• Title/Summary/Keyword: Road facility construction

Search Result 105, Processing Time 0.023 seconds

A Study on Planning and Geometric Design of Underground Roads (지하도로 계획 및 기하구조 설계에 관한 연구)

  • Kim, Nakseok;Bae, Seongsik
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.1
    • /
    • pp.1-11
    • /
    • 2011
  • Plans of underground roads have been established, and the possibilities of underground road constructions have been growing in Korea. However, the study on characteristics of underground roads, the enactment of law, and the establishment of design criteria haven't been conducted so far, if any. Based on these backgrounds, the paper presents the basic direction on the construction method of underground roads. It also investigates the needs and characteristics of underground roads and reviews domestic and foreign examples. Major results by implementing the research are as follows: 1) when selecting the route of underground roads, the use of underground space, technical aspects, and traffic systems should be comprehensively considered; 2) the design speed of underground roads will be 10km/h above the speed limit to secure safety; 3) disaster prevention facilities should be planned to connect high traffic management system for coping with unexpected situations. Although this study has a limitation that hasn't reflected the driver's characteristics on new spaces such as underground roads, it has some significance that it suggests the major reviewing issues on the construction of underground roads, and presents the direction through the previous study.

Suitability for Subgrade Material of Weathered Granite Soils in the Gansung area of Gangwon-do (강원도 간성지역에 분포하는 화강풍화토의 도로토공 재료특성 연구)

  • Jeoung, Jae-Hyeung;Yu, Jun;Kim, Jin-Man;Kim, Seung-Hyun;Lim, Kwang-Su
    • The Journal of Engineering Geology
    • /
    • v.21 no.3
    • /
    • pp.239-246
    • /
    • 2011
  • Upon encountering weathering soil at a construction site, it may be necessary to change the design and construction plans for geotechnical structures. When weathering soil is exposed to air, the weathering process proceeds rapidly, resulting in significant damage to geotechnical structures, particle defects, and an increase in moisture sensitivity. The management of weathering-soil compaction is challenging. Because the engineering properties of weathering-soils vary regionally, it is important to report the result of research into the regional characteristics of such soils. At two locations of granite gneiss in the Gansung area of Gangwon-do, geological studies were performed at 22 and 8 sites, respectively. At each site, test samples were collected for analysis by XRD and to measure particle size, consistency, and compaction. To evaluate the suitability of the material for road subgrade, we examined the interrelationship between CBR value and the uniformity coefficient, the 200 sieve passing ratio and the aggregate ${\geq}$ 2 mm) content. We found that for the weathered granite soil, aggregate sized > 2 mm has a significant effect on the CBR value. In addition, the mixing of aggregate sized > 2 mm with sub-quality soil improves the soil condition.

Evaluation of Road Safety Audit on Existing Freeway by Empirical Bayes Method (경험적 베이즈 방법에 의한 공용중인 고속도로 교통안전진단사업의 효과평가)

  • Mun, Sung-Ra
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • Road safety audit is the preventive enhancement strategy for safety. : it gets rid of beforehand the potential factor of a traffic accident in the stage of road planning and design and it evaluates the appropriation for road geometric structure or safety facility to prevent traffic accident in the stage of operation after the construction. Since this strategy is introduced to our country in the early 2000s, various projects have been processed and it was legislated recently. And now, the evaluation of past project for its continuation is needed. Therefore, in this study the evaluation of road safety audit on existing freeway is performed. The spatial extent of this study is Yong-dong line on which the safety treatment was executed in 2005 and 2006. And, the temporal range of this study is each 2-year of before and after from 2005 and 2006. The empirical bayes method of observational evaluation studies is applied to analyze. As a result, there is an effect of improvement on most of treated sections. But there is ineffective or negligible on some sections. Compared with the detail of treatment on each section, the effect of multiple or various treatments is good for that section. On the other hand, the section on which effect doesn't appear is the result of single or unimportant treatments. Throughout these results, the concrete analysis can be performed and the countermeasures designed for the section on which effect doesn't appear. Also it is used as reference to the future plan and direction of road safety audit on existing freeway.

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

A Study on Characteristics of On-Street Parking on Local Streets (국지도로의 노상주차 특성에 관한 연구)

  • Kim, Ki-Hyuk;Lee, Sang-Inn
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.7 s.78
    • /
    • pp.33-40
    • /
    • 2004
  • This study aims to provide guidelines for the selection of on-street parking spot on local streets considering conditions of surrounding area and characteristics of traffic generation. This guideline provides the method which determine required roadway width for planning and design of local streets. It is necessary to identify factors for the location selection analysis. This research team selects 12 case study areas to investigate traffic environment on the sites for this analysis. Most of factors which influence on-street parking are found to have a qualitative data format except traffic volume and pedestrian movement data. Quantification theory II which is known to be suitable for qualitative analysis has been applied to identify the meaningful variables for dependent variable. In addition, discriminant analysis has performed to verify the correlation for each variable with hit ratio. Road width, traffic volume, street traders and their heavy packages, and illegally parked vehicle are found to be most significant factors for selection of on-street parking location. Therefore, it is necessary to consider traffic volume generated from massive residential complex and traffic volume for outside and above-mentioned factors for installation of on-street parking facility in the case of new road construction or road width widen.

