• Title/Summary/Keyword: Safety Risk Management

Search Result 2,153, Processing Time 0.024 seconds

A study on the City-gas Pipeline Management System by Reliability Based Design and Assessment (신뢰도평가 기반 도시가스배관 종합관리시스템 구축 연구)

  • Oh, Dong-Seok;Lee, Jin-Han
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.6
    • /
    • pp.129-135
    • /
    • 2018
  • For efficiently safety management of city gas pipelines, the City-gas Pipeline Management System(CPMS) has been developed to systematically manage and analyze the data collected from 33 city gas companies and to effectively perform internal and external affairs related to gas safety management. The piping information data uploaded to the CPMS is ranked the risk according to the criteria specified in the KGS Code, and the safety management of the piping has performed close inspection according to the risk ranking. However, the criteria for deriving the risk ranking is very simple and lacks relevant grounds, and the reliability for the determination of the close inspection pipeline is no high due to the redundant rank. Therefore, we developed a risk assessment program based on the Reliability Based Design Assessment(RBDA) methodology and tried to derive a reasonable risk ranking by linking it with the CPMS system.

Construction Risk Assessment Methodology Using Site Risk Influence Factors (건설현장 위험영향요소 기반의 위험도 산정 방법론)

  • Lee, Hyun-Soo;Kim, Hyun-Soo;Park, Moon-Seo;Lee, Kwang-Pyo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Considering variable and changeable characteristics of construction site, risk of same trade can be different by combination of inherent characteristics. But established safety management has performed like other industries not reflecting characteristics of construction. So, to suggest risk assessment methodology considering risk influence factors in construction site, this study extracts risk influence factors by literature reviews and surveys, builds the weighting system for classification of factors. And risk of trade is calculated based on frequency and severity of risk. Risk assessment methodology is suggested by integrating risk influence factors and risk of trade. From this, risk considering the conditions of construction sites can be derived and based on the derived risk, safety management can be performed more effectively. This study has meaning for assessing the risk which can reflect characteristics of construction site considering risk influence factors.

Development of a Real-Time Active Safety Management Platform and Data Collection Device for the Safety of Radiation Workers (방사선 작업종사자 안전을 위한 실시간 능동형 안전관리 플랫폼과 데이터 수집 디바이스 개발 연구)

  • Kilsoon Park;Kihun Bae;Yongkwon Kim;Won Ki Seo
    • Journal of Radiation Industry
    • /
    • v.18 no.3
    • /
    • pp.209-215
    • /
    • 2024
  • Radiation work always carries the risk of radiation exposure, so regulatory agencies manage it through licensing when high exposure is expected. However, due to passive management methods using TLD, etc., there are cases where risk management is done after an incident occurs or the incident is covered up. In this study, we developed a system to manage the location of radiation work and the risk of workers in real time through a safety management platform and a location-based personal dosimeter. The safety platform server receives data from the developed personal dosimeter in real time and manages risks in three steps for each worker using location and dose rate, and can predict risks and generate alarms in real time. The personal dosimeter transmits the location and dose rate of the worker in real time using GPS and LTE communication. The developed safety management platform and personal dosimeter were verified through a field test to receive real-time data of the location and dose rate data of the worker, and the risk management function according to the individual dose rate was verified.

Developing a Product Risk Assessment Model for Korea Using Injury Data (위해정보를 활용한 한국형 제품 위험성 평가 모델 개발에 관한 연구)

  • Bae, Jinhan;Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.4
    • /
    • pp.623-635
    • /
    • 2013
  • Purpose: The recent major recalls of hazardous products caused consumer product safety acts to be strengthen worldwide. Although the recall system of hazardous products in Korea has been operating based on Framework Act on Product Safety since 2011, the evaluation of product risk has been relied on not the results of objective incident data but the results of illegal product investigations. The purpose of this paper is to propose a product risk assessment model for Korea using injury data. Methods: The authors derived Korea's risk assessment method by analysing the advantages and disadvantages of the most widely used models in advanced countries such as EU's RAPEX RAG and Janpan's R-MAP. In this study, the level of relative frequency and severity of injury are determined based on the objective incident data and the length of hospitalization respectively. In addition, the injury data occurred during 2011 is applied to the proposed risk assessment model for case study. Results: The data analysed in this paper can be classified as high risk, medium risk, low risk, acceptable risk, and safe products through the matrix f rom the combination of the relative frequency and the severity derived. Conclusion: The proposed risk assessment model in this study has advantage obtaining reliable objective results because it uses actual injury data and redeems the drawbacks of the existing models used in advanced countries. Furthermore, because the proposed model shows the high risk products among many, it is expected to be useful especially for customs whose main job is inspecting the imported goods and the government when selecting the target product groups for safety investigation.

