• Title/Summary/Keyword: Safety Assessment Analysis

Search Result 2,301, Processing Time 0.029 seconds

석면 슬레이트 해체작업의 공정분석 및 위험성평가에 관한 연구 (A Study on the Process Analysis and the Risk Assessment for Removal Work of the Asbestos Cement Slate)

  • 오현수;김정민;장성록
    • 한국안전학회지
    • /
    • 제29권6호
    • /
    • pp.137-143
    • /
    • 2014
  • Asbestos is given to a variety of six naturally occurring silicate minerals. These minerals possess high tensile strength, flexibility, resistance to chemical and thermal degradation, and electrical resistance. These minerals have been used for decades in thousands of commercial products, such as insulation and fireproofing materials, automotive brakes, textile products, cement and wallboard materials. When handled, asbestos can separate into microscopic-size particles that remain in the air and are easily inhaled. It is now known that prolonged inhalation of asbestos fibers can cause serious and fatal illnesses including malignant lung cancer, mesothelioma, and asbestosis. Therefore the use of asbestos and asbestos products has dramatically decreased in recent years. Also all constructions including asbestos should be removed under strictly controlled conditions and very tightly implemented health & safety management systems. In this study, the process of the removal work of the asbestos cement slate was analyzed by IDEF-0 modeling and evaluated by 4M risk assessment method. The results show that removal work of the asbestos cement slate was classified five process and eighteen detail process. The risk of safety side the higher than the risk of health side in 4M risk assessment.

FCM에 의한 라멘식 세그멘탈 PSC박스거더 교량의 신뢰성에 기초한 시공간 구조안전도평가 (Reliability-Based Assessment of Structural Safety of Regid-Frame-Typed Segmental PSC Box Girder Bridges Erected by the FCM during Construction)

  • 조효남;주환중;박경훈;문경호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권1호
    • /
    • pp.131-140
    • /
    • 2002
  • In this paper, a limit state model based on the analysis of structural behavior of segmental prestressed concrete box girder bridges and reliability-based safety assessment method are proposed for the bridges erected by free cantilever method. Strength limit state models for prestressed concrete box girder and rigid-frame type columns are developed for a structural safety assessment during construction. Based on the proposed limit state models, the reliability of the bridge is evaluated by using the Advanced First Order Second Moment method. The proposed model and method are applied to the Seo-Hae Grand Bridge built by FCM in order to verify its effectiveness in the safety assessment during construction of the kind of bridges. The sensitivity analyses of the main parameters are also performed in order to identify the important factors that need to be controlled for the safety of the bridges during construction.

Assessment of Chemical Risks in Moroccan Medical Biology Laboratories in Accordance with the CLP Regulation

  • Mourry, Ghita E.;Alami, Rachid;Elyadini, Adil;Hajjaji, Souad El;kabba, Saad El;Zouhdi, Mimoun
    • Safety and Health at Work
    • /
    • 제11권2호
    • /
    • pp.193-198
    • /
    • 2020
  • Background: Medical laboratory workers are frequently exposed to a wide range of chemicals. This exposure can have adverse effects on their health. Furthermore, a knowledge lack of the chemical risk increases the likelihood of exposure. The chemical risk assessment reduces the risk of exposure to hazardous chemicals and therefore, guarantees health and safety of the workers. Method: The chemical risk assessment was conducted using a modified INRS method, according to the new CLP Regulation, of 11 unit laboratories in a Moroccan medical laboratory. Observation of each workstation and analysis of safety data sheets are key tools in this study. Results: A total of 144 substances and reagents that could affect the health of the analytical technicians were identified. Among these products, 17% are concerned by the low priority risk score, with 55% concerned by the average priority risk score and 28% concerned by the high priority risk score. This study also enabled to better identify the chemical agents that have restrictive occupational exposure limit value and controls were conducted to this effect. On the basis of the results obtained, several corrective and preventive measures have been proposed and implemented. Conclusion: Risk assessment is essential to ensure the health and safety of workers and to meet regulatory requirements. It enables to identify all the risky manipulations and to adopt appropriate preventive measures. However, it is not a one-time activity but it must be continuous in order to master the changes and thus ensure the best safety of all.

중앙선 전철/전력분야 위험도 평가 연구 (A study on Risk Assessment for Electric Railway on Choongang Line)

  • 이기원;김주락;장동욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1419-1424
    • /
    • 2004
  • Railway safety is based on a risk analysis and safety assessment for the whole railway system as human, train, electric, signaling, operation, maintenance and etc. Therefore in this study, after investigating the accidents happened in electric railway on Choongang line for 5 years, from '97 to '01, a Data-Base was made through a cause and result analysis. In consideration of economic loss and human resources damage, a risk assessment for electric railway was also performed.

  • PDF

Technical note: Estimation of Korean industry-average initiating event frequencies for use in probabilistic safety assessment

  • Kim, Dong-San;Park, Jin Hee;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • 제52권1호
    • /
    • pp.211-221
    • /
    • 2020
  • One fundamental element of probabilistic safety assessment (PSA) is the initiating event (IE) analysis. Since IE frequencies can change over time, time-trend analysis is required to obtain optimized IE frequencies. Accordingly, such time-trend analyses have been employed to estimate industry-average IE frequencies for use in the PSAs of U.S. nuclear power plants (NPPs); existing PSAs of Korean NPPs, however, neglect such analysis in the estimation of IE frequencies. This article therefore provides the method for and results of estimating Korean industry-average IE frequencies using time-trend analysis. It also examines the effects of the IE frequencies obtained from this study on risk insights by applying them to recently updated internal events Level 1 PSA models (at-power and shutdown) for an OPR-1000 plant. As a result, at-power core damage frequency decreased while shutdown core damage frequency increased, with the related contributions from each IE category changing accordingly. These results imply that the incorporation of time-trend analysis leads to different IE frequencies and resulting risk insights. The IE frequency distributions presented in this study can be used in future PSA updates for Korean NPPs, and should be further updated themselves by adding more recent data.

