Dai, Ke;Huang, Wuhao;Wen, Ya;Xie, Yuru;Kim, Jung In
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.1130-1137
/
2022
The Industry Foundation Classes (IFC) provides standardized product models for the building construction domain. However, the current IFC schema has limited representation for infrastructure. Several studies have examined the data schema for road and highway modeling, but not in a sufficiently comprehensive and robust manner to facilitate the overall integrated project delivery of road projects. Several discussions have focused on slope engineering for road projects, but no solution has been provided regarding the formalized parametric modeling up to now. Iterative design, analysis, and modification are observed during the process of slope design for road projects. The practitioners need to carry out the stability analysis to consider different road design alternatives, including horizontal, vertical, and cross-section designs. The procedure is neither formalized nor automated. Thus, there is a need to develop the formal representation of the product and process of slope analysis for road design. The objective of this research is to develop a formal representation (i.e., an IFC extension data schema) for slope analysis. It consists of comprehensive information required for slope analysis in a structured manner. The deliverable of this study contributes to both the formal representation of infrastructure development and, further, the automated process of slope design for road projects.
도로 건설 프로젝트는 대규모의 자본과 공기가 소요되는 프로젝트이다. 본 연구에서는 도로 프로젝트의 타당성분석 시스템 요소 기술 고찰과 기존의 타당성분석 자료를 통해 현행 방법의 문제점을 도출하고 이에 대한 개선 방안으로는 프로젝트별 정보축적을 통한 타당성 정보모델 구축을 제안하고자 한다. 이는 합리적 의사결정을 지원할 뿐 아니라 프로젝트 진행과정에서 발생 가능한 리스크를 초기 예측함으로서 프로젝트의 효율적 수행을 도울 것이다.
Journal of Construction Engineering and Project Management
/
제4권1호
/
pp.15-28
/
2014
Completing road construction projects within the budget and time has been a problem for the Tanzania National Roads Agency (TANROADS); and the major problem highlighted in almost all projects being inadequate design. However, the extent to which inadequate design contributes to both time and cost overruns and its causes remained under-studied. The objective of this study is therefore to determine the extent of the effect of inadequate design, its causes and remedial measures. The methodology used in this study includes reviewing recent projects completion reports, holding roundtable discussions with consultants and TANROADS officials and analyzing the information. Cost and time overruns for the reviewed projects averaged 44% and 26% respectively. Similarly, the extents to which inadequate design contributes to cost and time overruns were on average found to be 61% and 85% respectively. The overruns are predominantly related to problems that occurred during the design process. To alleviate the problem, TANROADS is advised to improve the management of design projects, enhance the process of reviewing design reports, improve the design process including introducing Road Safety Audit and geometric design manuals, and increase staff to match the work-load.
PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.
대규모로 진행되는 도로건설사업에서 비용 초과와 공기 지연이 지속적으로 발생하고 있지만 이를 사전에 관리하고 대비할 수 있는 성과평가 체계 연구는 미흡한 실정이다. 또한 긴 공기를 가진 도로건설사업은 시공과정에서 많은 요인들에 영향을 받기 때문에 도로만의 특성을 고려한 성과 평가를 실시하고, 추후 유사한 사업에 대비할 필요가 있다. 따라서 본 연구는 도로건설사업의 시공단계 성과평가 프레임워크를 개발하여 도로건설사업의 성과관리 방안을 제시하고자 한다. 본 연구는 각종 유관기관에서 도로건설사업 시공단계의 정보를 수집하고 속성정보에 따라 데이터베이스를 구축하였다. 또한 사업의 착공·준공시점 간 시간차에 대해 비용 표준화를 실시하였고, 성과평가를 위한 지표를 도출하여 분석을 실시하였다. 본 연구는 도로건설사업 시공과정의 절대적, 상대적 비용·일정 성과를 정량적으로 분석함으로써 성과평가 연구의 고도화 가능성과 신규 도로건설사업 계획 시 활용방안을 보여준다.
Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.
Journal of Construction Engineering and Project Management
/
제5권1호
/
pp.26-31
/
2015
Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.
현재 우리나라의 교통정책은 도로의 신설 확장은 지양하고, 도로의 선형 및 시설을 개량하여 안전성을 증대시키고, 친환경적이며 효율적으로 운영할 수 있는 방향으로 나아가고 있다. 이는 국가 도로사업 중 하나인 제2차 국도 5개년계획('06~'10)이 확장 53건(71%), 개량 22건(29%)인 반면, 제3차 국도 5개년계획('11~'15)은 확장 22건(30%), 개량 50건(70%)로 변화된 것으로 나타나고 있다. 이러한 시설개량위주의 도로사업을 좀 더 효과적으로 추진하기 위해서는 도로의 안전성을 객관적이고 과학적으로 판단하여 사업을 선정하고, 사업에 따른 안전성 향상에 대한 평가가 이루어져야 한다고 판단된다. 본 연구는 이러한 도로별 안전성 분석 및 평가를 위한 모형을 개발하는데 목적이 있다. 본 연구의 주요내용은 미국의 HSM (Highway Safety Manual)을 근간으로 하여 한국실정에 맞게 도로의 안전성을 분석하고 평가할 수 있는 모형을 개발하는 것이다. 모형 정립을 위한 데이터 구축은 전라북도 권역 5개 국도호선을 대상으로 기하구조 요인이 동일하다고 판단되는 구간을 동질성 구간으로 구분하였고, 구분된 1,452개 구간에 대하여 도로 기하구조, 시설물, 교통량, 기상상태, 토지이용 등의 대표값을 수집하였다. 수집된 자료는 교통사고와 각 도로요소의 상관관계 분석을 수행하여 어떠한 요인이 교통사고에 큰 영향을 미치는지 분석하였고, 이를 바탕으로 음이항회귀모형으로 사고모형을 정립하였다. 개발된 모형을 가지고 교통량과 도로구간연장을 이용하여 발생사고건수를 예측하는 안전성능함수와 도로기하구조 및 교통특성 등의 변화에 따라 사고빈도 변화를 결정하는 사고수정계수를 도출하였다.
Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.
최근 표준으로 등록된 IFC(Industry Foundation Classes)4는 건축시설의 형상요소 표현에 한정될 뿐 도로, 교량 및 터널 등의 토목시설에 대한 형상표준을 정의하고 있지 않아 여전히 토목 형상모델의 교환을 위한 상호운용성에 제약이 있다. 특히 도로시설은 중심선형에 따라 모델링되는 선형적 특성을 가지며, 프로젝트 별로 형상이 서로 상이하여 표준화된 도로정보모델을 구축하는 것이 곤란하다. 따라서 본 연구에서는 도로의 형상정보모델 개발을 위해 3차원 설계 프로세스 관점에서 도로를 구성하는 구조요소 및 속성을 도출하는 것이 목적이다. 이를 위해 본 연구는 도로설계를 위해 활용되는 도로설계편람, 지침, 시방서 및 기하설계 기준 등의 정보를 분석하여 도로 구조물의 형상 요소와 속성을 추출한다. 도출된 형상은 엔티티(Entity) 항목으로 정의하고 가상 도로모델을 통해 정의된 도로 형상모델의 위계구조를 검토한다. 도출된 도로의 세부 구조 요소 및 속성은 인프라 분야의 BIM(Building Information Modeling)환경을 구축하기 위한 3차원 형상정보로 활용되며, 도로의 구체적인 형상, 타입 및 속성을 세분화하여 도로분야의 IFC로 확장하기 위한 기초자료로 활용될 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.