• Title/Summary/Keyword: Road Tunnel

Search Result 590, Processing Time 0.026 seconds

An Investigation for Driving Behavior on the Exit-ramp Terminal in Urban Underground Roads Using a Driving Simulator (주행 시뮬레이터를 활용한 도심 지하도로 유출연결로 접속부 주행행태 분석)

  • Jeong, Seungwon;Song, Minsoo;Hwang, Sooncheon;Lee, Dongmin;Kwon, Wantaeg
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.123-140
    • /
    • 2022
  • Even though driving behaviors in underground roads can be significantly different from ground roads, existing underground roads follow the design guidelines of ground roads. In this context, this study investigates the driving behaviors of the exit-ramp terminal of urban underground roads using a driving simulator. Virtual driving experiments were performed by analyzing scenarios between the underground and ground road environments. The experiments' driving behavior data for each geometry section are compared and validated through a statistical significance test. This test showed that the speed in the underground road environment is relatively low, and the LPM tends to move away from the adjacent tunnel wall. Based on these findings, this study suggests implications and feasible solutions for improving driver's safety in the exit-ramp terminal of the underground roads.

A evaluation study of a fire smoke diffusion delay device installed in a great depth underground double deck tunnel (대심도 복층터널에 설치 가능한 화재연기 확산지연장치 성능 평가 연구)

  • Shin, Tae-Gyun;Moon, Jung-Joo;Yang, Yong-Won;Lee, Yun-Taek
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.225-234
    • /
    • 2018
  • Domestic urban areas are experiencing serious traffic congestion problems due to continuous population growth and increased traffic volume. In order to solve the problem of traffic congestion, the study of great depth underground double deck tunnels using underground space is being actively carried out in the urban areas. The characteristics of great depth underground double deck tunnels are low in cross section, so the spread of fire smoke is expected to spread faster than the road tunnel in case of fire. Therefore, it is necessary to provide a fire smoke delay device which delays the spread of fire smoke when a fire occurs in a tunnels. In the previous study, the diffusion effect was analyzed according to the blocking area when the fire smoke spread delay device was operated through the 3D CFD in the study of preventing the smoke spread in the case of the tunnel fire. A study on fire smoke diffusion delay device using spring elasticity which is excellent in applicability to a tunnel and economical value is studied. In this study, fire smoke spread delay system was developed to fire smoke delay was experimentally analyzed. Fire smoke delay effect of fire smoke delay device appeared. Therefore, it is considered that the can minimize the damage of the victims when installed in the great depth underground double deck tunnels.

Comparison of Safety Level between Driver's Ages by Threshold Zone Luminance Level of Vehicular Traffic Tunnel (터널 경계부 휘도수준에 따른 운전자 연령대별 안전수준 비교)

  • Cho, Won Bum;Jeong, Jun Hwa;Kim, Do Gyeong;Park, Won Il
    • International Journal of Highway Engineering
    • /
    • v.17 no.1
    • /
    • pp.129-142
    • /
    • 2015
  • PURPOSES : The purpose of this study is to suggest a basis for setting appropriate safety goals specifically related to the threshold zone luminance in a vehicular traffic tunnel. METHODS : In the test, drivers were divided into two groups. One group consisted of all drivers (average drivers) group with an age ratio of drivers holding domestic driver's license and driver group by age to produce threshold zone luminance in the tunnel. The threshold zone luminance produced as a result was used to analyze how it affects the safety level of each driver group and provide a basis for setting an appropriate safety criterion that can be used to determine threshold zone luminance. We used test equipment, test conditions, and ananalysis of threshold zone luminance identical to that reported by ChoandJung(2014) but the values of adaptation luminance in our analys is were expanded to range from100 to $10,000cd/m^2$. RESULTS : Adaptation luminance and threshold zone luminance are found to be related by a quadratic function. The threshold zone luminance needed by older drivers to ensure a certain safety level is significantly higher than that for drivers of other age brackets when adaptation luminance increases. 56% of older drivers are at an increased risk of an accident at the same luminance for which the safety level of average drivers is 75%. The safety level that can be achieved for older drivers increases to above 60% when threshold zone luminance level is set with the goal of attaining a safety level of more than 85% for average drivers. The safety level that can be attained for average drivers is above 90% when the threshold zone luminance is high enough to ensure over 75% in the safety level of older drivers. Results of this study are applicable to highways and others whose designed speed is 100 km/h. CONCLUSIONS : Threshold zone luminance determined on the basis of drivers having average visual ability is of limited value as a performance standard for ensuring the safety of older drivers. Hence, safety level for older drivers should be considered separately from safety levels for drivers with an average ability to avoid risk. Upward adjustment of older drivers' safety level in the process of determining appropriate threshold zone luminance in a vehicular traffic tunnel may bring both tangible and intangible benefit as a result of reducing accidents. However, there is an associated dollar cost arising from installing and operating lights. As a result, the economic impact of these trade-offs should also be considered.

