• Title/Summary/Keyword: S-TRACK

Search Result 1,455, Processing Time 0.033 seconds

Evaluation of the Dynamic Stability of Subway Bridge in the Applying B2S Track (B2S궤도 적용에 따른 철도교량의 동적안정성 검토)

  • Kong, Sun-Yong;Kim, Sang-Jin;Baik, Chan-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.20-27
    • /
    • 2009
  • This paper presents an analytic study for replacement of the ballast track in existing subway bridge by the Precast slab panel(B2S) track. To evaluate the dynamic responses on application of B2S track, the time history analysis with the 3D modeling. A total of two models, which were one ballast track bridge and B2S track bridge, were used in the FE analysis. The results of this study show that the dynamic displacement and acceleration of the B2S track bridge were significantly reduced for a higher train speed, compared to the ballast track bridge. Also, the replacement of the ballast track bridge in existing subway bridge by the B2S track increased the structural safety of bridge and ensured sufficient dynamic stability and serviceability. As a result, the servicing subway bridge with B2S track system has need of the reasonable measures which could be reducing the static and dynamic response and improving the performance.

  • PDF

The Analysis of the Change Process of Fisheries Track's High School Curriculum: Focusing on the 5th-7th Revised National Curriculum (수산계열 고등학교 교육과정의 변천과정 분석 - 제5차에서 제7차 교육과정을 중심으로 -)

  • Park, Chang-Un;Ju, Dong-Beom
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.22 no.1
    • /
    • pp.25-37
    • /
    • 2010
  • This study was attempted to analyze the change process of fisheries track's high school curriculum related with the 5th-7th revised national curriculum. To accomplish this goal, the nature and goals of fisheries track's high school were reviewed. First, it was found that the fisheries track's high school was classified into three groups; high school for special goal, characterization, and industry. And the goal of fisheries track's high school was designated to harmonize the general education and vocational education in high school goal. Second, the legal basis and system of national curriculum in fisheries track's high school were discussed. The legal basis of national curriculum in fisheries track's high school was prescribed to the 'Elementary and Secondary Education Act'. The system of national curriculum was composed the general guideline and subjects. Third, the change process of fisheries track's high school national curriculum was discussed. The system of decision, general guideline, and subjects in fisheries track's high school national curriculum were seemingly to be studied on the basis of the autonomy or diversity. In conclusion, the concrete content of fisheries track's high school national curriculum was not changed compared to the 5th-7th revised curriculum.

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

Improvement and Behavior Analysis of Track Structure for Urban Maglev System (도시형 자기부상철도 궤도구조 개선 및 거동분석)

  • Choi, Eun-Soo;Lee, Hee-Up;Kim, Lee-Hyeon;Chung, Won-Seok
    • Proceedings of the KSR Conference
    • /
    • 2006.11a
    • /
    • pp.239-252
    • /
    • 2006
  • The existing track structure for urban Maglev system is designed for the Maglev vehicles of HSST in Japan and UTM in Korea. The tracks hvaing cross beams for supporting rails are located on bridge girders and have several draw backs. Linimo in Nagoya, Japan, the first commercial urban Maglev line, has separated tracks from a bridge to overcome the previous track structure. However, the Linimo just put the existing track on bridge deck. This study suggests a improved track structure for urban Maglev system and compares the behavior of the new and existing track through static structural analyses. In the improved track, the power collector of a Maglew vehicle is installed parallel to the bridge deck surface, and, thus, the bottom width of the track structure is not limited by the vehicle's width. Therefore, the live load is distributed more effectively by the wide bottom of the track. Also, steel plates instead of steel cross beams are used to support rails, and, thus, the rail's deflection is improved.

  • PDF

Correlation Analysis between Crack and TQI in RC Slab Track

  • Kwon, Se-Kon;Park, Mi-Yun;Kim, Doo-Kie;Sho, Byung-Choon;Park, Jae-Hak
    • International Journal of Railway
    • /
    • v.7 no.1
    • /
    • pp.8-15
    • /
    • 2014
  • Recently, in the total railroad construction field, concrete slab tracks have been adapted in place of ballast tracks. Because ballast tracks need frequent maintenance and are difficult to handle due to increasing maintenance costs, eventually concrete slab tracks were selected as an alternative. However, owing to the hydration heat reactions and temperature-affected shrinkage of the concrete, a variety of studies to solve maintenance problems related to concrete slab tracks are underway. This study analyzed characteristics of TQI values evaluating track irregularity, investigated the relationship between crack progress and TQI, and then evaluated the correlation between the two values. Through our analysis, we found that there is a need to supplement the problems of the current method and develop a track evaluation index which takes cracking into account. We also concluded that TQI is the main decision-making tool in track maintenance.

A Study on the Design of ESJ of Jointless Track Circuit (무절연 궤도회로의 ESJ설계에 대한 연구)

  • 김정열;신석균;정용운;이기서;이길영
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.195-201
    • /
    • 2000
  • In this paper propose the new method on desig ESJ(Electrical Separation Joint) of Jointless Track Circuit. ESJ has a capability to saparate track signal electrically but enable connected a track section physically. So It is more proper to high-speed line. Because that demand a critical traveling safety and convient taking a train. In spite of existing ESJ of Jointless Track Circuit, UM7l, S-bond, According to new pole-zero placement and desgining tuining-unit It is possible to prove a independence of track-section and track-signal in new ESJ design of this paper

  • PDF

Prediction of Bending Fatigue Life to Welding Parts of Rail on Slab Track (슬래브궤도상의 레일 용접부 피로수명 예측)

  • 김만철;김진성;한상철
    • Journal of the Korean Society for Railway
    • /
    • v.4 no.4
    • /
    • pp.138-146
    • /
    • 2001
  • For the purpose of the effective maintenance of surface irregularities of rail, this paper investigates the rail service life to a bending fatigue failure of welding parts of rail on the slab track by the structures laboratory testing to derive S-N curves, a GTDAP(General Track Dynamic Analysis Program) to calculate the stresses and a modified Miner's rule to predict a fatigue life. The useful guides for maintenance of rail welded parts on the slab track are proposed in terms of a grinding period and the depth of rail surface irregularities. This study also proposed the guides for maintenance of rail welded part on the ballast track. The effects of fatigue service lives are compared one another.

  • PDF

A Study of Reinforcement of Railway Structure Approaches in Conventional line (기존선 철도구조물 접속부의 보강에 대한 고찰)

  • Park, Joon-Oh;Lee, Sang-Bae;Kim, Kwan-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.442-452
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and this influences passenger's comfort and the safety of operation, and it needs more track maintenance. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF