• Title/Summary/Keyword: S-rail

Search Result 876, Processing Time 0.032 seconds

Magnetic Markers-based Autonomous Navigation System for a Personal Rapid Transit (PRT) Vehicle (PRT 차량을 위한 자기표지 기반 무인 자율주행 시스템)

  • Byun, Yeun-Sub;Um, Ju-Hwan;Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won
    • Journal of Digital Convergence
    • /
    • v.13 no.1
    • /
    • pp.297-304
    • /
    • 2015
  • Recently, the demand for a PRT(Personal Rapid Transit) system based on autonomous navigation is increasing. Accordingly, the applicability investigations of the PRT system on rail tracks or roadways have been widely studied. In the case of unmanned vehicle operations without physical guideways on roadways, to monitor the position of the vehicle in real time is very important for stable, robust and reliable guidance of an autonomous vehicle. The Global Positioning System (GPS) has been commercially used for vehicle positioning. However, it cannot be applied in environments as tunnels or interiors of buildings. The PRT navigation system based on magnetic markers reference sensing that can overcome these environmental restrictions and the vehicle dynamics model for its H/W configuration are presented in this study. In addition, the design of a control S/W dedicated for unmanned operation of a PRT vehicle and its prototype implementation for experimental validation on a pilot network were successfully achieved.

Development of an Imaging Based Gang Protection System

  • Grimm, M.;Pelz, M.
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.149-156
    • /
    • 2008
  • During maintenance or construction works in or at the tracks of railways, high risks for passengers and railway staff, especially for the workers on the construction site exist. The high risks result out of the movement of rail vehicles, like trains or construction vehicles, which must be faced by using any available technical and operational technologies for securing them against the environment. Therefore, it is necessary to evaluate the level of protection continuously and to identify new and innovative methods and technologies for the protection of the gang (construction worker, machines and material). Especially on construction sites at line sections with two or more parallel tracks but also with single tracks, there are still a lot of incidents and accidents mostly with seriously injured persons or fatalities. These were mainly gang members that breach the railway-loading gage. By using proper warning or protection systems, the avoidance of such accidents must be achieved. The latest developments. in gang protection systems concern on the one hand fixed barriers in the middle between the construction site and the operated track and on the other hand construction vehicles equipped with automatic warning systems. The disadvantage of such protection methods is that the gang can be warned against an approaching train but a monitoring of the gang members cannot be performed. Only one part of a potential dangerous situation will be detected. If the gang members will overhear the acoustic warning signal of the security staff and the workers will not leave the danger zone in the track, the driver of the approaching train had no chance to react to the dangerous situation. An accident is often inevitable. While the detection of acoustic warning signals by the gang members working on a construction site is very difficult, the acoustical planning of an automatic warning system has to be designed for an acoustic short range level of one meter besides the construction vehicle. The decision about the use of today's technical warning system (fixed systems, automatic warning systems, etc.) must be geared to the technical feasibility and the level of safety which is needed. Criteria for decision guidance to block a track should be developed by danger estimation and economical variables. To realize the actual jurisdiction and to minimize the hazards of railway operations by the use of construction vehicles near the tracks further developments are needed. This means, that the warning systems have to be enhanced to systems for protection, which monitor the realization of the warning signal as a precondition for giving a movement authority to a train. This method can protect against accidents caused by predictable wrongdoing. The actual state of the art technique of using a collective warning combined with additional security staff is no longer acceptable. Therefore, the Institute of Transportation System of the German Aerospace Center in Braunschweig (Germany) will develop a gang warning and protection system based upon imaging methods, with optical sensors such as video in visible and invisible ranges, radar, laser, and other. The advantage of such a system based on the possibility to monitor both the gang itself and the railway-loading gauge either of the parallel track or of the same track still in use. By monitoring both situations, the system will be able to generate a warning message for the approaching train, that there are obstacles in the track, so that the train can be stopped to prevent an accident. And also the gang workers will be warned, while they breach their area.