A Study on the Effective Fire and Smoke Control in Semi-Transverse Ventilation (균일배기 환기방식에서의 배연특성에 관한 연구)

  • Jeon, Yong-Han;Kim, Jong-Yoon;Seo, Young-Ho;Yoo, Oh-Ji;Han, Sang-Pil
    • Fire Science and Engineering
    • /
    • v.24 no.1
    • /
    • pp.90-94
    • /
    • 2010
  • In this study it is intended to review the moving characteristics of smoke by performing visualization simulation for the calculation of the optimal smoke exhaust air volume in case a fire occurs in tunnels where transverse ventilation is applied, and to obtain basic data necessary for the design of smoke exhaust systems by deriving optimal smoke exhaust operational conditions under various conditions. As a result of this study, if it was assumed 0 critical velocity in the tunnel, the smoke exhaust air volume was limited within 250 meter in the road-tunnel disaster prevention indicator and the exhaust efficiency was from 55.1% to 95.8% in the result of this study. If the wind velocity is in the tunnel, the exhaust rate intends to increase rapidly and the exhaust efficiency is decreased. In addition, if the wind velocity is increased, the exhaust rate should be increased in compared with the generation rate of smoke in maximum 1.8 or 1.04 times. In this study, when the wind velocity is in the tunnel, the limited exhaust rate is $84m^3/s{\cdot}250m$. And if it was assumed 1.75 m/s critical velocity in the tunnel, the exhaust rate would be defined $393m^3/s{\cdot}250m$($Q_E$ = 80 + 5Ar).

Development and Application of Tunnel Design Automation Technology Using 3D Spatial Information : BIM-Based Design for Namhae Seomyeon - Yeosu Shindeok National Highway Construction (3D 공간정보를 활용한 터널 설계 자동화 기술 개발 및 적용 사례 : 남해 서면-여수 신덕 국도 건설공사 BIM기반 설계를 중심으로)

  • Eunji Jo;Woojin Kim;Kwangyeom Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.209-227
    • /
    • 2023
  • The government continues to announce measures to revitalize smart construction technology based on BIM for productivity innovation in the construction industry. In the design phase, the goal is design automation and optimization by converging BIM Data and other advanced technologies. Accordingly, in the basic design of the Namhae Seomyeon-Yeosu Sindeok National Road Construction Project, a domestic undersea tunnel project, BIM-based design was carried out by developing tunnel design automation technology using 3D spatial information according to the tunnel design process. In order to derive the optimal alignment, more than 10,000 alignment cases were generated in 36hr using the generative design technique and a quantitative evaluation of the objective functions defined by the designer was performed. AI-based ground classification and 3D Geo Model were established to evaluate the economic feasibility and stability of the optimal alignment. AI-based ground classification has improved its precision by performing about 30 types of ground classification per borehole, and in the case of the 3D Geo Model, its utilization can be expected in that it can accumulate ground data added during construction. In the case of 3D blasting design, the optimal charge weight was derived in 5 minutes by reviewing all security objects on the project range on Dynamo, and the design result was visualized in 3D space for intuitive and convenient construction management so that it could be used directly during construction.

Detection of Steel Ribs in Tunnel GPR Images Based on YOLO Algorithm (YOLO 알고리즘을 활용한 터널 GPR 이미지 내 강지보재 탐지)

  • Bae, Byongkyu;Ahn, Jaehun;Jung, Hyunjun;Yoo, Chang Kyoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.7
    • /
    • pp.31-37
    • /
    • 2023
  • Since tunnels are built underground, it is impossible to check visually the location and degree of deterioration of steel ribs. Therefore, in tunnel maintenance, GPR images are generally used to detect steel ribs. While research on GPR image analysis employing artificial neural networks has primarily focused on detecting underground pipes and road damage, there have been limited applications for analyzing tunnel GPR data, specifically for steel rib detection, both internationally and domestically. In this study, a one-step object detection algorithm called YOLO, based on a convolutional neural network, was utilized to automate the localization of steel ribs using GPR data. The performance of the algorithm is then analyzed. Two datasets were employed for the analysis. A dataset comprising 512 original images and another dataset consisting of 2,048 augmented images. The omission rate, which represents the ratio of undetected steel ribs to the total number of steel ribs, was 0.38% for the model using the augmented data, whereas the omission rate for the model using only the original data was 7.18%. Thus, from an automation standpoint, it is more practical to employ an augmented dataset.

