Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.629-634
/
2000
Rockfall protection fence which is used for mitigation of rockfall hazard, has been constructed without consideration of lithology, height and dip angle of rock slope. However, those factors should be considered for the construction of the protection fence. In addition, the protection fence should be evaluated its performance by in-situ test in order to utilize the fence effectively. This is the first full sized rockfall test in Korea. For this test, the rock cut slope whose height is about 20 m and dip angle is 65 $^{\circ}$ has been chosen. Based on the preliminary simulation procedure, four different concrete balls (0.5 ton, 1.0 ton, 2.0 ton and 5.0 ton) were prepared and four different types of protection fence were constructed. The results of this test will be utilized in the establishment of rockfall protection fence construction manual.
Proceedings of the Korean Geotechical Society Conference
/
2008.10a
/
pp.910-920
/
2008
In Korea, more than 70% of the territory consists of mountains. Therefore, the construction of roads and railways has generally involved with a steep rock slope in which the event of rockfalls are often occurred due to the weathered rock conditions and rainfalls etc. This is dangerous when the rock falls into the road and railway on which vehicles and trains are running. In order to prevent such rockfalls, the rockfall protection fence consisting of post, wire rope, and PVC coating steel net has most used at the bottom of rock slopes. In a general practice, an absorbing rockfall energy, 50kJ is specified by the Ministry of Construction and Transportation. However, questions still remain about whether the rockfall protection fence works effectively or not. In this study, a typical wire rope used in the standard rockfall protection fence was replaced by the high carbon steel wire rod and to validate its capacity of rockfall energy absorbing the field rockfall tests were conducted. The testing results show that a new rockfall protection fence using the high carbon steel wire rods can absorb the rockfall energy more than 50kJ and 20% of construction cost was saved in comparison with the previous rockfall protection fence.
The rockfall protection fence installed to secure safety against rockfall occurring in cut slope has been designed under the condition with 50kJ of impact energy arising when the 400kg of rock block is falling from 12.5m height. However, in falling case of bigger rock block or from higher place, it is hard to be secure of safety with existing rockfall protection fence. Using the rockfall program, safety analysis for rockfall is conducted in this paper by changing slope height, separating distance from fence, and slope angle, according to rock block sizes. In the result of analysis, when a 400kg of rock block which is designed load is fallen, the existing rockfall protection fence with 2.5m height can secure most of rock fall except some cases for the slope having 20m or less hight, whereas for more than 20m height, the fallen rock is frequently splattered over the rockfall protection fence, as well as the impact energy of rockfall may exceed designed impact energy. Therefore, in the design of rock fence, it is considered appropriate to design that after conducting safety review for rockfall according to the ground conditions, evaluating the bounce height and impact energy of rock fall, and then installing appropriate rockfall protection fence would be applicable rather than just following standards based design drawing.
Designs for rockfall protection systems must consider rock and soil types, the angle of the slope, conditions on top and the toe of the affected area. Rockfall protection fence is installed to block for falling rock from cut slopes and this is one of the most common rockfall protection measures. The capability of the fence is provided that sum of capability of poly vinyl chloride coated wire mesh, steel support and wire rope respectively. But in some case, the rockfall protection fence was not supported rockfall energy less than total capability of the fence through the full scale rockfall tests. Therefore, the objectives of this paper are to indicate the problems of fence capability and to improve the design specifications for the fence.
Rockfall protection fences are used for diminishing rockfall damage in roads side slopes. In order to install the fences in effective way, the conditions of rock slopes and total predicted impact energy of fa11ing rock should be considered. However, the fences have been constructed without any consideration for lithology, height and slope angle of rock slope in Korea. In addition, the information about the performance of the protection fences, which should be evaluated by in-situ test or laboratory test in order to check out the practical use in the field, is not available. Therefore, in design manual for the rockfall protection fence, the specific details for the installation of this type of fence are not provided yet. The full sized rockfall in situ test was carried out for the calculation of falling energy of rock and the evaluation of the maximum energy absorbing capacity of fence. For this test, the rock slopes whose heights are about 20 m and dip angle of 65 degree, have been chosen. This is because those geometries are mean height and slope angle of most road cut slopes along Korean national highway. Based on the preliminary simulation procedure, four different sizes of concrete ball (0.7, 1.3, 2.3 and 4.3 ton) were prepared and flour different types of protection fence were constructed. The results of this test provide information about the maximum energy absorbing capacity of the fence, kinetic energy of rockfall and restitution coefficient, and these results can be utilized in the establishment of rockfall fence design and construction manual.
