Domestic city gas is supplying in an about 10 million household on present 34 city gas companies because is begun to supply regularly after two 1980 years middle. But, result that focus on city gas supply spread and stable supply for supply area and neglects about safety problem, hundreds casualties such as Ahyun explosion accident and Deagu city gas explosion accident were reached in situation that occurred large size calamity occurs it is dizzliness. In the case of advanced nation, can see that accomplish system and progress that in technology after experience major accident. Therefore, grasp problem investigating safety actual conditions for city gas institution and study about solvable plan is required this. Also, must guide reform and level elevation of a domestic company safety technology through induction and development of safety technology that is suitable in supply, domestic real condition etc. Must help in power positivity that is full text executing high-quality safety education about step High firing mechanism safety technology than present safety education.
Railway safety case is an important measure for demonstrates operating company's capability, commitment and competence in accordance with Railway Regulation 2000 in UK. Safety case describes the scope of operation, definition and boundary of activity, risk analysis, system safety activity, annul safety plan. Relationships between' these components and company's policy, organization, human resource, control measure, investment plan are also included. A case study for Network Rail (infrastructure manager)'s safety case is described in this paper for the construction of safety rule and safety planning.
The death rate in the construction industry, which is more than twice that of other industries, increases the need to solve chronic safety problems. In a situation in which the safety management measures that have been maintained thus far are unable to reduce construction accidents, the introduction of smart construction safety technology (SCST) that reflects the 4th industrial technology is required for the safety management of workers. Large corporations or public institutions have introduced SCST and are operating pilot sites, but SCST is still in its infancy and there have yet to exist field data regarding necessity and effectiveness. In this study, the concept of SCST, which has still to be established, is defined, and the actual condition of SCST was analyzed through a survey. Through the analysis of the necessity of SCST introduction, convenience, and effectiveness before and after its application, problems such as problems from the field point of view as well as other factors hindering the introduction of such technology are derived in detail. In addition, an effective combination of technologies for safety management at the current level is determined and an activation plan is presented.
In order to improve the safety of nuclear power plant, we performed a human factors review for the CFMS(Critical Function Monitoring system) design of nuclear power plant. Three works were performed in this study. In first work, we developed human factors engineering program plan(HFEPP) and human factors engineering verification and validation plan (HFE-V & V plan) to effectively perform CFMS design and review. In second work, we identified human engineering discrepancies(HEDs) for CFMS design through human factors design review and proposed those resolutions. In the third work, we developed the evaluation and management methodology for identified KEDs. Methodology developed in this study can be used in other complex system as well as in CFMS design review.
The research which sees the disability firm led and public procurement market penetration the base will be able to grow prepared and with the petal of the disability firm for a support disability firm manufactured product public purchase activation plan of the government offices groped. disability firm manufactured products purchase promotion plan and policy of the government offices presents the fact that with the aim.
Korea Aerospace Research Institute has developed an earth observation satellite and it was launched into its orbit in 2012 by using a foreign commercial launch vehicle. The launch site authority has imposed safety requirements to the spacecraft developer to ensure the safety of the personnel and to protect launch vehicle, spacecraft and facilities from accidents associated with the satellite operation at the launch site. This paper describes the range safety activities implemented for the satellite and supporting equipments during the whole phase of their design, manufacturing/test and operation at the launch site. To ensure the integrated requirements for safety management and design, system safety program plan has been developed. And based upon the plan, spacecraft developer conducted hazard analysis to identify and establish safety requirements to reflect in designs, procedures, operations. The result of the hazard analysis has been complied into safety data packages and it was reviewed by launch site review board at the safety reviews and finally it was approved to launch.
Recently, a massive loss of life and property is occurring in Korea due to traffic accidents, with the rapid increase in cars. For improvement of traffic safety, the Korea Transportation Safety Authority intensively analyzes accident data in local governments with low traffic safety index, performs a field investigation to extract problems and offers local governments improvements for problems, by conducting the 'Special Survey of Actual Conditions of Traffic Safety' each year, starting 2008. But local governments cannot strongly push forward the improvement projects due to the limited budget and the uncertainty of the improvement plan effects. Therefore, this study suggested a model which applied the Utility concept to the AHP theory, in order to efficiently decide a priority of the improvement plans in accident black spots in consideration of the limited budget of local governments. The number of accidents in each spot for improvement and accident severity, traffic volume, pedestrian volume, the improvement project cost and the accident reduction effect were chosen as evaluation factors for deciding a priority, and data about the improvement plan costs and the accident reduction effects, traffic accidents and traffic volume in the spots to undergo the special research on the real condition of traffic accident in the past were collected from the existing studies. Then, regression analysis was carried out and the Utility Curve of each evaluation factor was computed. Based on the AHP analysis findings, this study devised a priority decision method which calculated the weight and the utility function of each evaluation factor and compared the total utility values. The AHP analysis findings showed that among the evaluation factors, accident severity had the biggest importance and it was followed by the improvement plan cost, the number of accidents, the improvement effect, traffic volume and pedestrian volume. The calculated utility function shows a rise in utility, as the variables of the 5 evaluation factors; the number of accidents, accident severity, the improvement plan effect, traffic volume and pedestrian volume increase and a fall in utility, as the variables of the improvement plan cost increase, since the improvement plan cost is included in the budget spent by a local government.
Middle domestic the occurrence size which stews recently from the Korean Peninsula circumference country is augmenting on a large scale about earthquake about safe countermeasure part from the existing Natural Countermeasure Law 2008. Refers with the Earthquake Disaster Countermeasure Law to be new standard contents establishment by law and strengthened in March. Consequently the research is propelled about electric equipment earthquake-proof plan and countermeasure. The present paper investigated an equipment by domestic facility present condition about the change disappointment electric equipment which can supply all the member in the building an investigation analysis about problem point and improvement fact. Also about overseas electric equipment investigated about earthquake-proof plan relation system and facility present condition. Investigated the electric equipment earthquake-proof plan pertinent data which is advanced from like this existing nation and the equipment and application direction must apply to domestic presented. With character presents following the guide about electric equipment earthquake-proof plan becomes feed with the fact that will be able to use.
The recent surge in the production and handling of hazardous materials in Korea necessitates developing and implementing robust emergency response plans. These plans are crucial in safeguarding the well-being of workers and residents in the event of an incident. The consequence analysis methodology outlined in the KOSHA guidelines provides a foundation for designing emergency response plans in the event of chemical accidents. However, the consequence analysis is evaluated based on assumed accident cases or worst-case scenarios. Consequently, the emergency response plan based on the consequence analysis may overestimate the damage area, complicating rescue efforts and unnecessarily increasing costs. More information and parameters become available after an accident, enabling more accurate consequence analysis. This implies that the results of consequence analysis based on this detailed information provide more realistic results than those based on assumed accidents. This study attempts to optimize the resource allocation and cost-effectiveness of emergency response plans for chemical accidents. Existing procedures and manuals are revised to elucidate the proposed model and conduct real-time consequence analysis. The existing emergency response plan is compared to verify the proposed model's efficacy. The obtained results indicate that the proposed model can exhibit better performance.
Many developed countries use risk based safety management system. Currently many research efforts are made for the application of risk concept in safety management within the boundary of the railway safety act 2005. But results of these efforts can be applied around 2008 due to many background data and analysis techniques. For the prompt and efficient construction of mid and long term safety plan$(2006\~2010)$ various reports on safety issues and expert opinions are analysed in this study without risk analysis. Identification of railway safety issues are summarized and effective measure are proposed in this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.