1 |
WSHDOT (Washington State Department of Transportation) (2012), Maintenance Accountability Process: Manual, and Field Data Collection Manual, WSHDOT, Washington, D.C.
|
2 |
Jo, Y. et al. (2009), Performance Evaluation and Quality Management of Variable Message Sign(VMS), Korea Expressway Company(In Korean).
|
3 |
Kang, H., Park, C., and Shin, J. (2009), Development of Prototype Bridge Asset Management System, Report No. 2010-08- 534.9607, Expressway & Transportation Research Institute, Hwaseong-Si(In Korean).
|
4 |
Khan, M.U. and Odoki, J.B. (2010), Establishing Optimal Pavement Maintenance Standards using the HDM-4 Model for Bangladesh, J. of Civil Engineering(IEB), Vol.38, No.1, pp.1-16
|
5 |
Kobayashi, K., Do, M., and Han, D. (2010), Estimation of Markovian transition probabilities for pavement deterioration forecasting", KSCE J. of Civil Engineering, Vol.14, No.3, pp. 341-351. DOI:10.1007/s12205-010-0343-x
과학기술학회마을
DOI
ScienceOn
|
6 |
MLTM (Ministry of Land Transport and Maritime Affairs) (2012), Guidelines for Management and Installation of Road Safe Facilities, MLTM, Sejong-Shi(In Korean).
|
7 |
Odoki, J.B. and Kerali, H.G.R. (2000), Highway Development and Management Series Vol.4 : Analytical Frame work and Model Descriptions, PIARC, La Defense Cedex.
|
8 |
Park, C., Shin, J., and Lee, B. (2008), Development of Estimation Model for Bridge Rating in Maintenance Actions, Report No.2009-10-534.9607, Expressway&Transportation Research Institute, Hwaseong-Si(In Korean).
|
9 |
PIARC (Permanent International Association of Road Congresses) (2000), Highway Development and Management Series:Vol.1-7, PIARC, La Defense Cedex.
|
10 |
Takeshi, Y. (2004), Performance Measures and Applications for Performance-based Maintenance Contracts: First year Postevaluation of Maintenance Project on D.C. Street in U.S., Pavement,Vol.39,No.4,pp.13-18(In Japanese).
|
11 |
TRB (Transportation Research Board) (2010), Highway Capacity Manual, TRB, Washington, D.C.
|
12 |
Walls III, J. and Smith, M. R. (1998), Life-cycle cost analysis in pavement design: in search of better investment decisions, FHWA-SA-98-079,FHWA(Federal Highway Administration), Washington, D.C.
|
13 |
Choi, L. et al. (2012), Highway Pavement Condition Surveyand Analysis, Korea Expressway Company, Seongnam-Si(In Korean).
|
14 |
Doran, G.T. (1981), There's a S.M.A.R.T. Way to Write Management's Goals and Objectives, Management Review,Vol.70, No.11, pp.35-36.
|
15 |
Han, D. (2011), Development of Open-source Hybrid Pavement Management System for an International Standard, A Doctoral Dissertation, Kyoto University, Japan.
|
16 |
Han, D., Do, M., Kim, S., and Kim, J. (2007), Life Cycle Cost Analysis of Pavement Maintenance Standard Considering User and Socio-environmental Cost, J.of the Korean Society of Civil Engineering, Vol.27, No.6D, pp.727-740(In Korean).
과학기술학회마을
|
17 |
Hyman, W.A. et al. (2009), NCHRP Report 389:Performance-based Contracting for Maintenance, TRB(Transportation Research Board), Washington, D.C.
|
18 |
Oh, S. et al. (2013), Development of Proper Maintenance and Management Standards for Private-financed Highways, Report No.11-1611000-002651-01, Ministry of Land, Transportation, and Maritime, Sejong-Si(In Korean).
|
19 |
Jenks, C.W. et al. (2010), NCHRP Report 677 : Development of Level of Service for the Interstate Highway System, TRB(Transportation Research Board), Washington, D.C.
|