The performance criteria of rockfall protection fence and reliability index were investigated considering characteristic of rockfall energy occurred at 160 cut slopes in national highway. As a result of study on statistic of variables that decide rockfall energy using Monte-Carlo simulation, the degree of slope was normal distribution type, mass of rockfall and height of slope was lognormal distribution type. The rockfall energy follows lognormal distribution because of statistical characteristic of mass of rockfall. The reliability index of rockfall protection fence was 0.678 and the failure probability of was very high as 24.9%. Proposed performance criteria of rockfall protection fence considering the scale of domestic rockfall energy is maximum 500 kJ and the range of reliability index was from 1.028 to 1.956. the failure probability of rockfall protection fence was from 14.8 to 2.5 percent if applying the performance criteria using the reliability index.
Proceedings of the Korean Geotechical Society Conference
/
2002.03a
/
pp.523-530
/
2002
Recently, while rockfall occurs very frequently, a lot of researches on the rockfall protection fence Is in process. But the rockfall protection fence has been installed unrelated to slope characteristics, rockfall shape and rockfall height. Therefore, in this study we suggested the effective protection fence model considering about rockfall energy and energy absorbing capacity and we verified the model by field test. According to these results, it is more reasonable to evaluate rockfall energy based on the results of simulation program, which can be consider effects of energy decrease, than use the simplified method proposed by Japanese road association. And rockfall energy is affected by the size of supports and wire rope and the space of supports. As the results of comparing rockfall energy with energy absorbing capacity, type$\circled1$(the space of supports is changed to 3.0m)can be available for generally expected rockfall except the rock slope over 30m heights. But rockfall protection fence installed at the field, it should be partially reinforced after consideration of slope particularities and construction conditions.
In this study, a field test was conducted to present a test method for performance evaluation of a rock fall prevention fence, centering on the vertical drop test among the existing test methods of the rock fall prevention fence. A test to determine the support capacity of a rockfall prevention fence in Korea is usually conducted using a combination of wire mesh, poles, and wire rope, and the location of the impact of falling rocks has been conducted centered on the center of the wire mesh. However, in the case of domestic papers and test data, there is no data on direct hit of post. Therefore, the amount of displacement and weak section were analyzed when the impact on 100kJ class rock energy was hit on the post, centering on the Rockfall Protection fence (highway type No. 2).
In this study a test was conducted to identify weak section using 100kJ class rock energy to find out the protection performance of rockfall prevention fences in Korea. Performance rating of the rockfall protection fences is very low (48~61kJ) compared to that of foreign countries and it is necessary to determine whether it can function properly if high rock energy is generated. Furthermore, a reinforcing technology that can improve to 100kJ energy on the existing rockfall protection fences should be developed. Therefore, this study confirmed the protection performance using 100kJ rock energy in the existing rockfall protection fence system (for national road, for highway) and identified weak section of post, wire ropes and nets. Furthermore, it will be used as basic data for developing 100kJ class reinforcement technology without dismantling the existing rockfall protection fence (48-61kJ).
Kim, Hee Su;Hwang, Youngcheol;Jang, Hyun-Ick;Ban, Hoki
Journal of the Korean GEO-environmental Society
/
v.20
no.12
/
pp.57-64
/
2019
A man-made slope has been increased due to the construction of road. This slope lies at risk of rock falling, induced mostly by heavy rainfall. The MOLIT (Ministry of Land, Infrastructure and Transport) recommends the specific dimension of rockfall protection fence (post, wire-rope, and mesh) which should resist 48~61 kJ. However, the energy absorption capacity of each component of rockfall protection fence is not clearly presented. Hence, this study made an effort to compute the energy absorption capacity of each component in analytical and numerical method, and compared with each other.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.