• Title/Summary/Keyword: Rock coring

Search Result 16, Processing Time 0.022 seconds

(A study failure-strength characteristics of soil layer contained Corestone) (핵석을 포함하는 토층의 파괴강도 특성연구)

  • 이수곤;금동헌
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.711-716
    • /
    • 2002
  • When judging the ground by core-logging, depth of coring might be stopped by coming into view of the moderately weathered rock and also considered as bedrock line. However, highly weathered rock may appear again, if coring more, because there are core-stones in the residual soil and highly weathered rock by the effect of hydraulic-thermal differentiation and does the irregular rock weathering or metamorphic rock region. Therefore, there are room for misunderstanding of diagnosing the moderately weathered rock. Even though the irregular ground where the corestones were come out will show clear geotechnical differences between the ground and the gradually weathered bedrock, nowadays, the construction sites do not take into account the characteristic of core-stone region. In conclusion, to study the failure-strength characteristics of soil layers containing core-stones, we made artificial core-stones and varied percentage of corestones, and measured cohesion and friction factors to adjust them to construction sites containing corestones such as slope, tunnel, and underground.

  • PDF

A Development and Utilization of Geotechnical Information System(GTIS) of the Rock Mass in A Seoul Metropolitan Area(1) (서울일대 암반을 대상으로 한 Geotechnical Information System(GTIS)의 개발 및 활용(1))

  • 김정엽;전효택;박형동
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.336-346
    • /
    • 1995
  • Geotechnical Information System (GTIS) for efficient management of three dimensional borehole data has been developed. Some problems were raised during the input process of borehole data, and alternative solutions were sought. According to the previous geotechnical reports, there is no unified weathering classification scheme. A criterion, 100 times/30cm from SPT, was turned out inappropriate to the discrimination of weathered rock from weathered soil. It has also been suggested that weathered soil, weathered rock, soft rock, and hard rock should be defined as CW, HW, MW, and SW~fresh condition. For better comparison of RQD, the use of NX size coring is recommended for the whole area although BX size coring has been used in excavated area. The limit of drilling depth up to 1 m from the top of surface of hard rock should be extended to avoid possible wrong interpretation of rock head due to the existence of corestone. The input data were analysed by geostatistical methods. It is found that the range in semivariogram is about 300m, and the variance of gneiss is greater than that of granite. It is because the granite data analysed came from almost single uniform rock mass(i.e.Seoul granite), but gneiss data came from the rock mass(i.e. Gyeonggi gneiss complex experienced several metamorphic metamorphic processes.

  • PDF

Applicability of over-coring technique to loaded RC columns

  • Campione, Giuseppe;Minafo, Giovanni
    • Structural Engineering and Mechanics
    • /
    • v.51 no.1
    • /
    • pp.181-197
    • /
    • 2014
  • Stress determination is a very important step in the assessment of the safety of existing reinforced concrete structures. In rock mechanic this goal is achieved with the over-coring technique. The main idea behind such a technique is to isolate a material sample from the stress field in the surrounding mass and monitor its re-equilibrium deformation response. If the materials remains elastic, and elastic properties are known, stresses may be obtained from the corresponding measured strains. The goal of this paper is to evaluate if the over-coring technique is applicable to reinforced concrete members. The results of an experimental investigation on the behaviour of compressed concrete columns subjected to the over-coring technique are presented. Considerations about the range of applicability of the technique are made by comparing the measured and the theoretical stresses. After that, results of failure tests on drilled specimens are presented and discussed. Furthermore, the response is compared with that of columns core-bored before the compressive test. Finally, comparisons with numerical analysis are shown.

The 2nd Ulleung Basin Gas Hydrate Drilling Expedition (UBGH2) (울릉분지 가스 하이드레이트 2차 시추)

