The depth electrode technique, especially using the occipito-temporal route is widely used in the clinic, since it is known to be the most precise method about the invasive study of the mesial temporal lobe epilepsy. The depth electrode with the occipito-temporal route has been applied with manual calculation of MR images. Inherently there are some factor causing significant errors due to geometrical axis alignment, such as miss alignment of horizontal or vertical cutting line. In order to correct it in manually, it takes a long time. In this study, authors has developed the software for automate calculation of MRI wording for instance calculation and for the no time delaying operation. Authors could show that this software is useful for the clinic after applying if for 33 cases of the patients.
The alignment design is one of the most influencing elements in earth work for the railway design. The amount of earth work mostly depends on the route, and the construction cost for railway construction largely depends on it. For this reason. it is necessary to develop a program for the construction cost estimation by route alternatives. This study introduces a program for the estimation of the earth work amount including the logics and the way to use.
This paper presents a GIS-based method of spatial analysis that can be applied to the line determination in traffic infrastructure project . It is based on the spatial analysis of the sensitivity or suitability of areas relating to the integration of new infrastructure routes, carefully considering the requirement of intervention optimizing . It makes the comparison of alternatives and a final selection of a"best route " easier, offers new possibilities and simplifies and accelerates the whole process of line determination. The developed method for route-alignment is tried out by an example project for road planing in Germany. It point out that during the line determination all aspects can be equivalently and adequately evaluated. So this method is well suited as a new tool within a line determination procedure and can bring enormous advantages in the planning process of traffic infrastructure projects. projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.2
/
pp.407-415
/
2015
The railway route and alignment planning have been executed with a limited number of alternatives based on the site pre-survey and the topographic map. This study developed an intelligent railway alignment planning program (ei-Rail) which can derive all the considerable design alternatives and provide the data for the alternative evaluation such as constructions cost, operation cost, and etc. According to the comparisons with prevailing planned railway projects, the time and cost for planning can be reduced as well as the construction costs. This program may contribute to the development of railway industry by reducing the time and cost for planning as well as the total project cost.
Journal of Korean Society for Geospatial Information Science
/
v.4
no.2
s.8
/
pp.195-203
/
1996
The 3-D analysis of terrain for route design and selection is being used as important basic data for effective judgement of political draft. This study is to decide efficient alignment of the entry route and design bridge by modeling, analyzing and displaying surface with digital terrain data. In this study we analyze slope, aspect, shaded-relief, line of sight and watershed on the base of DTM such as contour, TIN and grid. And we can not only esti mate end-area volume for road construction by calculating cut and fill and displaying mass-curve but also recognize the scene after execution with simulation of road and terrain. The result of this study reveals that visual effects of the 3-D terrain data are very effective for designer and decisionmaker to select and review alternative route with regard to terrain characteristics.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.19
no.2
/
pp.137-146
/
2001
Route selection needs the analysis function of GSIS to analyze and manipulate a lot of spatial information efficiently. Therefore, it needs the linkage of system requiring the knowledge and the experience of experts as a method that can estimate each quantitative route for an efficient route selection. In this study, the route selection model through construction and analysis procedure of position information using GSIS were presented, and route selection system linked with expert system was developed. This system is easy to be used and managed for presenting route alignment according to conditions as a graphic user interface environmental window system by applying three tiers based object-oriented method. Using GSIS, the various information required for route selections in database was constructed, the characteristics of subject area by executing three-dimensional terrain analysis was grasped effectively, and the control point through buffering, overlay and location operation was extracted. Three alternative routes between a beginning point and an end point inputted by route selection system were selected. Therefore, the applications of the route selection system are presented by applying this system to the real study area.
Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.13
no.2
/
pp.209-218
/
1995
It is important role that railway speed up plays in realizing an affluent society in future. Curved lines zone have crucial effects on the speed of train travel, at the curved lines zone, it requires to set cant and slack for safety running of train and comfortable ride of passengers, a compromise is therefore to accept a certain degree of cantdeflciencyforthevarioustrain. In this study, it was presented that effective maintenance method according to the investigation of cant value in radius of curvature and analysis safety running of train, calculation of lateral acceleration as cant deficiency, and we obtain the effect of speed up appling route alignment improvement parameter in curved lines zone.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.1
/
pp.165-172
/
2015
The appropriateness of railway route design is generally evaluated by the future value corresponding to the travel demand or benefit-cost analysis. These methods may have the limitation for the reasons that all the design alternatives cannot be considered, and the differentiation between the alternatives may not be significant because the alternatives are based on the strict basic scheme such as the design criteria. In addition, the cost varies by the design elements. In this study, all the design alternatives are considered with the automatized tool and the design criteria, and evaluated with the multi-criterion decision making method. The weight for each design element with the analytic hierarchical process may be helpful to derive more efficient railway alignment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.