• Title/Summary/Keyword: SCADA

Search Result 373, Processing Time 0.026 seconds

M2M Gateway based on CoAP in SG Environment (SG 환경에서 CoAP 기반 M2M 게이트웨이)

  • Shin, In-Jae;Park, Jee-Won;Lee, Sang-Hoon;Song, Byung-Kwen
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.47-48
    • /
    • 2015
  • As the power system develops rapidly into a smarter and more flexible state, so must the communication technologies that support it. Machine to machine (M2M) communication in Smart Grid environment has been discussed in European Telecommunications Standards Institute (ETSI). The power system is not easily replaceable, due to system replacement cost. The M2M gateway is required in other to improve interoperability in M2M environment. The Distributed Network Protocol 3.0 (DNP3.0) is the most important standard in the SCADA systems for the power. It has been used for device data collection/control in Substation Systems, Distribution Automation System. If the DNP3.0 data model is combined with a set of contemporary web protocols, it can result in a major shift. We selected Constrained Application Protocol (CoAP) based on RESTful as M2M protocol. It is a specialized web transfer protocol for use with constrained nodes and constrained networks. We have used the OPNET Modeler 17.1 in order to verity the SOAP versus CoAP. In this paper, we propose the CoAP-based M2M Gateway to Distribution Automation system using DNP3.0 in Smart Grid Environment.

  • PDF

An Inquire into Test Bed Compositions in Assessing the Security of a Soft Redundancy Sub-Station System with Auto-Restoration (이중화 자동복구 보안기능이 구비된 배전반의 보안성 평가를 위한 테스트베드 구성에 대한 고찰)

  • Choi, Hyeong-Seok;Jin, Chang-Gi;Bae, Gi-Deok
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.7
    • /
    • pp.99-109
    • /
    • 2012
  • Sub-station, key equipment in electric power infrastructure, are being exposed to increasing risk of hacking. For this, soft redundancy sub-station system needs to be formulated with automatic restoration mechanism. For this it is important to assess the reliability of the applicable range of data that are used in actual system operation, as well as the methods and findings of the tests. At the same time performance of soft redundancy system and total security mechanism, which are aligned for the protection of the sub-station, need to be tested. For testing the above-mentioned, this paper presented a viable formation of a soft redundancy practical VPN system within a panel to protect the latter from hacking or cracking incidences, and conducts a test to check if the considered system actually serves the protection function in the actual operation setting, gathering evidence from the data from the testing of the actual performance of the system as well as of emergency scenario simulation operations. Because tested soft-redundancy & restorative sub-station system is expected to be widely applicable for various cases such as Smart-grid or electricity IT system, where VPN with enhanced level of security is required.

Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields (간척지 논 침수 원인 조사와 방재 대책 수립)

  • Jeong, Ju-Hong;Yoon, Kwang-Sik;Choi, Soo-Myung;Yoon,, Suk-Gun;Go, Young-Bae;Kim, Young-Taek
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.105-114
    • /
    • 2010
  • Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

  • PDF

A Brief Introduction of A New Communication Architecture in Substation Automation System (변전소 자동화 시스템에 적용되는 새로운 통신 아키텍처에 관한 고찰)

  • You, Jeong-Sik;Choi, Dae-Hee;Kim, Hyung-Geun;Kim, Hong-Seok;Lee, Hak-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.180-182
    • /
    • 2002
  • 전력 시장의 자율 경쟁체제가 본격화되면서 기존 공급자 중심의 시장은 급격하게 사용자 중심의 시장으로 재편되어 가고 있다. 기존의 최소한의 '데이터'라는 개념은 최대한의 '정보'라는 개념으로 변화되었다. 정보의 신속하고 효율적인 관리는 변전소 자동화 시스템의 핵심 전략이자 이를 기반으로 한 전력 시스템의 IT화를 가속화시키는 원동력이 되었다. 외국의 경우 1990년대 초에 등장한 UCA2(Utility Communication Architecture)를 기반으로 한 IEC 61850(Communication Networks and systems in substation)이라는 새로운 통신 아키텍처의 도입을 서두르고 있다. IEC 61850은 IEC에서 추진중인 표준화작업의 일환으로 기존의 포인트와 태그(address) 중심의 전력 SCADA 시스템과는 달리 디바이스 및 관련 정보를 데이터 클래스 모델링을 통해 객체화하고 이 표준 객체를 통해 공통의 언어로 통신을 하는 방식으로 wire 중심이 아닌 bus 중심의 통신 방식(Ethernet)을 채용하여 대용량 정보의 실시간 전송 및 이기종간 통신이 가능한 장점을 가지고 있다. 본 논문에서는 IEC 61850을 중심으로 변전소 자동화 시스템 및 전력 시스템의 IT화와 관련된 표준 통신 프로토콜들을 소개하고 전력시스템과 변전소 환경이라는 특수 상황을 고려하여 새롭게 등장한 아키텍처의 특징을 살펴본다.

  • PDF

An ICCP Application Method for an Error Decrease of the Power Control Communication System (전력제어 통신 시스템의 에러 감소를 위한 ICCP 적용 방안)

  • 김종빈;정래성
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.40 no.9
    • /
    • pp.349-357
    • /
    • 2003
  • Because of capacity of the electric power equipment grew larger and the electric power system was complicated, it was required a protocol to process data without the errors in order to supply the high quality and stable electric power. However, HDLC and TCP/IP communication protocol using between Seoul EMS and Kwangju RCC (or between RCC and SCC) is decreasing reliability by the delay of speed and the occurrence of errors. In this paper, we applied ICCP(Inter-Control Center Communication Protocol) communication protocol in order to improve them and implemented an electric power communication system for remote control of the electric power equipment. Also, we modified program for error correction and implemented the system using the most suitable BLT. The errors were more decreased in case of ICCP protocol than HDLC protocol and TCP/IP protocol applied to the electric power communication system.