  • Ryu, Byong-Jae;Lee, Sung-Rock;Yoo, Dong-Geun;Kim, Gil-Young;Chun, Jong-Hwa;Bahk, Jang-Jun;Kim, Ji-Hoon;Lee, Joo-Yong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.147.1-147.1
    • /
    • 2011
  • 지식경제부 가스 하이드레이트 개발사업의 일환으로 동해 울릉분지 가스 하이드레이트 2차 시추(Ulleung Basin Gas Hydrate Drilling Expedition: UBGH2)가 2010년 7월 8일부터 9월 30일까지 D/V Fugro Synergy를 이용하여 수행되었다. UBGH2 수행을 위해 선정된 13개 site에서 약 1개월 동안 Schlumberger사의 장비를 이용 Logging-While-Drilling/Measurement-While-Drilling(LWD/MWD) 자료를 취득하였다. LWD/MWD 자료는 선상에서 분석되었으며, 이 결과는 coring 및 borehole plan 수립을 위하여 활용되었다. Coring Phase 동안 10개 site의 18개 hole로부터 퇴적물 코어 시료를 채취하고 선상에서 퇴적학, 지구화학, 생지화학, 물리적 특성 등 각종 분석과 측정 작업을 수행하였다. 약 2개월에 걸쳐 수행된 coring phase 동안에 2개 site에서 FAOL(Fugro Alluvial Offshore Limited)사의 장비를 이용 Wireline Logging/Vertical Seismic Profile(WL/VSP) 자료도 취득하였다. LWD/MWD phase와 coring phase 동안 12개 site에서 무인잠수정(remotely operated vehicle: ROV)를 이용하여 퇴적물 시료 채취, 해저면 관찰, 용존메탄 측정 등의 작업을 수행하였으며, 선상에서 취득된 이들 자료를 분석하였다. Coring을 수행한 모든 site에서 가스 하이드레이트 부존을 확인하였으며, 다양한 산상의 가스 하이드레이트 실물을 회수하고 분석하였다.

  • PDF

Case Study on In-situ Stress Measurement by Over-coring and Its Application to Design of a Pumped Storage Power Plant (오버코어링법에 의한 초기지압측정 및 양수발전소 설계적용사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Lee, Young-Nam
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.90-101
    • /
    • 2007
  • With increasing development of underground space, underground pumped storage power plants, which generate power by felling water in upper reservoir to lower reservoir, have been continuously constructed. For efficient and safe design, construction and maintenance or such power plants, it is very important to understand in-situ stress and the mechanical properties of the surrounding rock mass at the design stage. The power plant presented in this paper is under construction at a depth of $320{\sim}375m$. For stability evaluation of the structure, in-situ stress was measured by over-coring method. Also pressurementer test and a series or laboratory tests were performed to obtain the mechanical properties. Numerical analyses were conducted to check the efficiency of designed support patterns. The results showed that unstable areas occurred partly in the numerical model, and therefore supports were additionally applied. Finally complete stability was obtained and the following excavation has been operated successfully until now.

A Study on the Temperature Distribution of Rock Mass at KAERI Underground Research Tunnel: Verification on the Result of Borehole Heater Test (지하처분연구시설(KURT) 내 암반의 온도 분포에 관한 연구 : 시추공히터시험 결과의 검증)

  • Yoon, Chan-Hoon;Choi, Young-Chul;Kwon, Sang-Ki;Choi, Heui-Joo
    • Tunnel and Underground Space
    • /
    • v.23 no.4
    • /
    • pp.297-307
    • /
    • 2013
  • In this study, the thermal analysis is carried out for a result of borehole heater test using ABAQUS ver 6.10 based on finite element analysis code. Thermal-mechanical rock properties as determined by laboratory tests before the in situ test and characteristics of the atmosphere at the test section are used as the initial condition. When comparing the results of the in situ test and thermal analysis, the temperature of C3 observation hole that is 0.9 m away from the heater showed very similar patterns and figures (about $1.3^{\circ}C$ difference). But the results of the A and B observation hole showed a significant difference around $15^{\circ}C{\sim}20^{\circ}C$. To find the reason for these results, the over-coring is carried out for the A1 and B1 observation holes. As a result of checking the excavated rock core with the naked eye, there is no problem on the number and position of the sensor as the test plan. However the state of cement injection in the observation hole is poor.

Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment (선진시추장비와 시추공벽 영상화 장비를 이용한 TBM 전방 지반평가시스템 개발)

  • Kim, Ki-Seog;Kim, Jong-Hoon;Jeong, Lae-Chul;Lee, In-Mo;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.393-401
    • /
    • 2015
  • In the construction of a TBM tunnel, it is very important to acquire accurate information of the excavated rock mass for an efficient and safe work. In this study, we developed the prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment to predict rock mass conditions of the tunnel face ahead. The prediction system consists of the probe drilling equipment, drilled hole imaging equipment and analysis software. The probe drilling equipment has been developed to be applicable to both non-coring and coring. Also the probe drilling equipment can obtain the drilling parameters such as feed pressure, torque pressure, rotation speed, drilling speed and so on. The drilling index is converted to the drilling index RMR through the correlation between a drilling index and core RMR. The developed system verification was carried out through a slope and tunnel field application. From the field application result, the non-coring is four times faster than a coring and the drilling index RMR and core RMR are similar in the distribution range. This system is expected to predict the rock mass conditions of the TBM tunnel face ahead very quickly and efficiently.