Factor Analysis and LISREL Model Development for Landscape Estimation on The Road Cutting Slope Area (도로절토사면(절개면)의 경관평가를 위한 요인분석 및 LISREL 모형구축)

  • 지길용;박일동;임성빈;금기정
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • In South Korea, about 74% of total area is mountainous terrain It is therefore inevitable to make tunnel or cutting slope for road construction. According to a related survey, approximately 2,400 sites of cutting slopes were found from 24 different routes of roadway which is overall 900 km long, implying 2.7 slopes per 1km of roadway on average. Even though safety matter such as the slope failure prevention would be the most important consideration for the construction of cutting slopeslandscape of sloped face is nowadays becoming another important factor due to the growing demand for the driver-friendly road environment Various construction methods which attain this goal should therefore be considered in the design stage of the roadway. The objective of this study is to identify important factors in landscape of sloped-cut roadway using factor analysis. For this, 10 main treatment methods of sloped-cut fact were analyzed. This study employed the LISREL(structural analysis of common variance) model in order to capture the qualitative characteristics of the slope-cut road and examine the relationship between the suey error and the variable(s). As a result, more reasonable landscape evaluation model for the road design and construction was proposed.

A study on the optimization of tunnel support patterns using ANN and SVR algorithms (ANN 및 SVR 알고리즘을 활용한 최적 터널지보패턴 선정에 관한 연구)

  • Lee, Je-Kyum;Kim, YangKyun;Lee, Sean Seungwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.617-628
    • /
    • 2022
  • A ground support pattern should be designed by properly integrating various support materials in accordance with the rock mass grade when constructing a tunnel, and a technical decision must be made in this process by professionals with vast construction experiences. However, designing supports at the early stage of tunnel design, such as feasibility study or basic design, may be very challenging due to the short timeline, insufficient budget, and deficiency of field data. Meanwhile, the design of the support pattern can be performed more quickly and reliably by utilizing the machine learning technique and the accumulated design data with the rapid increase in tunnel construction in South Korea. Therefore, in this study, the design data and ground exploration data of 48 road tunnels in South Korea were inspected, and data about 19 items, including eight input items (rock type, resistivity, depth, tunnel length, safety index by tunnel length, safety index by rick index, tunnel type, tunnel area) and 11 output items (rock mass grade, two items for shotcrete, three items for rock bolt, three items for steel support, two items for concrete lining), were collected to automatically determine the rock mass class and the support pattern. Three machine learning models (S1, A1, A2) were developed using two machine learning algorithms (SVR, ANN) and organized data. As a result, the A2 model, which applied different loss functions according to the output data format, showed the best performance. This study confirms the potential of support pattern design using machine learning, and it is expected that it will be able to improve the design model by continuously using the model in the actual design, compensating for its shortcomings, and improving its usability.

A Study of Field Construction Process Analysis and Economic evaluation of Ready-mixed Shotcrete (레디믹스트 숏크리트의 현장 시공프로세스 분석 및 경제성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1322-1327
    • /
    • 2010
  • Ready-mixed shotcrete mixed with high quality materials and can be controled shotcrete quality is producted in plants and transported to construction fields, so do not need a field batch plant. In this study, the field construction system that can be applied Ready-mixed Shotcrete to construction fields was proposed, and the all-in-one silo that was the key component of the field construction system was design. It was performed to evaluate the constructability that the field construction process analysis in case of applying a field batch plant and the all-in-one silo, the cost analysis of the material production and transport in a road tunnel was also performed to evaluate the economic feasibility of Ready-mixed shotcret.

  • PDF

A Case Study Of Stability Examination About Slope Under Pier (교각 하부사면에 대한 안정성 검토 사례연구)

  • Bae, Sung-Woo;Shin, Chang-Gun;Seo, Jeong-You
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.712-721
    • /
    • 2010
  • Our country is composed of about 70% mountain district. Therefore the tunnel and the bridge are used plentifully in the road. The bridge the establishment location of the pier according to ground condition and the route is executed from various condition. this study leads and stability investigation and reinforcement instance there is a goal which presents an example about investigation.

  • PDF