• 제목/요약/키워드: Rock reinforcement

검색결과 282건 처리시간 0.021초

개량 강관네일링 공법을 이용한 사면 보강사례 연구 (A Case Study on the Slope Reinforcement by Improved Steel Pipe Nailing)

  • 최동남;임희대;송영수;이규환
    • 한국안전학회지
    • /
    • 제22권1호
    • /
    • pp.54-60
    • /
    • 2007
  • This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.

록볼트 점소성 거동에 의한 지보효과 분석 - 수치해석 (Reinforcement Effect of Viscoplastic Rockboft - Numerical Study)

  • 조태진;이정인
    • 지질공학
    • /
    • 제3권3호
    • /
    • pp.215-230
    • /
    • 1993
  • 암반은 지질학적 속성에 따라 다양한 형태의 구조적 특징을 나타내며, 특히 암반 내부에 발달되어 있는 절리계의 공간적, 역학적 특성은 외부응력 변화에 대한 전체 암반의 거동 및 파괴 강도 등에 중대한 영향을 끼치고 있다. 본 연구에서는 절리가 발달되어 있는 암반의 점소성 거동(viscoplastic behavior)을 연속체적 개념으로 분석할 수 있는 능력을 또한 암반구조물 보강에 일반적으로 사용되는 록볼트의 점소성 거동을 분석할 수 있는 능력을 추가시켜, 록볼트 지보효과가 고려된 절리암반의 점소성 거동에 대한 수치해석 모델을 완성하였다. 절리암반 및 록볼트의 점소성 거동에 대한 연속체 모델의 정확도 및 신뢰도는 예제적 모델분석을 수행하여 입증하였다. 실제적 암반구조물 거동분석에 대한 활용성을 고찰하기 위하여 현재 굴착이 진행되고 있는 지하 원유비축공동의 시간적 거동을 분석하여 현장 계측결과와 비교하였으며, 록볼트 설치비율에 따른 지보효과를 산출하였다.

  • PDF

경남지역 절취사면의 현황분석에 관한 연구 (A Study on the Status Analysis of Cut Slope in Gyeongnam Region)

  • 박진규;박춘식;장정욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.862-869
    • /
    • 2005
  • This study examined 233 cut slopes in Gyeongnam region; evaluated hazards and slope conditions involved in the slope; and determined the priority order for reinforcement. The conclusions are summarized in the following. (1) The slopes that need reinforcement or maintenance are 153, accounting for 65.6% of the entire slopes. Slopes with a length of $0{\sim}200m$ account for 70.9%; slopes with a height of $10{\sim}20m$ account for over 50%. (2) Slopes with slope of more than 1:0.5 account for 70.9% of the entire slopes. The steepness of the slope is owing to more rock slopes than soil slopes. (3) The percentages of rock slopes, soil slopes, complex slopes mixed with rocks and soil, and slopes comprised of igneous rocks are 54.4%, 24.9%, 20.7%, and 54.1%, respectively. (4) In the rock area occurred cave-in, plain failure, wedge failure, and overturning failure, in order. Slopes with volcanic rocks are the most unstable, while sedimentary rocks and metamorphic rocks are relatively stable. (5) When the slope height is over 20m, low grade slopes are more than 80%; leading to the conclusion that the higher the slope height is, the more unstable the slope is.

  • PDF

FRP를 이용한 사면보강 (The Slope Reinforcement by use of FRP)

  • 이상덕;권오엽;최용기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 사면안정 학술발표회
    • /
    • pp.155-180
    • /
    • 2000
  • The pattern of domestic slope construction has been steadily changed from the simpled and small-scale to the large-scale and complicated one, frequently near the existing structures, as the density of population and the traffic increases. In some cases, the slopes become steeper and larger due to the road improvement and construction. For the rock slope, the existence of discontinuity cannot be disregarded and acts as an important factor on the slope stability. Most of the existing methods for stabilizing the slope were focused on reducing the slope angle. Under the specific geographic condition, it is necessary to concentrate more efforts on the research and development of supporting system for the slope stability. As a supporting system, it is often very advantageous to use the FRP pipe grouting method that is similar to the existing soil nailing method or the rock bolting method but uses the high strength FRP pipe as a principal reinforcement in place of steel bar. Through the FRP pipe, the grout material can be injected into the rock mass to improve its shear strength to the required value. .In this study, the characteristics of FRP are investigated by the laboratory tests and the field tests. And, the practical aspects of FRP method are reviewed and analyzed.