Trend Analysis and Diagnosis for BWTS Remote Monitoring (BWTS 원격 모니터링을 위한 트렌드 분석 및 진단)

  • Choi, Wook-Jin;Kim, Chin-Hoon;Choi, Hwi-Min;Lee, Kwang-Seob;Choi, Woo-Jin;Kim, Joo-Man
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.9 no.3
    • /
    • pp.127-135
    • /
    • 2014
  • On lot of ships, Ballast Water Treatment Systems(BWTS) are in use, or the newly built ship should be mandatory installation by 2017. It is IMO(International Maritime Organization) regulations. Because the vessel is in long distance, It is managed this system only in the vessel and it may occur considerable cost of maintenance when a problem arises from BWTS. We describe in this paper how to monitor treated ballast water to make sure the ballast water and BWTS on a ship is in proper condition, but before the port entrance. In addition, analysing and forecasting trend signal to prevent failure. Also we can expect reduce the cost of BWTS maintenance. We can monitor the sensor data value's change which collected through satellite from BWTS. And we can observate the ballasting and de-ballasting state of the vessel easily.

Power System Design in the Inchon Inta'l Airport (인천국제공항 전력시스템 설계)

  • Oh, Y.D.;Min, S.J.;Lim, J.G.;Moon, J.H.;Lee, T.S.;Lee, K.S.;Son, J.Y.;Kim, J.H.;Moon, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1125-1127
    • /
    • 1998
  • Inchon International Airport(IIA) is constructed for Northeast Asia Gate as is important for IIA to become a 21 century's leader in the world. as is planned for open at December 2000 as a important economic link for unified korea. Power System is designed through investigation of advanced domestic and international example. In addition to power facility operation it is designed for using an information infrastructure of whole airport. IIA Power System Design make instantaneously the Power Distribution Facilities and the SCADA System to construct the airport. and the Airport Power Information System to operate the Power System. It is designed to take efficient and safe Power System including the advanced technology. Power System make the integrated Power Information Database to operate the Main Control Center, analyze the data about the relation of the Power System and Airport operation, and will support the important files in the future.

  • PDF

Data Modeling for Developing the Baseline Network Analysis Software of Korean EMS System (한국형 EMS 시스템의 Baseline 계통 해석용 소프트웨어 개발을 위한 데이터 모델링)

  • Yun, Sang-Yun;Cho, Yoon-Sung;Lee, Wook-Hwa;Lee, Jin;Sohn, Jin-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.1842-1848
    • /
    • 2009
  • This paper summarizes a data modeling for developing the baseline network analysis software of the Korean energy management system (EMS). The study is concentrated on the following aspects. First, the data for operating the each application software are extracted. Some of the EMS network application softwares are selected for basis model. Those are based on the logical functions of each software and are not considered the other softwares. Second, the common data are extracted for equipment model and topological structure of power system in Korea. We propose the application common model(ACM) that can be applied whole EMS network application softwares. The ACM model includes the hierarchy and non-hierarchy power system structure, and is connected each other using the direct and indirect link. Proposed database model is tested using the Korea Electric Power Corporation(KEPCO) system. The real time SCADA data are provided for the test. Through the test, we verified that the proposed database structure can be effectively used to accomplish the Korean EMS system.

Complete and Incomplete Observability Analysis by Optimal PMU Placement Techniques of a Network

  • Krishna, K. Bala;Rosalina, K. Mercy;Ramaraj, N.
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.1814-1820
    • /
    • 2018
  • State estimation of power systems has become vital in recent days of power operation and control. SCADA and EMS are intended for the state estimation and to communicate and monitor the systems which are operated at specified time. Although various methods are used we can achieve the better results by using PMU technique. On placing the PMU, operating time is reduced and making the performance reliable. In this paper, PMU placement is done in two ways. Those are 'optimal technique with pruning operation' and 'depth of unobservability' considering incomplete and complete observability of a network. By Depth of Unobservability Number of PMUs are reduced to attain Observability of the network. Proposed methods are tested on IEEE 14, 30, 57, SR-system and Sub systems (1, 2) with bus size of 270 and 444 buses. Along with achieving complete observability analysis, single PMU loss condition is also achieved.

Communication Architecture of the IEC 61850-based Micro Grid System

  • Yoo, Byong-Kwan;Yang, Seung-Ho;Yang, Hyo-Sik;Kim, Won-Yong;Jeong, Yu-Seok;Han, Byung-Moon;Jang, Kwang-Soo
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.605-612
    • /
    • 2011
  • As the power grids are integrated into one big umbrella called a "smart grid," communication protocol plays a key role in successful operations. The successful deployment of smart grid interoperability is a major hurdle that must be overcome. The micro grid, a small power system that distributes energy resource, is operated in diverse regions. Different vendors use different communication protocols in the operation of the micro grid. Recently, the IEC 61850 has been legislated to solve the interoperability problems in power utility automation. The present paper presents a micro grid system based on the IEC 61850 protocol. It consists of a micro grid monitoring system, a protocol converter that transforms serial data to IEC 61850 data, and distributed energy resource controllers for diverse DER nodes. A developed communication gateway can be deployed for DER controllers with serial links to exchange data with IEC 61850-based devices. The gateway can be extended to IEC 61850-based distribution automation systems, substation automation systems, or SCADA.