Establishment of Point Cloud Location Accuracy Evaluation Facility for Car-mounted Mobile Mapping System for Mapping of High Definition Road Maps (정밀도로지도 제작을 위한 이동식차량측량시스템(MMS) 점군 위치정확도 성능평가 시설 구축)

  • Oh, Yoon Seuk;Kwon, Young Sam;Park, Il Suk;Hong, Seung Hwan;Lee, Ha Jun;Lee, Tae Kyeong;Chang, Soo Young
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.4
    • /
    • pp.383-390
    • /
    • 2020
  • Car-mounted MMS (Mobile Mapping System) is the most effective tool for mapping of high definition road maps(HD Map). The MMS is composed of various sensor combinations, and the manufacturing methods and processing software are different for each manufacturer, performance cannot be predicted only by the specifications of the parts. Therefore, it is necessary to judge whether each equipment is suitable for mapping through performance evaluation, and facilities for periodic performance evaluation. In this paper, we explained the MMS performance evaluation facilities built at the SOC Evaluation Research Center of Korea Institute of Civil Engineering and Building Technology and analyzed the conditions that the evaluation facilities should have through a literature survey and field tests.

An Empirical Study on Development of Traffic Safety Facilities for Safe Autonomous Vehicle Operation in Construction Areas (자율주행자동차의 공사구간 안전주행 지원을 위한 교통안전시설물 개발 실증 연구)

  • Jiyoon Kim;Jisoo Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.5
    • /
    • pp.163-181
    • /
    • 2023
  • Improving the detection performance of facilities corresponding to the sensors of autonomous vehicles helps driving safety. In the road and transportation field, research is being conducted to improve the detection performance of sensors by road infrastructure or facilities. As part of this on the development of autonomous driving support infrastructure, the shape of traffic cones and drums to ensure sufficient LiDAR detection performance even rainy conditions and maintain the line-of-sight guidance function in construction zones improvement effect. The principle was to increase reflection performance and ensure no significant difference in shape from existing facilities. Traffic cones were manufactured in square pyramid shapes instead of cones, and drums were manufactured in hexagonal and octagonal pillar shapes instead of cylinders. LiDAR detection data for the facility was confirmed on a clear day and with 20 mm/h and 40 mm/h rainfall. The detection performance of the square pyramid-shaped traffic cone and octagonal column-shaped drum was to the existing facility. On the other hand, deviations occurred due to repeated measurements, and significance could not be confirmed through statistical analysis. By reflecting these results, future studies will seek a form in which data can be obtained uniformly despite the diversity of measurement environments.

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

An Experimental Study on Fine Dust Emissions near Special Modified Asphalt Pavement and Conventional Asphalt Pavement (특수개질 및 일반 아스팔트 포장체 도로변의 미세먼지 발생에 대한 실험적 연구)

  • Tae-Woo Kang;Hyeok-Jung Kim
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.3
    • /
    • pp.282-288
    • /
    • 2023
  • In this study, we analyzed the amount of roadside fine dust generated from newly constructed specially modified asphalt pavement and general asphalt pavement from existing roads. We collected the 1,000 g (100 g/day) of dust samples from the roadside of the express bus terminal and commercial facility area in Chungcheongnam-do's C site at three-day intervals during the summer of 2022 and 2023. The collected samples were separated from fine dust according to size in the 75-150 ㎛ range and, were separated only from Tire and Road Wear Particles through density separation. No.1-3 are general asphalt pavement section as an existing road. Fine dust and Tire and Road Wear Particles in No.1-3 were 24.27 g, 24.36 g, 0.53 g, and 0.53 g, respectively, and the quantitative results for 2022 and 2023 were similar. On the other hand, No.4-6 are newly constructed specially modified asphalt pavement section. Fine dust decreased by 14.8 % and tire and road wear particles decreased by 29.6 % in 2023 compared to 2022 in No.4-6. In addition, according to the results of thermogravimetric analysis, Tire and road wear particles in No.1-3 are tire and road components at 30 % and 70 %, respectively. And Tire and road wear particles in No.4-6 are tire and road components at 35 % and 65 % in 2023, respectively. From these results, it was confirmed that the newly constructed specially modified asphalt pavement can be effective in reducing roadside fine dust and Tire and Road Wear Particles. However, there may be some shortcomings in conclusive research results due to limited space and sample collection period. In the future, we plan to conduct various case studies.

A Study on Technology Priorities for Green Highway (녹색도로 구현을 위한 기술 우선순위 결정에 관한 연구)

  • Lee, Yu-Hwa;Cho, Won-Bum;Kim, Se-Hwan
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.151-162
    • /
    • 2012
  • It is not surprising to hear news about irresistible natural disasters all over the world due to climate change. Korean Government has focused on developing a variety of green technologies to reduce green house gasses, in particular, carbon dioxide. This study suggested 18 technology divisions for achieving green highway technology development in six different sub-sectors considering life-cycle of roadway and surveyed 29 highway and/or transportation professionals of three institutes using AHP(Analytical Hierarchy Process) analysis to construct "Green Highway"and realize carbon emission reductions and energy use efficiency in a road sector in Korea. Expert Choice Software was used to rank 18 technology divisions weighted by two-level choices. Transport Operating Infrastructure Improvement, Roadway Policy Implementation, Green Transportation(such as Pedestrian and Bicycle) were highly ranked by respondents according to results of the AHP modeling. Among the 18 divisions, technology policy for supporting R&D investments from development to commercialization was ranked as the most significant one to be focused. Green Transportation Facility Design/Construction/Operation and Eco-Friendly Roadway Plan were followed as expected since professionals have thought that the planning/design step of the life-cycle is a starting point to reduce carbon dioxide from roads more and more. Additionally, comparing the results with the Government investment trend 2006-2011 for the roads, it can be interpreted that the Government should invest to the R&D area more widely than before to promote element and core technology development for Green Highway Construction. Above all, small and mid-sized businesses have to be invested as well as encouraged to undertake green highwayrelated objects to accomplish the divisions which ranked high.