Study on Establishing Essential Framework for Importing Asset Management System of National Road (일반국도 자산관리시스템 도입을 위한 기본체계 구축에 관한 연구)

  • Park, Hyosung;Lee, Soohyng
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.2
    • /
    • pp.320-334
    • /
    • 2014
  • The government policy had placed new construction as the kernel of the investment in the road department. This had been shifted, however, since the government's budget of the road department reached its peak in 2000, new construction had came to a downsizing phase while the maintenance increased gradually. Considering this recent trend, the necessity of a new paradigm in the road policy had came to a fore, in order to prove the justification of increase in the maintenance budget as well as successfully fulfill the user's needs in the service quality. The developed countries that had intensively constructed social infrastructure in 1950-60s are enjoying a great achievement by applying the asset management concept in coping with the deterioration of the public facilities. This research suggests the basic framework in establishing "Korean Road Asset Management System" designed to efficiently manage the national road. The main feature of this system is to absorb economic analysis course into the current pavement management system, in order to form not only long-lasting but also preventive road management policy.

The thickness of the soft soil layer and canal-side road failure: A case study in Phra Nakhon Si Ayutthaya province, Thailand

  • Salisa Chaiyaput;Taweephong Suksawat;Lindung Zalbuin Mase;Motohiro Sugiyama;Jiratchaya Ayawanna
    • Geomechanics and Engineering
    • /
    • v.35 no.5
    • /
    • pp.511-523
    • /
    • 2023
  • Canal-side roads frequently collapse due to an unexpectedly greater soft-clay thickness with a rapid drawdown situation. This causes annually increased repair and reconstruction costs. This paper aims to explore the effect of soft-clay thickness on the failure in the canal-side road in the case study of Phra Nakhon Si Ayutthaya rural road no. 1043 (AY. 1043). Before the actual construction, a field vane shear test was performed to determine the undrained shear strength and identify the thickness of the soft clay at the AY. 1043 area. After establishing the usability of AY. 1043, the resistivity survey method was used to evaluate the thickness of the soft clay layer at the failure zone. The screw driving sounding test was used to evaluate the undrained shear strength for the road structure with a medium-stiff clay layer at the failure zone for applying to the numerical model. This model was simulated to confirm the effect of soft-clay thickness on the failure of the canal-side road. The monitoring and testing results showed the tendency of rapid drawdown failure when the canal-side road was located on > 9 m thick of soft clay with a sensitivity > 4.5. The result indicates that the combination of resistivity survey and field vane shear test can be successfully used to inspect the soft-clay thickness and sensitivity before construction. The preliminary design for preventing failure or improving the stability of the canal-side road should be considered before construction under the critical thickness and sensitivity values of the soft clay.

A Case Study on the Field Investigation and Stability Analysis of the Collapsed Cut-Slope in Tunnel Portal, Danyang (단양 지역 터널입구부 붕괴절토사면 현장조사 및 안정성 해석 사례 연구)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Kim, Seung-Hee
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.401-408
    • /
    • 2009
  • Old national Road No. 59 that connects Danyang and Gagok has 35 dangerous cut slopes. It is relatively narrow and has a poor alignment. The torrential rains in 2002 and 2006 has caused numerous slope collapses, landslides and road settlements in this area. The old road's high risk level lead to the planning and construction of a new national road. During the construction of the new road in December 2006, the right side of Dugcheon Tunnel entrance has collapsed and tension cracks were observed on the district road above the tunnel. In order to determine the cause of failure, intensive field investigation and monitoring cracks were performed together with Lower Hemisphere Projection Analysis, Limit Equilibrium Analysis and Finite Difference Analysis.

A Case Study on Designs of Base Module for Modular Road System (모듈러 도로시스템 적용을 위한 지지구조 모듈의 설계사례 연구)

  • Lee, Juhyung;Baek, Duhyun;Kim, Donggyou
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.11
    • /
    • pp.47-54
    • /
    • 2013
  • This study is the basic research to develop the customized base module for modular road system. A case study was carried out on designs of base module for soft soil condition. Two types of base module was proposed; crossbeam module and crossbeam-pile module. Based on the case study, it was verified crossbeam-pile module is suitable for soft soil condition and the optimum dimension of crossbeam-pile module for modular road system constructed on soft soil was determined. For development of the optimal base modular for modular road system, it is needed in the future to build a data base about ground and roadbed of road construction sites and to classify and systemized base modules according to soil conditions through many case studies.

