• Title/Summary/Keyword: Safety case

Search Result 5,971, Processing Time 0.032 seconds

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • v.20 no.3 s.57
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.

Personal, Occupational, and Public Health Perspectives on Dealing with the First Case of Influenza A (H1N1) in the United Arab Emirates

  • Shah, Syed M.;Aw, Tar-Ching;Blair, Iain;Hashmey, Rayhan;Sheek-Hussein, Mahmoud
    • Safety and Health at Work
    • /
    • v.2 no.1
    • /
    • pp.83-86
    • /
    • 2011
  • New epidemics of infectious diseases often involve health care workers. In this short communication we present a case report of a health care professional who became the first case of influenza H1N1 virus to be notified in the United Arab Emirates. There are several issues related to workplace considerations and general public health, including preventive measures, the need for isolation of the patient, dealing with contacts, return to work, and communication with the workforce.

A Case Study on System Assurance for Platform Screen Door in Urban Transit (도시철도 승강장 스크린도어의 시스템보증 사례 연구)

  • Lee, Hwan-Deok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.287-298
    • /
    • 2013
  • This paper presents a case study of PSD(Platform Screen Door) system assurance based on EN50126 life-cycle stage. By applying this system assurance, the accidents related to urban light transit railway especially that caused casualties could be reduced tremendously. This case study contributes significantly to the reliability, availability, maintainability and safety of the PSD system. Request For Proposal (RFP) of a rail road operator in which required by RAMS is prepared in which to ensure all system assurance activity and safety assessment are compulsory. The step-by-step activities and related deliverables are used which include functional analysis, FMECA, hazard identification analysis, system hazard analysis, maintainability analysis, FRACAS, and finally verification and validation of the system.

An Assessment of Safety Zone for Mountain Tunnel Portal Using Strength Reduction Technique (강도감소법을 이용한 산악터널 갱구부의 안전영역 평가)

  • Hong, Chang-Soo;Hwang, Dae-Jin;Lee, Kang-Ho;You, Kwang-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.925-930
    • /
    • 2006
  • During the excavation of a tunnel portal, failure zones around the tunnel heading occur and also the ground supports itself. In a portal, its location and the ground characteristic have a great influence on the stability of the tunnel. Therefore, the failure mechanism of a tunnel heading and how to assess the stability of the tunnel are very important. In this paper, the numerical analyses were executed to evaluate the safety factor using strength reduction technique. The influence area of an excavation was also predicted through a case study in which no-support case and support case with the Pattern P-6 were compared in terms of the ground class and the shear strain.

  • PDF

A Study on the Improvement of Evacuation Measures through the Analysis of Fire Incident in the Facility of People Vulnerable to Disaster (재난약자시설의 화재사례 분석을 통한 피난대책 개선에 관한 연구)

  • Jin, Seung-Hyeon;Kim, Hye-Won;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.78-79
    • /
    • 2018
  • The facilities of domestic elderly people are getting higher in the facility due to the rapid increase of the elderly population. Elderly people ability to evacuate the facility such as cognition and walking ability is very low. Therefore, it is necessary to secure the safety of evacuation in case of fire, but the evacuation safety measures in case of domestic fire accidents are insufficient. This study is to identify the problems of the safety of evacuation through the fire case analysis and to propose the measures against it.

  • PDF

Safety Management Improvement Plan in Construction Project (건설사업 관리의 안전관리 향상 방안에 대한 연구)

  • Kim, Min-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF

A Case Study for Safety Analysis (안전성 분석에 대한 사례 연구)

  • Chang, Kwang-Chi;Lee, Key-Seo
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.251-258
    • /
    • 2004
  • A systematic methodology to determine safety requirements for railway signalling system and safety requirement allocation into system are presented. THR concept is used for as an interface between Risk Analysis to be performed by railway operator and System Design Analysis by the supplier. This approach is based on Signalling Safety Standard EN50129 by CENELEC.

A Study on the Development of Installation and Management of Safety Shower (Safety shower 설치 및 관리기준 개선에 관한 연구)

  • Lee, Dong Hyeok;Yoo, Byung Tae
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.6
    • /
    • pp.1-7
    • /
    • 2018
  • Currently chemical plant risk have been issued by occurring frequent accidents. Accidents can be generally composed of fire, explosion, release in chemical plant. In case of fire and explosion, accident victims are occurred immediately after accident but release accident, late emergency response cause damage to worker. Especially, there are many victims by late emergency response against chemical exposure to skin. In case of chemical exposure to skin, irreversible damage like death, blindness, burn can be prevented by washing immediately. Safety shower can provide the cleaning for chemical exposure to eye, skin. Most of chemical plants are built in 1980s so equipment become superannuated. In this reason, safety shower also cannot operate normally in emergency situation. Therefor safety shower should be managed by installation and management guideline. This study perform the establishment guideline for safety shower installation and inspection to increase the reliability.

Development on the Safety Management System of Hazardous Chemicals under the Chemicals Control Act: Focusing on Safety Assessment System (화학물질관리법상의 유해화학물질 안전관리 개선방안 연구 : 안전성평가 사례 중심)

  • Yoo, Byungtae;Lee, Eun Byul;Kim, Jong Gu
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.96-101
    • /
    • 2019
  • Chemicals Control Act have been strengthened to control more safely hazardous chemicals from 2015. In particular, the standards for the installation and management of handling facilities was enhanced with specific regulations depending on type of the facilities and the hazardous chemicals. However, some standards for handling facilities caused difficulties in implementing the strengthened standards due to various field conditions, such as lack of physical space. The Ministry of Environment is implementing Safety Assessment System (SAS) to solve these problems since 2018. However, many plants have difficulties in preparing alternative methods to pass the safety evaluation. The purpose of this study was to review and analyze the SAS and to suggest alternative measures in terms of management and technical aspects through the case study of hydrochloric acid storage tanks. The following safety solutions were suggested for handling facilities that had insufficient the space and capacity for the retaining wall due to physical space. Firstly, insufficient space was resolved by introducing equipment relocation or demolition, and retaining wall expansion. Secondly, the wall of the surrounding buildings was used as an alternative to the retaining wall with additional chemical resistant treatment. Finally, sensor installation and facility inspection were suggested as ways to improve chemical safety. Therefore, improvement of chemical accident prevention system is required not only in terms of facilities supplementation but also management aspect. The results of this study are expected to be available for similar facilities and will be based on the preparation of additional safety assessment as alternatives measures in the future.

A Study on Productivity Improvement through Safety Management and Manufacturing Process Reengineering : Case Study in Polyurethane Manufacturer (안전관리 및 생산 공정 개선을 통한 생산성 향상에 관한 연구 : 폴리우레탄 제조업체 사례)

  • Kim, Hyun Soo;Lee, Hyeong-Ryong;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.185-196
    • /
    • 2013
  • Polyurethane is an elastomer polymer, which is flexible, tough and resistant. This material is widely used various fields such as automobile, aeroplane, textiles, construction industries. Currently there exists more than 1,000 manufacturing companies in Korea that are closely related to Polyurethane. In spite of a number of Polyurethane manufacturing companies, there are little attention in academia as well as industries to study the safety and manufacturing process improvement on Polyurethane. In this paper, we consider a case study for the Polyurethane manufacturer to improve productivity by using safety management and manufacturing process reengineering. After careful analysis, we derive three enhancements to increasing the safety and productivity for the target company. Especially, we achieve about 16% productivity improvement in roller manufacturing process by replacing manual stirring job with automated mixing machine.