  • PDF

Estimating O-D Trips Between Sub-divided Smaller Zones Within a Traffic Analysis Zone (대존 세분화에 따른 내부 소존 간의 O-D 통행량 추정 방법)

  • KIM, Jung In;KIM, Ikki
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.575-583
    • /
    • 2015
  • The Korea Transport Institute (KOTI) builds the origin and destination(O-D) trip data with relatively smaller zone size such as Eup, Myeon, Dong administration unit districts in metropolitan area. Otherwise, O-D trip data was built by bigger size of traffic analysis zone(TAZ) such as Si, Gun, Gu administration unit districts for rural area. In some cases, it is needed to divide a zone into several sub-zones for rural area in order to analyze travel distribution pattern in detail for a certain highway and rail project. The study suggested a method to estimate O-D trips for sub-zones in the larger-size zones in rural area. Two different distribution models, direct demand model and gravity model, were calibrated for sub-zone's intra-zonal O-D trip pattern with metropolitan area O-D data which has smaller zone-size (sub-zone) data categorized by low, middle and high population density. The calibration results were compared between the two models. The gravity model with impedance function of power functional form was selected with better explanation for all groups in the metropolitan area. The adjusted $R^2$ was 0.7426, 0.6456 and 0.7194 for low, middle and high population density group, respectively. The suggested O-D trip estimating method is expected to produce enhanced trip patterns with sub-divided small zones.

A study on Air and High Speed Rail modal According to the Introduction of Low Cost Carrier Air Service (저비용항공 진입에 따른 항공과 고속철도수단 선택에 관한 연구)

  • Lim, Sam-Jin;Lim, Kang-Won;Lee, Young-Ihn;Kim, Kyung-Hee
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.51-61
    • /
    • 2008
  • Most of Korea's 15 local airports, with the exception Jeju, Gimpo and Gimhae airports, have been several billion Won in the red each year. It has been reported that one of the causes of the poor financial performance is inaccurate air traffic demand predictions. Under the situation, the entry of low-cost carrier air service using turbo-prop airplanes into the domestic airlines market gets a wide range of support, which is expected to promote the convenience of consumers and help to activate local airports. In this study, the authors (1) suggest a high-speed transport demand model among existing airlines, Korea Train Express (KTX) and low-cost carrier air service; (2) try to make low-cost air carrier demand predictions for a route between Seoul and Daegu through a stated-preference survey; and (3), examine possible effectiveness of selected policy measures by establishing an estimation model. First, fare has a strong influence for mode choice between high-speed transport modes when considering the entry of low-cost carrier air service between Seoul and Daegu. Even low-cost carrier air service fare is set at 38,000 won, which is considerably low compared with that of KTX, in the regions where the total travel time is the same for both low-cost carrier air service and KTX, the probability of selecting low-cost carrier air service is 0.1, which shows little possibility of modal change between high speed transportation means. It is suggested that the fare of low-cost air service between Seoul and Daegu should be within the range of from of 38,000 to 44,000 Won; if it is higher, the demand is likely to be lower than expected.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Track Models Generation Based on Spatial Image Contents for Railway Route Management (철도노선관리에서의 공간 영상콘텐츠 기반의 궤적 모델 생성)

  • Yeon, Sang-Ho;Lee, Young-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.30-36
    • /
    • 2008
  • The Spatial Image contents of Geomorphology 3-D environment is focused by the requirement and importance in the fields such as, national land development plan, telecommunication facility management, railway construction, general construction engineering, Ubiquitous city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. There it is needed to apply laser measurement technique in the spatial target object to obtain accuracy. Currently, the LiDAR data which combines the laser measurement skill and GPS has been introduced to obtain high resolution accuracy in the altitude measurement. In this paper, we tested of the railway facilities using laser surveying system, then we propose data a generation of spatial images for the optimal manage and synthesis of railway facility system in our 3-D spatial terrain information. For this object, LiDAR based height data transformed to DEM, and the realtime unification of the vector via digital image mapping and raster via exactness evaluation is transformed to make it possible to trace the model of generated 3-dimensional railway model with long distance for 3D tract model generation. As the results, We confirmed the solutions of varieties application for railway facilities management using 3-D spatial image contents.

  • PDF

Optimal Path Finding Considering Smart Card Terminal ID Chain OD - Focused on Seoul Metropolitan Railway Network - (교통카드 단말기ID Chain OD를 반영한 최적경로탐색 - 수도권 철도 네트워크를 중심으로 -)

