• Title/Summary/Keyword: Rubber-Tired

Search Result 84, Processing Time 0.017 seconds

Development of Flooding area estimation module for Rubber-tired Tram Disaster Management System Using the SWMM Model (SWMM 모형을 이용한 홍수시 바이모달 트램 운행 노선에 대한 침수 면적 산정 모듈 개발)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.61-65
    • /
    • 2008
  • Urban flooding with surcharges in sewer system was investigated because of unexpected torrential storm events these days, causing significant amounts of human and economic damages. Although there are limitations in forecasting and preventing natural disasters, integrated urban flooding management system using the SWMM engine and Web technology will be an effective tool in securing safety in operating Bi-modal transportation system. In addition, the integrated urban flooding management system can be linked with general and transportation-related disaster management system in the future. In this study, With simulated values by the SWMM, which is a core engine of the Bi-modal disaster management system, flash flooding area estimation module was developed. Thus, the SWMM system codes were modified and new module was developed and integrated with the existing SWMM interface using the Delphi programming language. The flash flooding area estimation module is fully integrated with the SWMM interface, thus the area is estimated on-the-fly inside the system.

  • PDF

Radio coverage prediction of RF-CBTC system under transmission power 10mW/MHz at K-AGT test line (경전철시험선에서 송신전력 10mW/MHz에 대한 열차제어용 무선시스템의 전파도달범위 예측)

  • Cho, Bong-Kwan;Jung, Jae-Il
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.589-595
    • /
    • 2007
  • Korea Railroad Research Institute has developed the driverless rubber-tired K-AGT (Korean-Automated Guideway Transit) system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. Radio Frequency Communication-Based Train Control system of K-AGT, which employed Advanced Automated Train Control scheme, detects train position using the radio propagation delay between wayside and vehicle radio equipment. In this paper, we investigate whether the transmission power of radio system can be reduced to the permitted level announced by the Ministry of Information and Communication for license-free ISM(Industrial Scientific Medical) frequency bands. We first determine radio propagation model, using the measured data at test line, and perform simulation for radio coverage prediction. From the simulation results, we identify that the radio system operated with reduced power can provide good link quality in total test line.

Evaluation of SWMM Model Adjustment for Rubber-tired Tram Disaster Management System against the Snow-melt during the Winter (겨울철 융설을 대비한 바이모달 트램 재해관리 시스템의 SWMM 모형 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.56-60
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the urban flash flooding and snow pack melt/freezing due to unexpected rainfall event and snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snowfall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for snow removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system predicted data.

  • PDF

Serviceability Assessment of a K-AGT Test Bed Bridge Using FBG Sensors (광섬유 센서를 이용한 경량전철 교량의 사용성 평가)

  • Kang, Dong-Hoon;Chung, Won-Seok;Kim, Hyun-Min;Yeo, In-Ho
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.27 no.4
    • /
    • pp.305-312
    • /
    • 2007
  • Among many types of light rail transits (LRT), the rubber-tired automated guide-way transit (AGT) is prevalent in many countries due to its advantages such as good acceleration/deceleration performance, high climb capacity, and reduction of noise and vibration. However, AGT is generally powered by high-voltage electric power feeding system and it may cause electromagnetic interference (EMI) to measurement sensors. The fiber optic sensor system is free from EMI and has been successfully applied in many applications of civil engineering. Especially, fiber Bragg grating (FBG) sensors are the most widely used because of their excellent multiplexing capabilities. This paper investigates a prestressed concrete girder bridge in the Korean AGT test track using FBG based sensors to monitor the dynamic response at various vehicle speeds. The serviceability requirements provided in the specification are also compared against the measured results. The results show that the measured data from FBG based sensors are free from EMI though electric sensors are not, especially in the case of electric strain gauge. It is expected that the FBG sensing system can be effectively applied to the LRT railway bridges that suffered from EMI.