Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.796-805
/
2005
Most rockfall prevention net among the rockfall prevention equipment that is constructed in around the road is actuality lack of function by quantitative research insufficiency etc.. Most of rockfall prevention net are composed to setting needle, perpendicular and horizontal wire rope and wire net. Also, function of rockfall prevention net depend on setting needle and the wire net and perpendicular and horizontal wire rope are fixed by setting needle. when unreasonable load is offered setting needle, rockfall prevention net can lose the function and happen continuous falling off of rockfall prevention net. Because rockfall prevention net have a such structural defect, improvement had been required in reply. So in this paper, spot application of Rock Bolt & Net Connection method and falling rock support ability are estimated by numerical analysis. As a result, when Rock Bolt & Net Connection Method is applied to cutting slope, decreases of stress and displacement is examined than current rockfall prevention net.
It is necessary to assess the proper performance of the existing rockfall prevention net in order to minimize the damage to human lives and property in the event of rockfall. However, there is no standard for performance evaluation of rockfall prevention net in Korea, and only the design of rockfall prevention net exists by calculating energy that can be absorbed energy. Therefore, laboratory pullout test was conducted for the performance evaluation of the rockfall prevention net, cuts and load-displacement characteristics of the PVC coating net used in the laboratory pullout test are determined to identify the performance of the rockfall prevention net.
Although standards related to falling stone facilities are established in Korea, the absorption energy of the rockfall prevention net is evaluated from the passage of rockfall and destruction of the rockfall prevention net on field test. The existing PVC coating net does not sufficiently suppress the rockfall load and tears frequently occur, and a high-strength wire rockfall net was developed to prevent. In this study, the performance was analyzed through field tests of the existing PVC coating net and the developed high-strength rockfall net (1,000 MPa, 2,000 MPa).
In order to obtain basic data for reasonable design of rockfall prevention net unreasonably being designed according to experiences, this paper determined a standard cross section and analyzed the effects of parameters such as inclination and height of slope faces, rockfall weight, separation distance on rockfall behaviors such as bounce height, kinetic energy and passage rate. The weight of rockfall changed from 400 kg to 700 kg and then to 1,000 kg. With the height of 20 m as the standard, the test was conducted with the inclination at $63^{\circ}$ and $55^{\circ}$ which may affect rockfall behaviors. Analysis was made while changing the fall height of rockfall from 3 m to 15 m and then to 20 m, thereby analyzing and evaluating changes in maximal kinetic energy occurring in the base of slope. According to the analysis result, in designing a rockfall prevention wire net, a design considering various conditions including inclination of the slope, expected size or weight of rockfall, situation of the slope and the shape of rockfall, and rockfall trace is judged necessary beyond the current uniform application.
Ji, Younghwan;Kim, Kihwan;Kim, Sungho;Hwang, Yeongcheol;Lee, Seungho
Journal of the Korean GEO-environmental Society
/
v.11
no.12
/
pp.47-56
/
2010
The construction of new roads and the consistent extension of already-existing roads or the line-shape revision of those roads are increased with the governmental investment to SOC facilities currently. Accordingly, the road cut slopes are in the trend of rapidly increasing. As the road slope has increased, a lot of human and property damages has entailed consequently and in the local case, numerous studies have carried out aiming at minimizing this damages caused by the rockfall and landslide. In general, standard falling rock prevention facility has employed for most of the local road slope based on "Guide for Installation and Management of Road Safety Facilities" published by MLTM(the Ministry of Land, Transport, and Maritime Affairs) but profound doubt has raised as to whether this rockfall prevention facility would function properly enough to prevent rockfall efficiently without any damages in case of actual occurrence of rockfall. In addition, it is a reality that in most cases, such work is relied on overseas technology as a whole as the local technical level is low and in case of rockfall prevention net, it is judged that a study on rockfall prevention net that is able to endure more powerful rockfall energy is required as the problem including net bursting is taken place as a result of enough bearing force being failed to be demonstrated due to its partial weak point(not uniformly made). Under this background, in this study, three kinds of model depending on mesh size of expanded metal that is considered to have an adoptability as rockfall prevention net, as target are selected and characteristics depending on mesh size of expanded metal is intended to be researched through a pull-out test performance by using pull-out test equipment rockfall prevention net.
Over 60% of South Korea's land consists of mountainous topography, and recently, due to earthquakes, localized heavy rains and road development, the risks of rockfalls are getting higher. As of now, rockfall prevention facilities are being constructed in 70% of Korean roads cut slope and rockfall protections account for about 20% of them. Rockfall protection's supporting capacity is defined by combining performance of wire mesh, pillars and wire ropes. For the existing constructed rockfall protection, standards of pillars that can absorb 48~61 kJ amount of energy, wire ropes and wire mesh are presented in Guidelines for the installation and management of traffic safety facilities, Rockfall prevention facilities by Ministry of Land, Transport and Maritime Affairs (2008). However, each factor's correlation of absorption energy is not presented so it is uncertain. This study will conduct vertical drop test and identify adequacy of rockfall protection net of displacement quantity calculation factor which is delta and evaluate rockfall protection net's absorbable energy through standards of overseas performance evaluation criteria.
The high-strength rockfall net developed in this study is to replace the fallout prevention net method using PVC coating net made of core wire thickness 3.2 mm and tensile strength 290-540 MPa class steel wire. General PVC coating net have low performance, and in the event of falling rocks or surface loss, they cannot withstand the load and are torn, which rather adds to the damage. Developed rockfall net was manufactured using steel wires with a core wire thickness of 2.8 to 3.2 mm and a tensile strength of 1,000 to 2,000 MPa. Test method was referred to the international standard Steel wire rope net panels and rolls-Definitions and specifications (ISO 17746:2016), and was conducted in accordance with the provisions of the punching test. Through indoor punching tests, the load-displacement curves of the general PVC coating network and the developed high-strength capture net (1,000 and 2,000 MPa) were compared, and the maximum Pull-out load was analyzed to be improved by 324.47% (2,000 MPa high-strength net).
It has been generally recognized that the conventional rockfall protection nets have several problems to actual field application in the aspect of shock absorption, lack of pullout bearing capacities, and net damages. Because of the recognition, authors have tried to develop a new rockfall protection system consisted of shock absorption parts and hexagonal net configuration. In the previous research by the authors, the performance of the newly developed rockfall protection system has been investigated through the laboratory tests and the full-scale testing. In this study, subsequently, numerical analysis program is organized to make a confirmation of the structural stability and performance. For the correct design procedure of the hexagonal net system, it is essential to understand the various mechanical behavior of the entire system. It is also important to be reproduced the systematic characteristics of the system acquired by laboratory and full-scale testing by numerical analysis in order to carry out the numerical experiment to understand various mechanical behavior of the system. As a conclusion, the hexagonal net has better performance in mechanical and physical behavior compared with that of the rectangular net. Furthermore, due to the hexagonal net shows a good performance in aspect of the load distribution, it gives a good alternative in long-term management of the rockfall protection net.
Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.