• Title/Summary/Keyword: SIL (Safety Integrity Level)

Search Result 51, Processing Time 0.028 seconds

Fire Safety Assessment Based on FSA and Risk Reduction of Machinery System Considering Functional Safety (기능적 안전을 고려한 FSA기반 기관 구역 화재 안전성 평가 및 개선)

  • Suh, Sung-Won;Yang, Young-Soon;Chung, So-Yeon;Ryu, Won-Sun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.49 no.3
    • /
    • pp.239-246
    • /
    • 2012
  • It is the well-known fact that most part of goods transported are moved on the unfavorable ocean and even a small amount of accident on sea is extremely dangerous for human lives, financial losses, and social responsibility. Among the several causes of accidents, those by fire have occurred frequently and their damage has been highly serious. The aim of this paper is to assess the risk of fires due to oil leakage in the machinery space. To define the possible fire scenario, our team has performed the search of casualty database and reviewed the previous and various studies in the field. As a result, it is noted that the quantitative risk of the fire scenario have been evaluated on the ground of the FSA risk model. The expected frequency of a fire amounts to incidents during the life of a ship, and the expected financial damage amounts to 5,654 USD per a ship. By adopting Safety Instrumented System (SIS) introduced in IEC 61508 and IEC 61511, SIS model is designed to prevent oil leakage fire as a risk reduction method. It is concluded that System Integrity Level (SIL) 1 seems to be appropriate level of SIS.

Safety Enhancement of LPG Terminal by LOPA & SIF Method (LOPA 및 SIF기법에 의한 LPG 인수기지의 안전성향상에 대한 연구)

  • Lee, Il Jae;Kim, Rae Hyun
    • Korean Chemical Engineering Research
    • /
    • v.53 no.4
    • /
    • pp.431-439
    • /
    • 2015
  • The methods which decrease the accident hazards of LPG(Liquefied Petroleum Gas) terminal on the basis of butane & propane storage tanks by applying HAZOP(Hazard and Operability), LOPA(Layer of Protection Analysis) and SIL(Safety Integrity Level) are suggested. The accident scenarios were derived by analyzing latent risks through the HAZOP. The scenarios which would have the big damage effect in accidents were selected and then LOPA was assessed by analyzing IPL(Independent Protection Layer) about the correspond accident scenarios. The improved methods were proposed on the basis of level of SIF(Safety Instrumented Functions) as a IPL considering satisfied condition of risk tolerance criteria($1.0{\times}10^{-05}/y$). In addition, The proposed IPLs were basis on the economic analysis. The effect of SIF as a IPL considering the changes of accident frequency was studied in case of the accident scenarios derived from the concerned process.

A Study on SIL Allocation for Signaling Function with Fuzzy Risk Graph (퍼지 리스크 그래프를 적용한 신호 기능 SIL 할당에 관한 연구)

  • Yang, Heekap;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.145-158
    • /
    • 2016
  • This paper introduces a risk graph which is one method for determining the SIL as a measure of the effectiveness of signaling system. The purpose of this research is to make up for the weakness of the qualitative determination, which has input value ambiguity and a boundary problem in the SIL range. The fuzzy input valuable consists of consequence, exposure, avoidance and demand rate. The fuzzy inference produces forty eight fuzzy rule by adapting the calibrated risk graph in the IEC 61511. The Max-min composition is utilized for the fuzzy inference. The result of the fuzzy inference is the fuzzy value. Therefore, using the de-fuzzification method, the result should be converted to a crisp value that can be utilized for real projects. Ultimately, the safety requirement for hazard is identified by proposing a SIL result with a tolerable hazard rate. For the validation the results of the proposed method, the fuzzy risk graph model is compared with the safety analysis of the signaling system in CENELEC SC 9XA WG A10 report.

Implementation of Improved safety and reliability Embedded system using Backup and Restore of TMR Architecture (TMR 구조에서의 백업과 복원을 활용한 안정성 및 신뢰성 향상 임베디드 시스템 구현)

  • Park, Joo-Yul;Lee, Jun-Hwan;Kim, Hyo-Sang;Kim, Bong-Taek;Chung, Ki-Seok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.188-194
    • /
    • 2011
  • The purpose of this paper is to explain the implementation method in order to enhance stability and reliability of embedded system. In this research, Texas Instrument (TI)'s TMS570 MCU(Micro Controller Unit) is used to satisfy the standard of stability that is IEC 61508. IEC 61508 suggest SIL(Safety Integrity Level) from 1 to 4 and TMS570 is satisfied SIL3. Also, TMS570 can provide several stability functions can be used in realtime system. To use such functions, this paper suggest the solution about the defect that can be used in realtime system. In basic way TMR(Triple Modular Redundancy) suggested in addition to explain about the way to improve safety and reliability. Also this paper will suggest the method that reinforce the stability of calculation by using multiplex voter and memory.