Study on the Necessity of Risk Assessment for The Live-Line working of Electrical Construction (전기공사업 활선작업의 위험성평가 필요성에 관한 고찰)

  • Choi, Seung-Dong;Hyun, So-Young;Han, Hyeong-Ju;Hong, Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.719-730
    • /
    • 2011
  • The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.

  • PDF

A study on improvement of the safety level in university laboratory using the safety management assessment (안전관리 평가를 통한 연구실 안전수준 개선방안에 관한 연구 -호남지역 대학 중심으로-)

  • Park, Hai-Chun;Cho, Sang-Hoon;Sim, Chul-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.11-19
    • /
    • 2012
  • Especially because of the distinctiveness that new experiments and research provoke coexistence of various risk factors, the researchers in university laboratory are being exposed to incidents that are difficult to predict. Due to the fact that the numbers of accidents that occur at the university laboratory are increasing, the necessity for laboratory safety management is on the rise. Most laboratory accidents are caused by the ability that can detect risk factors such as unsafe behavior or unsafe condition but is not working perfectly. In order to prevent researchers in advance from unsafe behavior or unsafe condition, effective safety education, systematic safety management, safe research environment, continuous safety check and proper measures after accident are the most important factors. In this study, survey was conducted in university laboratory to identify the factors that affect on safety management and to measure the safety management level. As a result, effective measures are proposed for the improvement of the safety management level.

AI-based basic research to predict safety accidents for foreign workers at construction sites (AI기반 건설현장의 외국인 근로자 안전사고 예측을 위한 기본 연구)

  • Kim, Ji-Myong;Lee, JunHyeok;Kim, GyeongBin;Oh, ChangHyeon;Oh, ChangYeon;Son, SeungHyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.251-252
    • /
    • 2023
  • Compared to other industries the construction industry experiences more casualties and property damage due to safety accidents. One of the reasons is the increasing number of foreign workers. For this reason, past studies have found that foreign workers at construction sites are more exposed to safety accidents than non-foreign workers. Nevertheless the proportion of foreign workers involved in safety accidents at construction sites is increasing, and there has been a lack of research to predict the risk of safety accidents at construction sites. Additionally, realistic safety management is lacking due to a lack of safety accident risk prediction research. Therefore, in this study, we would like to propose basic research that proposes an AI-based safety accident prediction model framework for predicting safety accidents of foreign workers at construction sites. The framework and results of this study will contribute to reducing and preventing the risk of safety accidents for foreign workers through risk prediction for safety management of foreign workers at construction sites.

  • PDF

Application of Risk Management for Dental Implants Based on ISO 14971 (치과용 임플란트에 대한 ISO 14971 기반의 리스크관리)

  • Yoon, Ji-Hoon;Kim, Young-Jin;Jeon, Gye-Rok;Jeong, Chang-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.92-97
    • /
    • 2012
  • Risk management is the process that helps to identify hazards, analyze them, and then to create an action plan to avoid and mitigate these hazards. The main objective of risk management in product development and manufacturing is to provide safe and efficient products without spending too many resources. Medical device manufacturers also face enormous risks - regulatory, legal, and financial - based on their products and processes, and the concepts of risk management are particularly important because any single failure may result in serious damages to body or loss of life. In this regard, a set of guidelines for the application of risk management to medical devices has been issued by ISO and specified in the document ISO 14971 Medical devices - Application of risk management to medical devices. The main objective of this study is to investigate the application of risk management to dental implant development and manufacturing processes based on ISO 14971. A general risk management process is first introduced, and the application of ISO 14971 to dental implants is further investigated.

Improving Qualification of Safety Manager at Construction Site (건설현장 안전관리자의 자격기준에 관한 연구)

  • Gal, Won-Mo;Son, Ki-Sang;Jeong, Se-Gyun;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

Occupational Health Policies on Risk Assessment in Japan

  • Horie, Seichi
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.19-28
    • /
    • 2010
  • Industrial Safety and Health Law (ISH Law) of Japan requires abnormalities identified in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording "employers shall endeavor." Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifies criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer significant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, financial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.