For efficiently safety management of city gas pipelines, the City-gas Pipeline Management System(CPMS) has been developed to systematically manage and analyze the data collected from 33 city gas companies and to effectively perform internal and external affairs related to gas safety management. The piping information data uploaded to the CPMS is ranked the risk according to the criteria specified in the KGS Code, and the safety management of the piping has performed close inspection according to the risk ranking. However, the criteria for deriving the risk ranking is very simple and lacks relevant grounds, and the reliability for the determination of the close inspection pipeline is no high due to the redundant rank. Therefore, we developed a risk assessment program based on the Reliability Based Design Assessment(RBDA) methodology and tried to derive a reasonable risk ranking by linking it with the CPMS system.
Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.117-126
/
2009
Many work-related risk factors can cause construction site hazards. Considering variable and changeable characteristics of construction site, risk of same trade can be different by combination of inherent characteristics. But established safety management has performed like other industries not reflecting characteristics of construction. So, to suggest risk assessment methodology considering risk influence factors in construction site, this study extracts risk influence factors by literature reviews and surveys, builds the weighting system for classification of factors. And risk of trade is calculated based on frequency and severity of risk. Risk assessment methodology is suggested by integrating risk influence factors and risk of trade. From this, risk considering the conditions of construction sites can be derived and based on the derived risk, safety management can be performed more effectively. This study has meaning for assessing the risk which can reflect characteristics of construction site considering risk influence factors.
Radiation work always carries the risk of radiation exposure, so regulatory agencies manage it through licensing when high exposure is expected. However, due to passive management methods using TLD, etc., there are cases where risk management is done after an incident occurs or the incident is covered up. In this study, we developed a system to manage the location of radiation work and the risk of workers in real time through a safety management platform and a location-based personal dosimeter. The safety platform server receives data from the developed personal dosimeter in real time and manages risks in three steps for each worker using location and dose rate, and can predict risks and generate alarms in real time. The personal dosimeter transmits the location and dose rate of the worker in real time using GPS and LTE communication. The developed safety management platform and personal dosimeter were verified through a field test to receive real-time data of the location and dose rate data of the worker, and the risk management function according to the individual dose rate was verified.
Purpose: The recent major recalls of hazardous products caused consumer product safety acts to be strengthen worldwide. Although the recall system of hazardous products in Korea has been operating based on Framework Act on Product Safety since 2011, the evaluation of product risk has been relied on not the results of objective incident data but the results of illegal product investigations. The purpose of this paper is to propose a product risk assessment model for Korea using injury data. Methods: The authors derived Korea's risk assessment method by analysing the advantages and disadvantages of the most widely used models in advanced countries such as EU's RAPEX RAG and Janpan's R-MAP. In this study, the level of relative frequency and severity of injury are determined based on the objective incident data and the length of hospitalization respectively. In addition, the injury data occurred during 2011 is applied to the proposed risk assessment model for case study. Results: The data analysed in this paper can be classified as high risk, medium risk, low risk, acceptable risk, and safe products through the matrix f rom the combination of the relative frequency and the severity derived. Conclusion: The proposed risk assessment model in this study has advantage obtaining reliable objective results because it uses actual injury data and redeems the drawbacks of the existing models used in advanced countries. Furthermore, because the proposed model shows the high risk products among many, it is expected to be useful especially for customs whose main job is inspecting the imported goods and the government when selecting the target product groups for safety investigation.
Proceedings of the Safety Management and Science Conference
/
2011.04a
/
pp.719-730
/
2011
The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.
Especially because of the distinctiveness that new experiments and research provoke coexistence of various risk factors, the researchers in university laboratory are being exposed to incidents that are difficult to predict. Due to the fact that the numbers of accidents that occur at the university laboratory are increasing, the necessity for laboratory safety management is on the rise. Most laboratory accidents are caused by the ability that can detect risk factors such as unsafe behavior or unsafe condition but is not working perfectly. In order to prevent researchers in advance from unsafe behavior or unsafe condition, effective safety education, systematic safety management, safe research environment, continuous safety check and proper measures after accident are the most important factors. In this study, survey was conducted in university laboratory to identify the factors that affect on safety management and to measure the safety management level. As a result, effective measures are proposed for the improvement of the safety management level.
Kim, Ji-Myong;Lee, JunHyeok;Kim, GyeongBin;Oh, ChangHyeon;Oh, ChangYeon;Son, SeungHyun
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.251-252
/
2023
Compared to other industries the construction industry experiences more casualties and property damage due to safety accidents. One of the reasons is the increasing number of foreign workers. For this reason, past studies have found that foreign workers at construction sites are more exposed to safety accidents than non-foreign workers. Nevertheless the proportion of foreign workers involved in safety accidents at construction sites is increasing, and there has been a lack of research to predict the risk of safety accidents at construction sites. Additionally, realistic safety management is lacking due to a lack of safety accident risk prediction research. Therefore, in this study, we would like to propose basic research that proposes an AI-based safety accident prediction model framework for predicting safety accidents of foreign workers at construction sites. The framework and results of this study will contribute to reducing and preventing the risk of safety accidents for foreign workers through risk prediction for safety management of foreign workers at construction sites.
Risk management is the process that helps to identify hazards, analyze them, and then to create an action plan to avoid and mitigate these hazards. The main objective of risk management in product development and manufacturing is to provide safe and efficient products without spending too many resources. Medical device manufacturers also face enormous risks - regulatory, legal, and financial - based on their products and processes, and the concepts of risk management are particularly important because any single failure may result in serious damages to body or loss of life. In this regard, a set of guidelines for the application of risk management to medical devices has been issued by ISO and specified in the document ISO 14971 Medical devices - Application of risk management to medical devices. The main objective of this study is to investigate the application of risk management to dental implant development and manufacturing processes based on ISO 14971. A general risk management process is first introduced, and the application of ISO 14971 to dental implants is further investigated.
As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
Industrial Safety and Health Law (ISH Law) of Japan requires abnormalities identified in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording "employers shall endeavor." Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifies criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer significant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, financial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.