가압중수로 증기발생기의 경년열화 관리를 위한 안전성 평가 시스템 개발 (Development of a Safety Assessment System on Aging Management in Existing CANDU Steam Generators)

  • 신소은;이정훈;박동규;정종엽
    • 시스템엔지니어링학술지
    • /
    • 제10권1호
    • /
    • pp.49-56
    • /
    • 2014
  • Since steam generator (SG) tubes are located in the boundary between the primary and secondary systems of nuclear power plant (NPP), the SG is one of the most important components in the aspects of the safety of NPP. The magnetite ($Fe_30_4$) deposition, so-called fouling, is generally known as a major aging mechanism of CANDU SGs, and this aging mechanism makes the heat transfer efficiency between the primary and secondary systems of NPP reduced. Therefore, the development of SG safety assessment system which can evaluate the effect of the SG aging degradation mechanism should be needed for safety of NPP. In this study, through the suggestion of the guideline for SG safety assessment, it is possible to strengthen the basic of establishing the effective SG aging management technique. The SG safety assessment is carried out by CATHENA(Canadian Algorithm for THErmalhydraulic Network Analysis). It is possible to determine the integrity of SGs by identifying the main safety parameters which can be changed by the aging degradation of CANDU SGs.

원자력발전소의 안전성 및 신뢰도 평가 (Safety and Reliability Assessment for Nuclear Power Plants)

  • 정원대;황미정
    • 한국안전학회지
    • /
    • 제12권4호
    • /
    • pp.143-152
    • /
    • 1997
  • Probabilistic Safety Assessment(PSA) is an engineering analysis of the possible contributors to the risk from a nuclear power plant. It consist of three phases named as Level 1, 2 and 3. Level 1 PSA mainly focused in this paper is the phase of system analysis which includes the development of accident scenarios and the frequency estimation of each scenario. It covers also the system reliability analysis, component data analysis, and human reliability analysis. PSA have become a standard tool in safety evaluation of nuclear power plants. The main benefit of PSA is to provide insights into plant design, performance and environmental impacts, including the identification of dominant risk contributors and the comparison of options for reducing risk.

  • PDF

철도시스템 기본위험분석모델 개발 방안에 관한 연구 (A Study on the Development of Preliminary Hazard Analysis Model for Railway System)

  • 왕종배;박찬우;박주남
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1-6
    • /
    • 2005
  • To improve safety management of railway and cope with the factors to threat technical and social safety, we need to establish railway safety management system based on analysis of hazards and assessment of risk for railway system. So we have to conduct PHA(Preliminary Hazard Analysis) first to understand weak points and factors to possibly threat safety using analysis of related data such as past accident/incident data and safety regulation and classification standards of hazards/causes of railway accidents. Therefore in this research, we led types/dangerous events/causes of risks/factors of risks from hazard log developed based on railway accident classification and hazards of railway accident. PHA model for domestic railway system will be used in risk analysis and risk assessment of railway accident.

  • PDF

농업토목 수리구조물 안전도평가 시스템 개발에 관한 연구 (Development of Safety Assessment System for Agricultural Irrigation Structures)

  • 조효남;김성훈;최영민;이승재
    • 전산구조공학
    • /
    • 제6권1호
    • /
    • pp.107-115
    • /
    • 1993
  • 본 연구는 개인용 컴퓨터를 이용하여 농업토목 수리구조물의 안전도평가시스템을 개발하는데 목적이 있다. 본 시스템은 상호 유기적인 관계를 가지고 있는 데이타베이스, 구조해석, 안전도분석/평가, 입출력도식화의 4가지 서브시스템으로 구성되었으며, 사용자 위주의 풀다운식 메뉴드라이빙 형태로 개발되었다. 노후손상된 구조물의 안전도평가에 사용된 주요 알고리즘은 신뢰성이론에 의한 합리적 내하력 평가방법에 기초하였다. 본 연구에서 개발된 안전도평가 시스템은 노후손상된 농업토목 수리구조물의 안전도 및 내하력 평가를 위한 효율적인 수단으로서 실무에서 널리 사용될 수 있을 것이라고 사료된다.

  • PDF

전동차의 구조체 안전진단평가 연구 (On Study the Safety Diagnosis Assessment of EMU's Carbody)

  • 정종덕;편장식;김정국;김원경;홍용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.322-327
    • /
    • 2004
  • This paper describes the structural analysis result of accident EMU(Electric Multiple Units). Structural analysis of EMU was performed for the criteria of safety assessment. Structural analysis using commercial I-DEAS software provided important information on the stress distribution and load transfer mechanisms as well as the amount of damages during rolling stock crash. Tensile tests were performed on two different types of specimens in order to evaluate the strength changes before and after damages, obtained from plastic deformed area and nondeformed region of the accident EMU. The structural analysis and tensile test results have been used to provide the critical information for the criteria of safety assessment.

  • PDF