Case Study on the Vertical Capacity of the Repaired Large Diameter Rock-Socketed Stool Pipe Pile (보수된 대구경 암반 소켈강관말뚝의 연직지지력에 관한 사례연구)

  • 최용규;김승종;김병희;이광욱;김상일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.185-192
    • /
    • 1999
  • It had found that, as a result of cross-hole tonic logging test, concrete was not filled partially within the bottom 2.0 m of the large diameter (Ø= 2,500mm) rock socketed pile, MP20-P11(socket diameter (Ø= 2,200mm), which was a pile among piles group supporting a pier of Kwangan Grand Bridge. The pile was repaired by the combined cement grout injected through the pipes for the cross-hole sonic logging test and the bore holes for core samples. A month after the cement grouting, repairing was checked by coring and cross-hole sonic logging then 3 times of grouting and 2 times of coring were, in turns, peformed, then repairing was completed successfully. The vertical compressive capacity of the repaired large diameter socketed pile was evaluated by several formulas and software ROCKET, and was more conservative than design load (1,882 ton) of MP20-P11. It is expected that, in the case of the battered socketed piles, it could be more reasonable to analyze the behaviors of a battered pile using 3-D model. A 3-D analysis will be peformed in the future study.

  • PDF

Study on the Prediction of the Occurrence and Distribution of the Microcracks in Rock (암석의 미세균열의 발달과 분포의 예측방법에 관한 연구)

  • 백환조;김덕현;최성범
    • Tunnel and Underground Space
    • /
    • v.8 no.3
    • /
    • pp.226-233
    • /
    • 1998
  • Microcracks in rock materials, whether natural or induced, provide useful information on the engineering performance of in situ rockmasses. A population of preferentially oriented microcracks has observable effects on the physical properties of a rockmass, but their effects may not be evident if the rock material is highly anisotropic due to other causes. An experimental program was undertaken to investigate the effect of rock fabrics on the physical properties of rock materials. In this study, anisotropy in the circumferential wave velocity and the direction of induced fractures under axial point loading were measured. Rock specimens (NX-size) of the leucocractic Pocheon granite were cored from rock blocks, retaining the relative directions of each specimen. Another set of specimens was prepared from the rock cores of the same meterial, obtained in the field. The master orientation line (MOL) was set to be the representative direction of the microcracks in the specimen. Variation of the circumferential wave velocity of each specimen was then measured along the core, keeping the MOL as reference. The direction of the minimum wave velocity was nearly perpendicular to the direction of the MOL. Coring of smaller-sized (EX-size), concentric specimens from the NX specimens were then followed, and axial point loading was applied. The direction of induced fractures due to axial point loading was closely related to the MOL direction, confirming the prior test result.

  • PDF

A study on the In-situ Stress Measurement of Anisotropic Rocks by Leeman Method - An Experimental and Numerical Simulation on Transversely Isotropic Rock (공벽변형법에 의한 이방성 암반의 초기응력 측정에 관한 연구 - 횡등방성 암석에 대한 실험실 모형 실험 및 수치해석)

  • 민기복;이정인;최해문
    • Tunnel and Underground Space
    • /
    • v.12 no.4
    • /
    • pp.237-247
    • /
    • 2002
  • A total of 18 stress measurements were performed in the rock and rock-like blocks in the laboratory to estimate the influence of anisotropy in rock. Full scale overcoring equipment, which consists of a coring machine and a biaxial loading system by flat jacks, was developed to simulate the in-situ rock stress condition in the laboratory By comparing the isotropic analysis with the anisotropic analysis in measuring the stress, conclusions have been drawn as to the influence of anisotropy. The maximum difference between the isotropic and the anisotropic analysis was 34% and it was shown that the stress measurement considering the anisotropy was needed. To confirm the validity of the observed data, a diagnostic analysis of stress relief curve by overcoring was conducted using the three dimensional finite difference program, FLAC 3D.