• Title/Summary/Keyword: Road facilities

Search Result 830, Processing Time 0.026 seconds

Establishment of a Estimation Model of On-Road and Off-Road Parking Demand Based on the Total Floor Area of Buildings (건축물 연면적에 따른 노상·노외 주차수요 산정 모형 구축)

  • Je mo Nam;Young woo Lee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.2
    • /
    • pp.44-53
    • /
    • 2023
  • Recently, serious parking problems are occurring due to the difficulty of securing sufficient parking space, and it may lead to other traffic or social problems. In order to solve the parking problem in areas and districts beyond a certain range, a study on-roads and off-street parking lots reflecting regional characteristics is necessary. Therefore, this study establishing a parking demand calculation model for use as a basic study in establishing on-road and off-road characteristics. In order to conduct the study, Dong-fu, Daegu Metropolitan City was divided into dongs, and parking facilities and parking demand were investigated. The survey time was divided into daytime and nighttime on weekdays, and the types of vehicles were divided into three types: passenger car, small trucks and buses, large trucks and buses. As explanatory variables for calculating parking demand, the total floor area of buildings for each of six purposes was used, including detached houses, apartment houses, neighborhood living facilities, cultural and assembly facilities, business facilities, and sales facilities. As a result of the correlation analysis, among the six explanatory variables, the total area of neighborhood living facilities showed a significant correlation with on- and off-street parking demand. A regression analysis model was constructed using the total area of neighborhood living facilities as an explanatory variable, and statistically significant results were obtained.

Evaluation of Road Asset Value using Alternative Depreciation methods : Focusing on National Highway No.1 (대체적 감가상각기법을 활용한 도로자산의 가치 평가 : 국도 1호선을 중심으로)

  • Do, Myungsik;Park, Sunghwan;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.19-30
    • /
    • 2017
  • PURPOSES : This study proposes the road asset valuation approach using alternative depreciation methods. It has become necessary to have asset management system according to the adoption of accrual basis accounting for governmental financial reporting and the amendment of the road act. Therefore, it is very important to analyze the effect of depreciation methods on road asset value as a basic research for road asset management system. METHODS : The Ministry of Strategy and Finance (MOSF) has mainly performed road asset valuation based on Write down Replacement Cost and Straight Line depreciation method. This study suggests some appropriate asset valuation methods for road assets through case analysis using three depreciation methods: Consumption-based depreciation method, Condition-based depreciation method, and Straight Line depreciation method. A road asset valuation data of national highway route 1 (year 2014) is used to analyze the effect of three depreciation methods on the road asset value. Road assets include land and structures (pavement, bridge, and tunnel). This study mainly focuses on structures such as bridges and tunnels, because according to governmental accounting standards, land and road pavement assets do not depreciate. RESULTS : The main results of this study are as follows. Firstly, overall asset value of national highway route 1 was estimated at 6.97 trillion KRW when MOSF's method (straight-line depreciation method) is applied. Secondly, asset value was estimated at 4.85 trillion KRW on application of consumption-based depreciation method. Thirdly, asset value was estimated at 4.37 trillion KRW when condition-based depreciation method is applied. Therefore, either consumption-based or condition-based depreciation methods would be more appropriate than straight-line depreciation method if we can use the condition data of road assets including land that are available in real time. CONCLUSIONS : Since road assets such as pavements, bridges, and tunnels have various patterns of deterioration and condition monitoring period, it is necessary to consider a specific valuation method according to the condition of each road asset. Firstly, even though road pavements do not depreciate, asset valuation through condition-based depreciation method would be more appropriate when requirements for application of non-depreciation approach are not satisfied. Since bridge and tunnel facilities show various patterns of deterioration and condition monitoring period by type and condition level, consumption-based depreciation method based on deterioration model would be appropriate. Therefore, it is necessary to have a reasonable asset management system to apply condition-based depreciation method and a periodic condition investigation to manage road assets well.

Development of performance evaluation model for road and railway tunnels in use

  • Kim, Hong-Kyoon;Moon, Joon-Shik;An, Jai-Wook;Michael, E.S.
    • Geomechanics and Engineering
    • /
    • v.29 no.3
    • /
    • pp.369-376
    • /
    • 2022
  • Accurately evaluating and predicting the performance of facilities is a key task in establishing a maintenance strategy for facilities. The importance of performance evaluation is becoming more pronounced, especially when the aging of facilities requires a huge budget. In this study, performance assessment models were developed for road and railway tunnels. Delphi analysis was performed to identify sub-elements necessary to evaluate the performance of a tunnel. The relative importance of the evaluation factors was derived from the AHP analysis. The correlation analysis was performed between each assessment factor and the final result to verify the significance of the model. For the correlation analysis, the survey data measured through precision safety diagnosis in tunnels in use was applied. The cost effectiveness analysis was also conducted according to the scenarios with different composition of performance factors in order to improve the practical applicability of the evaluation model developed in this study.