  • Lee, Mee Young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.6
    • /
    • pp.40-53
    • /
    • 2018
  • In smart card data, movement of railway passengers appears in order of smart card terminal ID. The initial terminal ID holds information on the entering station's tag-in railway line, the final terminal ID the exit station tag-out railway line, and the middle terminal ID the transfer station tag subway line. During the past, when the metropolitan city rail consisted of three public corporations (Seoul Metro, Incheon Transit Corporation, and Korail), OD data was expressed in two metrics of initial and final smart card terminal ID. Recently, with the entrance of private corporations like Shinbundang Railroad Corporation, and UI Corporation, inclusion of entering transfer line terminal ID and exiting transfer line terminal ID as part of Chain OD has become standard. Exact route construction using Chain OD has thus become integral as basic data for revenue allocation amongst metropolitan railway transport corporations. Accordingly, path detection in railway networks has evolved to an optimal path detection problem using Chain OD, hence calling for a renewed solution method. This research proposes an optimal path detection method between the initial terminal ID and final terminal ID of Chain OD terminal IDs within the railway network. Here, private line transfer TagIn/Out must be reflected in optimal path detection using Chain OD. To achieve this, three types of link-based optimum path detection methods are applied in order of 1. node-link, 2. link-link, 3. link-node. The method proposed based on additional path costs is shown to satisfy the optimal conditions.

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.

Vehicle-Bridge Interaction Analysis of Railway Bridges by Using Conventional Trains (기존선 철도차량을 이용한 철도교의 상호작용해석)

  • Cho, Eun Sang;Kim, Hee Ju;Hwang, Won Sup
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1A
    • /
    • pp.31-43
    • /
    • 2009
  • In this study, the numerical method is presented, which can consider the various train types and can solve the equations of motion for a vehicle-bridge interaction analysis by non-iteration procedure through formulating the coupled equations of motion. The coupled equations of motion for the vehicle-bridge interaction are solved by the Newmark ${\beta}$ of a direct integration method, and by composing the effective stiffness matrix and the effective force vector according to a analysis step, those can be solved with the same manner of the solving procedure of equilibrium equations in static analysis. Also, the effective stiffness matrix is reconstructed by the Skyline method for increasing the analysis effectiveness. The Cholesky's matrix decomposition scheme is applied to the analysis procedure for minimizing the numerical errors that can be generated in directly calculating the inverse matrix. The equations of motion for the conventional trains are derived, and the numerical models of the conventional trains are idealized by a set of linear springs and dashpots with 16 degrees of freedom. The bridge models are simplified by the 3 dimensional space frame element which is based on the Euler-Bernoulli theory. The rail irregularities of vertical and lateral directions are generated by the PSD functions of the Federal Railroad Administration (FRA). The results of the vehicle-bridge interaction analysis are verified by the experimental results for the railway plate girder bridges of a span length with 12 m, 18 m, and the experimental and analytical data are applied to the low pass filtering scheme, and the basis frequency of the filtering is a 2 times of the 1st fundamental frequency of a bridge bending.

A Study on The Iron Monument in The era of Joseon Dynasty (조선시대(朝鮮時代) 철비(鐵碑)의 조영(造營) 연구(硏究))

  • Hong, Dai Han
    • The Korean Journal of Archival Studies
    • /
    • no.24
    • /
    • pp.215-274
    • /
    • 2010
  • Iron-making industries of the country, regardless of age has been the focus. This makes the iron production technology and production techniques that result in increased economic activity and because of the central charge. Therefore, the social development of ancient iron-making technology is based on phase-sensitive. Modern steel making up the monopoly of the country's target under the strict control of production, distribution was. It is essential to produce iron weapons was a threat is because you can keep the throne in the hands of the forces that can cause side effects when I went was to block. This study created a rail Cholbi(iron monument) and the regional distribution pattern of the production, construction background, looked on. Cholbi(iron monument) for the production and recording "the Annals of the Joseon Dynasty" often appear in history books and many academic interests, but was off target. Compared to a stone monument that was not generally as well as the Japanese colonial period and over the course of modernization destroyed, damaged a lot of cases the cause may be found in front. Cholbi(iron monument), except for the gravestones of the Joseon Dynasty monument erected in honor of virtue, as an example of content that dominated a packman business, founding of the school and confirmed that a few were built as a special purpose. Cholbi(iron monument) compared to the production technology or the cost of the monument's difficulty in financing follows. Therefore Cholbi(iron monument) the establishment of the Joseon Dynasty through the background of the economic situation and the local government can look. And iron technology began complaining about the object of history, economic conditions, with the change of season has been a change in people's consciousness tells you. Important data of ancient history as an epigraph that has been as important, the Middle Ages to modern times ranging from newly born to the time Cholbi(iron monument) in the development of the country's documentary subject to change should have been brought. Based on these discussions changes the identity of the hero monument and production inspector, review of production through the Joseon Dynasty period Cholbi (iron monument) contemplated the significance is reflected in production.