factors on DCL/ICL processes were product sale price, feed coal price and the capital cost in order.

  • PDF

Improvement Plans for Problem Cases in the Foundation and Management of Elderly Housing Facility (노인복지주택의 설치 및 운영의 문제 사례와 개선방안)

  • June, Kyung-Sook
    • Korean Journal of Human Ecology
    • /
    • v.18 no.5
    • /
    • pp.1155-1168
    • /
    • 2009
  • The purpose of this research is to investigate the realities and problem cases that occurred in the establishment and management of elderly housing facility in order to suggest the recommendations that help to improve the problem cases. For this purpose, 21 elderly housing facilities, which were established between 1996 and 2008 in Korea, were investigated with a documentary research method in terms of founders, managers, locations, the number of housing units, how to move-in. Also the problem cases that occurred in the establishment and management of 21 elderly housing facilities were investigated. The results were as followings. 1. Main founders and managers of 21 elderly housing facilities were the special companies for elderly housing, building companies, and social welfare corporation. Changes in the founders and managers were caused by financial problems; More than half of 21 elderly housing facilities were located in Seoul and near area; About a half of 21 elderly housing facilities had 100~200 housing units; An individual unit of elderly housing facilities can be rented or purchased, rented only, and purchased only. 2. The problems in the establishment and management of elderly housing facilities were non-return of deposit money, illegal sale of housing units, non-public registration of elderly housing facility, false advertisement, and unfair contract. 3. The problems in the establishment and management were mainly caused by the weakness in the regal and administration system for elderly housing and the illegal acts of founders and managers.

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

A Study on the Architectural Planning of traditional herbal medicine distribution supporting facilities (한약재유통지원시설의 건축계획에 관한 연구)

  • Bae, Joa-Sup;Oh, Jong-Hee;Kang, Won-Pil
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.2
    • /
    • pp.53-64
    • /
    • 2008
  • This study is the architectural planning of 5 distribution supporting facilities for traditional herbal medicine cultivated in the rural areas. The main function of the facility consists of storage, pre-treatment/processing, loading/unloading and the assistant function consists of inspection, office, exhibition/sale, technical equipment etc. The planning shows the modular plan and the section plan of the storage space reflecting the shape and size of storage container, the action radius of carrier and the possibilities of space lease. The total floor area of the storage is 3,192$m^2$ consisting of 27 space. The total floor area of the pre-treatment/processing is 1,488$m^2$ consisting of 7 space. The total floor area of the loading/unloading is 329$m^2$ consisting of 4 space. The total floor area of each facility storage is 8,284$m^2$ including of public space 2,170$m^2$. Also this planning shows the preliminary design, "fundamental model design" for 5 rural government BTL project. Therefore, this result of planning will be the guidelines of the RFP(Request For Proposal) for the private sector company interested in this BTL project.

  • PDF