A Study on the Use Scope of Lifetime Sports Facilities (생활체육시설 이용권에 관한 연구)

  • Min, Young-Gi
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.7 no.2
    • /
    • pp.73-78
    • /
    • 2007
  • Proper methods for facilities distribution are suggested by the examination of researches on facilities distribution, the analysis of the scope that facilities are used, and the consideration of facilities demand, and proper distribution and placement of facilities suitable for each stage is suggested. The theoretical examination for proper distribution and the analysis of the use scope is made. As a result. the area covers four dongs(administrative unit) within 1km. The $80{\sim}90%$ of residents who use the existing facilities are the ones living within 1km and so the zone of life in everyday life depending on walking as a means of movement is found to be expanded by the developments in transportation means and road construction. Therefore I suggested that lifetime sports facilities be established within the use scope whose radius and area are 1km and 4km2, respectively, regarding the sports facilities as a community center which can playa role of an institution of community center.

  • PDF

Improvement Plan through Investigation and Analysis of Road Signs of National Highway (일반국도 도로표지 조사 및 분석을 통한 개선방안 도출)

  • Lee, Woo-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.8
    • /
    • pp.604-609
    • /
    • 2019
  • A variety of complaints about road signs have occurred for various reasons, such as new road facilities, new road signs such as road name signs, and an increase in nearby important facilities. In addition, there are many road signs that are in violation of road sign regulations. The basic principles of road signs, the connectivity of guide names, the location suitability, and a consistent road sign guidance system have not implemented. To solve these problems, various errors were investigated on major road signs on eight national highways, including direction signs, distance signs, boundary signs, and route signs. In addition, we classified the errors on road signs by grade to give them maintenance priority. We also analyzed the error status of signs for each route and grade. Based on the data, the problems of the road signs were derived, and an improvement plan is discussed. Based on this research, more systematic installation and management of road signs through cooperation between the government and local governments could increase the efficiency of road signs, as well as provide safer and more convenient road sign guidance systems for road users.

Valuation of Road Guard System to Reduce Road-Kills (로드킬 저감을 위한 로드가드시스템의 가치 평가에 관한 연구)

  • Lee, Byung-Joo;Kim, Tae-Sik;Chung, Bong-Jo;NamGung, Moon
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.107-118
    • /
    • 2011
  • This study carries out to evaluate the value of introducing the road guard system that merges the function of a fence that induces wild animals and a grass inhibitor to an existing guard rail that acts as road safety facilities. For this purpose, we surveyed that road user's willingness-to-pay and recognition characteristics for road safety facilities using contingent valuation Method. By establishing a willingness-to-pay assumption model, the average willingness-to-pay was 5,018 won, which was higher than the average proposed amount of 3,883 won and shows that the road guard system is an appropriate alternative facility to increase road safety and reduce road kills. Therefore, it would be prudent to review the introduction of the road guard system to newly constructed roads or current roads in operation as a way of reducing road kills. In the future, the road guard system must be tested in areas that are highly susceptible to road kills after consulting with the relevant highway managing authorities to conduct a comparison study on the before and after installation effect of the road guard system to investigate its operation and the current status of road kills to clearly identify its effectiveness.

Establishment present of fish-road in Kangwondo and Study to apply fish-road is ice harbor 1-type (강원도 어도의 설치 현황 및 I형 아이스하버식 어도 적용성 연구)

  • Choi, Han-Kuy;Choi, Young-Soo;Jeon, Young-Soo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.63-71
    • /
    • 2006
  • The concerned object of the construction industry is environment. It is one of the main purposes of today's construction that human can live reasonably in nature. This study is about the fish-road connecting hydraulic structure in the river with nature. Chapter 2, starting with the general investigation about fish-road and helps comprehension for relatively general fish-road such as necessity, establishment purpose, history, study example, relating domestic law, design condition, consideration and form of fish-road. Chapter 3, containing the present condition of fish-road facilities in Gangwon-Do and thoughts of the problems and general countermeasures of existing fish-road. Chapter 4, Having Examined compatibility by amount of flowing water through hydraulic model test in the Ice harbor I-type model. chapter 5, Analyzation and arrangement to efficient establishment plan of fish-road and the result of the hydraulic model experiment to be beaconed a little in forward fish-road study. In the hydraulic model test result, when we suppose establishment of 1~3 in slope of 1/20, could know that applicable drought flow of the river is $0.06{\sim}3.0m^3/sec$ in case of Ice harbor I-type which transforming Ice harbor that was invented as studying project of the Ministry of Environment.