  • PDF

A Study on the Improvement of Preventive Measures for Improving the Safety of Chemical Reactor (화학반응기의 안전성 향상을 위한 예방조치 개선에 관한 연구)

  • Byun, Yoon Sup
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.4
    • /
    • pp.32-38
    • /
    • 2020
  • Based on the cases of fire and explosion accident in the chemical reactor, thr problems of preventive measures installed in the chemical reactor were analyzed. The chemical reactors produce a variety of chemicals and install rupture disk to relieve the pressure that rises sharply in the event of a runaway reaction. In order to maintain the function of the rupture disk, the emissions was allowed to be discharged into the atmosphere, resulting in fire and explosion accidents. As a way to improve this, safety instrumented system based on the safety integrity level(SIL3) was applied as a preventive measures for chemical reactor. Two emergency shur-off valves are installed in series on pipe dropping raw materials for chemical reactor so that the supply of raw materials can be cut off even if only one of the two emergency shut-off valves is operated during the runaway reaction. The automatic on/off valve is installed in parallel in the supply pipe of the reaction inhibitor so that the reaction inhibitor can be injected even if only one valve is opened at the time of the runaway reaction.

A Study of SIL Allocation with a Multi-Phase Fuzzy Risk Graph Model (다단계 퍼지 리스크 그래프 모델을 적용한 SIL 할당에 관한 연구)

  • Yang, Heekap;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.170-186
    • /
    • 2016
  • This paper introduces a multi-phase fuzzy risk graph model, representing a method for determining for SIL values for railway industry systems. The purpose of this paper is to compensate for the shortcomings of qualitative determination, which are associated with input value ambiguity and the subjectivity problem of expert judgement. The multi-phase fuzzy risk graph model has two phases. The first involves the determination of the conventional risk graph input values of the consequence, exposure, avoidance and demand rates using fuzzy theory. For the first step of fuzzification this paper proposes detailed input parameters. The fuzzy inference and the defuzzification results from the first step will be utilized as input parameters for the second step of the fuzzy model. The second step is to determine the safety integrity level and tolerable hazard rate corresponding to be identified hazard in the railway industry. To validate the results of the proposed the multi-phase fuzzy risk graph, it is compared with the results of a safety analysis of a level crossing system in the CENELEC SC 9XA WG A0 report. This model will be adapted for determining safety requirements at the early concept design stages in the railway business.

Implementation of Main Computation Board for Safety Improvement of railway system (철도시스템의 안전성 향상을 위한 주연산보드 구현)

  • Park, Joo-Yul;Kim, Hyo-Sang;Lee, Joon-Hwan;Kim, Bong-Taek;Chung, Ki-Seok
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1195-1201
    • /
    • 2011
  • Since the release of safety standard IEC 61508 which defines functional safety of electronic safety-related systems, SIL(Safety Integrity Level) certification for railway systems has gained lots of attention lately. In this paper, we propose a new design technique of the computer board for train control systems with high reliability and safety. The board is designed with TMR(Triple Modular Redundancy) using a certified SIL3 Texas Instrument(TI)'s TMS570 MCU(Micro-Controller Unit) to guarantee safety and reliability. TMR for the control device is implemented on FPGA(Field Programmable Gate Array) which integrates a comparator, a CAN(Controller Area Network) communication module, built-in self-error checking, error discriminant function to improve the reliability of the board. Even if a malfunction of a processing module occurs, the safety control function based on the proposed technique lets the system operate properly by detecting and masking the malfunction. An RTOS (Real Time Operation System) called FreeRTOS is ported on the board so that reliable and stable operation and convenient software development can be provided.

  • PDF

Design and Assessment of a Watch Dog Timer for Safety Improvement of an Embedded Railway Signal Controller (철도신호 내장형제어기 안전성 향상을 위한 워치독타이머 설계 및 평가)

  • Shin, Duc-Ko;Lee, Kang-Mi;Lee, Jae-Ho;Kim, Yong-Kyu
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.730-734
    • /
    • 2007
  • In this paper, we suggest the criticality of Hidden Failure with regard to the design of watch dog timer, used to detect HALT on railway signaling embedded controller, via FMEA and FTA. Hidden Failure means reliability and safety degradation of the system due to any failure occurred on elements added for fault tolerance. In this paper, therefore, we design vital watch dog timer to prevent the system from operating in low SIL conditions and assess the safety of circuit on failure occurrence to demonstrate that safety degradation problems owing to existing design are supplemented.

A Study on the Safety Plan for a Train Control System (열차제어시스템의 안전계획 수립에 관한 연구)

  • Kim Jong-Ki;Shin Duc-Ko;Lee Key-Seo
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.264-270
    • /
    • 2006
  • In this paper we present a safety plan to be applied to the development of the TCS(Train Control System). The safety plan that can be applied to the life cycle of a system, from the conceptual design to the dismantlement, shows the whole process of the paper work in detail through the establishment of a goal, analysis and assessment, the verification. In this paper we study about the making a plan, the preliminary hazard analysis, the hazard identification and analysis to guarantee the safety of the TCS. The process far the verification of the system safety is divided into several steps based on the target system and the approaching method. The guarantee of the system safety and the improvement of the system reliability is fellowed by the recommendation of the international standards.

Railway System Functional Safety and Certification (철도 시스템 기능 안전(Functional Safety) 및 인증)

  • Kim, You-Ho;Lee, Soo-Hwan;Park, Kang-Hun;Ko, Tae-Kuk
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.226-235
    • /
    • 2014
  • Nowadays, railroads are considered the most efficient form of mass transportation. Furthermore, it is necessary that railroads be paired with state-of-the-art safety equipment. Unfortunately, it is impossible to prevent 100% of accidents that may be caused by system or human errors. In order to prevent future accidents, RAMS activity and Functional Safety Certification are required for new systems that are under development. In this paper we evaluate the necessity of the application of RAMS and the performance of RAMS in the system development process. We also explore the Safety Evaluation Procedure required for RAMS certification.