The development of pavement section and thickness design guidelines for rural access roads (부체도로 포장의 단면 설계 지침 개발 연구)

  • Hwang, Sung-Do;Kwon, Soo-An;Lee, Moon-Sup;Kim, Dam Ryung;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.113-126
    • /
    • 2017
  • PURPOSES : This study proposes standards for rural access road pavement section and thickness design considering existing access road construction conditions; the study also proposes a complementary policy that can be used for design convenience. METHODS : Various literature review and case studies had been performed in terms of rural access road section and thickness design, both domestically and internationally, and this was followed by domestic rural access road field surveys. KPRP and KENLAYER were used to analyze the commonalities and predict the remaining life. Data on real cost is used to select an appropriate construction method through economic analysis. RESULTS : The economic efficiency of concrete pavement ($15{\times}15$) was the highest in terms of economic efficiency of performance life and traffic volume. In the case of asphalt pavement, it is considered that the most economical method is to implement micro-surfacing method four times as a preventive maintenance method (once every 10 years and 4.5 years for asphalt concrete pavement and MS construction method, respectively). Repairable asphalt pavement is advantageous for areas where heavy vehicles are expected to pass. In the case of other general areas, it is considered economical to place concrete ($15{\times}15$) pavement. However, as analytical results on its performance life are unavailable, it is to be considered for study in the future. CONCLUSIONS : This study proposed interim design guidelines based on various domestic and international design guidelines and case studies. However, in order to develop the final design criteria applicable to the field, it is necessary to (a) estimate the bearing capacity of the lower level of the pavement at various sites, (b) estimate the daily traffic volume, (c) implement advanced low-cost pavement technologies, and (d) propose maintenance standards and techniques for long-term performance.

Design Route Analysis of Dangerous Road for Traffic Accident using GIS (GIS를 이용한 사고 위험도로의 설계노선 분석)

  • Lee, Kye-Dong;Jung, Sung-Heuk;Lee, Jae-Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.591-598
    • /
    • 2008
  • Recently, the government has improvement projects of dangerous road for the site that has very high accident rate due to bad geometric structures of the road. Although, route selecting of the road is a basic and important process, but the process of route selecting must consider the technical, safety and environment factor together. Also, the technology for the 3-dimensional terrain model can be used as an important factor in planning and designing for selecting alternative route projects. In the course of experimenting with the 3-dimensional topography generated by the combination of the digital map and drawing of route, the technology as been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This 3-dimensional digital elevation model has made it possible to make various terrain analysis base on GIS, which provides real-time virtual access to the designated construction sites for development planning and construction projects. Therefore, this study presents a reasonable plan for route selecting from some alternative routes through subjective evaluation and classify the methods linked basic design of road construction.

The Road Subsidence Status and Safety Improvement Plans (도로함몰 실태와 안전관리 개선 방안)

  • Bae, Yoon-Shin;Kim, Kyoon-Tai;Lee, Sang-Yum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.545-552
    • /
    • 2017
  • Ground subsidence can result in the formation of sinkholes, potholes, settlement of structures, and road subsidence. Road subsidence is described as the sudden collapse of the road surface into subsurface cavities caused by the loss of bearing capacity in the ground, such as the dissolution of limestone by fluid flow in the surface causing the formation of voids leading to subsidence at the surface. Road subsidence occurs about 665 times annually, and this incidence has been increasing until 2013. Damaged underground facilities, management negligence, and lowering of the ground water table have been the causes of road subsidence in Seoul. Seoul metropolitan government announced special management counter plans to relieve the anxieties and make the roads safe for passing. Construction sites, such as excavation works, need to be managed properly because they have strong potential to induce road subsidence. The aim of this study was to identify the main causes of road subsidence and suggest management plans. First, life cycle cost analysis revealed the daytime construction to be more appropriate than nighttime. In addition, by analyzing the limitations of using sand as a backfill material, it is proposed to use a flowable backfill material instead of sand. Finally, to reduce the blind spots, which is a problem in surveying the road pavement conditions of local governments, the road to be managed is divided into several zones, and a specialized agency is selected for each zone and a method of surveying the blind spots through collaboration is suggested.

A Cost-Benefit Analysis of Road Construction in International Development Cooperation Project - A Case of KOICA's Lao Cai Happiness Program in Vietnam - (국제개발협력사업의 마을도로 건설 비용편익 분석 - KOICA 베트남 라오까이 행복프로그램 적용사례 -)

  • Lee, Ah-Youn;Kong, Ki-Seo;Yoon, Seong-Soo;Song, Yang-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.137-144
    • /
    • 2018
  • The purpose of this study is to measure the cost-benefit of a road construction project in Vietnam through international development cooperation, which includes private grants and Official Development Assistance(ODA). In developing countries, it is difficult and costly to use data on markets, the CVM(Contingent Valuation Method) to measure the WTP(Willingness-to-Pay) as the benefits of road construction are used. A total of 232 villagers in 16 villages of Lao Cai Province in Northern Vietnam have been surveyed. It is found that the Benefit-Cost Ratio(B/C) in all 3 models are found to be well over 1.0, ranging from 2.8 to 3.64 with the discount rate of 0.06. These BC ratios imply the road construction project in Lao Cai can be justified. Also, it is found that the shortened travel time is the most relevant factor for WTP among direct benefits and the enhanced academic achievement of the children is the most relevant factor among indirect benefits, due to easier and faster access to schools, which in turn increase the school attendance rate. The result of this study can be used to justify other similar projects in Vietnam, even though the benefits may have to be reassessed in other countries.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.