  • PDF

The Reinforcement Plan of Safety Management for the Small-sized Facility (소규모 시설물의 안전관리 강화방안)

  • Jung, In Su
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.111-118
    • /
    • 2014
  • While large-sized facilities (type I II) have been managed systematically after the establishment of the Special Law for Safety Management on Facility, the management of small-sized facilities is relatively poor. The small-sized facilities have been managed by The Basic Law for Disaster and Safety Management, however, it is hard to manage them systematically as related standards are not established. Therefore, this study proposed the management plans for including the facilities such as some road tunnels and utility tunnels, which have the definite manager and a high possibility to harm the public, into type I and II facilities. In addition, it proposed the reinforcement plans of safety management for small-sized and vulnerable facilities such as breast wall and cut slopes, traditional markets and pedestrian bridges, which are fundamental facilities closely related to people's life, although a budget and a man-power are not enough.

Development of Level of Service System for Road Infrastructure Asset Management (도로시설물 자산관리를 위한 서비스수준체계 개발)

  • Han, Dae Seok;Yoo, In Kyoon;Lee, Su Hyung
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.75-86
    • /
    • 2014
  • PURPOSES: The aim of this paper is developing user-oriented flexible Level Of Service (LOS) system for integrated asset management of various road facilities. It is essential to overcome limitations of general management systems which only focus on a type of assets (e.g. pavement, bridge etc.), and to serve a customizable LOS platform for smooth implementation and future improvement of the LOS considering various managerial environments of road agencies. METHODS: This study suggested a total framework of the LOS system as a process for self-development, operation and improvement of LOS system to conduct the PDCA (Plan-Do-Check-Act) in management process. In the process, we adopted user-customizable elements regarding asset definition, service index and evaluation method to match with the managerial environment of road agencies. In addition, we conducted an empirical study on the entire process of the suggested LOS system with a real road agency (Korea Express Highway) to prove applicability of the LOS system. RESULTS: From the empirical study, we confirmed that the suggested LOS system framework were suitable for development of customized LOS system. In addition, evaluation of asset conditions by LOS ratings, and quantification of vision achievement of the Korea Express Highway were successfully made. It would be the first trial in integrated management approach with LOS systems for numerous road facilities. CONCLUSIONS : It was recognized that easy application and sustainable improvement of the LOS was the most critical point in asset management. The suggested LOS system would be a powerful weapon as a managerial tool in preparing tight budget, aging infrastructures, and increased demands for more accountability both in Korea and internationally. Implementation of the LOS system needs to be expanded to the other infrastructure members to serve satisfactory level of service to taxpayers.

Empirical Study of Simple Grade Facilities Gap Utilizing Micro Simulation Analysis (Micro Simulation을 활용한 도시부 단순입체시설 분합류 구간간격에 관한 실증연구)

  • Kim, Young-Il;Rho, Jeong-Hyun;Kim, Tae-Ho;Park, Jun-Tae
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.63-72
    • /
    • 2012
  • Current analysis method drives an irrationality a road, signal operation and cause confusion of road such as weaving, bottleneck being not including main traffic flow in analysis subject. Therefore, this research develops analysis method of simple grade facilities to grasp target equipment relationship effect as virtue process to grasp effect of simple grade facilities in city and there is the purpose to apply optimum space of analysis intersection. In this paper, get at effect of simple grade facilities in urban area, as well as, develop new analysis method of simple grade facilities and adapt optimal interval of intersection point. New method of this paper reasonably estimated to optimal interval of the traffic flow(diverge area, merge area). As research result, analysis method to present in this research could clarify vague part of existing analysis method and presume reasonable result. Optimal interval of diverge and merge area with facilities was appeared more then 65m from the main line and more then 45m from the frontage road. Meaning of this paper as follow. First, the effect of simple grade facilities estimate. as consider optimal interval of simple grade facilities in urban can plan efficiently operation planning of road and signal in connection with nearby intersection. Second, new method then previous methods. planner of transportation easily access due to run parallel with existing method. Third, new method is contained through traffic volumes. the existing method did not reflect one. and this new method reduce error to the minimum. when analysis of intersection and link. Fourth, using the new method propose improvement plan with road operation and signal operation.