  • PDF

Probabilistic analysis of anisotropic rock slope with reinforcement measures

  • Zoran Berisavljevic;Dusan Berisavljevic;Milos Marjanovic;Svetlana Melentijevic
    • Geomechanics and Engineering
    • /
    • 제34권3호
    • /
    • pp.285-301
    • /
    • 2023
  • During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the strength of discontinuities and anchor bond strength by applying different optimization techniques for finding the critical failure surface. Even though the deterministic safety factor value is close to unity, the probability of failure is governed by variability of shear strength of anisotropic planes and optimization method used for locating the critical sliding surface. The Cuckoo search technique produces higher failure probabilities compared to the others. Depending on the assigned statistical distribution of input parameters, various performance functions of the factor of safety are obtained. The probability of failure is insensitive to the variation of bond strength. Different sampling techniques should yield similar results considering that the sufficient number of safety factor evaluations is chosen to achieve converged solution.

지하 채굴적이 지표 구조물의 안정성에 미치는 영향에 관한 모형실험 연구 (A Study on the Effect of Underground Openings on the Stability of Surface Structures Using Scaled Model Tests)

  • 김종우;전석원;서영호
    • 터널과지하공간
    • /
    • 제14권1호
    • /
    • pp.43-53
    • /
    • 2004
  • 본 연구에서는 지하 채굴적이 상부 지표 구조물의 안정성에 미치는 영향을 검토하기 위하여, 지하 채굴적의 심도와 보강 조건을 달리하는 네 가지의 경우에 대해 축소모형실험을 실시하였다. 이를 위해 실험목적에 부합한 모형 실험장치를 제작하였으며, 모형재료는 석고, 모래, 물의 혼합물을 사용하였다. 채굴적의 심도가 깊은 모형의 균열 개시압력은 얕은 모형에 비해 2.5배 더 크게 나타나 채굴적이 깊을수록 지반의 안정성은 우수하였다. 구조물의 하부 지반을 그라우팅으로 보강한 모형은 무보강 모형에 비해 균열 개시압력이 2.4배 커져, 보강을 실시하면 지반 안정성이 증가하는 것으로 나타났다. 또한, 대규모 보강을 실시한 경우는 소규모 보강에 비하여 최대 침하량이 작을 뿐 아니라 침하곡선이 완만하여 경사와 곡률도 작아지므로 지반 안정성은 보다 더 커질 것으로 판단된다.

지하공동 상부지층 보강효과에 관한 연구 (A Study on the Upper Ground Reinforcement Effect in Underground Cavern)

  • 김기호;임종세;장원일
    • 터널과지하공간
    • /
    • 제25권3호
    • /
    • pp.275-283
    • /
    • 2015
  • 연약지반에서 지하 공동의 굴착은 지반침하로 인하여 인근 지반 및 구조물에 영향을 끼치게 되고 그 결과 도로 및 시설물의 안정성에 심각한 위험요소로 작용하고 있다. 따라서 구조물의 안정 및 지반보강을 위하여 여러 가지 공법과 주입재료들을 사용하고 있다. 본 연구에서는 실내 모형실험을 실시하여 연약지반에서 다양한 종류의 지하공동 굴착 시 상부 지반보강에 따른 지반침하량을 비교 분석하였으며 3차원 유한차분법에 근거한 FLAC 3D를 사용하여 지하공동 굴착에 따른 지반 침하를 수치적으로 모사했다. 모형실험에서의 결괏값과 수치해석의 결괏값이 비교적 일치하는 결과를 토대로 수치해석상에서 보강범위를 달리하여 지반 침하량을 비교 분석하였으며, 그 결과 다양한 종류의 지하공동을 굴착함에 따른 지반침하 발생 여부 및 침하량 산정을 3차원 수치해석을 통해 보다 정확하게 구현할 수 있으며, 본 연구 결과는 지반침하 방지공법의 자료로 이용될 수 있을 것으로 사료된다.

해저터널에서의 그라우팅 보강을 위한 안정성 연구 (A study on the stability analysis for grouting reinforcement in a subsea tunnel)

  • 유광호;김은혜
    • 한국터널지하공간학회 논문집
    • /
    • 제12권2호
    • /
    • pp.145-155
    • /
    • 2010
  • 최근 국내에서는 해저터널에 대한 관심이 늘고 있고, 실제 해저터널의 건설아 진행되고 있다. 이러한 해저터널의 안정성을 위해서는 차수 및 보강을 위해 그라우팅이 필수적이다. 따라서 본 연구에서는 해저 심부에 위치한 터널을 대상으로 그라우팅 보장이 터널의 안정성에 미치는 영향을 살펴보았다. 이를 위해 1, 3, 5 등급 암반을 대상으로 그라우팅 보강영역, 암반등급, 숏크리트 두께, 측압계수, 그라우팅 두께, 펌핑의 유무를 달리하여 민감도 분석을 위한 수리-역학적 연계해석을 수행하였다. 수치해석을 위해 FLAC-2D ver 5.0을 사용하였다. 해저터널의 그라우팅 보강 설계를 수행할 경우에는 그라우팅의 강도증가 효과뿐만 아니라 그라우팅 차수로 인해 증가되는 수압의 효과도 같이 고려해야 할 것으로 판단된다.

절리암반에서 근접 사면굴착에 의한 하중전이특성에 대한 실험적 연구 (Experimental Study on Load Transfer Characteristic by Adjacent Slope Excavation in a Jointed Rock Mass)

  • 이진욱;이상덕
    • 한국철도학회논문집
    • /
    • 제12권2호
    • /
    • pp.321-328
    • /
    • 2009
  • 기존 터널에 근접하여 절리암반 굴착시 사면의 적절한 보강방법 및 시기는 굴착사면과 터널과의 근접도, 굴착사면 경사는 물론 절리상황에 의해 영향을 받자만 현재까지는 경험적으로 결정되고 있다. 본 연구에서는 터널에 근접하여 절리암반 지반을 굴착시 굴착단계에 따른 굴착사변에서의 하중전이 특성과 터널거동과의 상관관계를 분석하기 위하여 절리각도와 굴착사면 경사를 영향인자로 한 대형 모형시험을 실시하였다. 시험결과, 터널변형은 터널 천정부 또는 바닥부에 근접한 절리면 굴착시 가장 크게 발생을 하였으며, 사면과 터널의 안정성은 굴착사면의 경사와 관련하여 굴착단계에 따라 변화하였다. 향후 본 연구결과를 활용하여 절리암반에서의 터널과 사면의 보강방안을 도출하고자 한다.

지반 보강과 배수를 위한 이중기능 록볼트 성능 검증에 관한 연구 (Study on performance verification of dual-purpose rockbolt for reinforcement and drainage)

  • 정영훈;김두래;김경철;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제20권5호
    • /
    • pp.869-886
    • /
    • 2018
  • 록볼트는 지하굴착 중 불연속 암반을 보강하기 위하여 흔히 사용하는 대표적인 지보재 중의 하나이다. 용수가 많은 현장에서는 굴착 시공성을 개선하고 록볼트의 정착효과를 증진하기 위하여 별도의 Drain pipe 설치하게 된다. Drain pipe는 배수경로를 제공하여 작업성 개선에 효과적이지만 지반보강효과를 기대하기 어렵고, 다수 설치 시 불연속 암반의 교란을 증가시키며, 공사비 증가 요인이 된다. 이러한 문제를 개선하기 위하여 암반의 보강과 배수를 겸한 Dual purpose rockbolt (DPR)를 개발하였다. DPR은 신속하고, 경제적으로 암반의 역학적 수리적 안정성을 개선할 수 있었다. FRP (유리섬유 보강 플라스틱)와 steel을 이용한 2가지 DPR을 개발하여 역학적 수리적 성능을 검토하였고, 시공성과 안정성을 분석하였다.