• 제목/요약/키워드: River topographic maps

검색결과 36건 처리시간 0.035초

효율적인 홍수지도 구축을 위한 NGIS 수치지형도 활용에 관한 연구 (A Study on Effective Flood Map Generation using NGIS Digital Topographic Maps)

  • 송용철;권오준;김계현
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.449-454
    • /
    • 2004
  • Nowadays, flood hazard maps have been generated to minimize the loss of human lives due to flooding domestically. To generate the flood hazard maps, LiDAR data have mainly been used to provide topographic data. The LiDAR data requires, however, relatively higher cost and processing time. Therefore, the needs of validating possible use of topographic maps as an alternative source of LiDAR, which have been already existed from the NGIS project over the nation, has been raised. In this background, this study has generated a DEM over City of Kuri as a pilot study using conventional 1:1,000 and 1:5,000 topographic maps emphasizing the linkage of river profile with breakline processing algorithm to build the essential topographic data as accurate as possible. The results showed that the RMSE from topographic maps and LiDAR were 3.49 and 2.282 meter, respectively. Further study needs to be made to decide possible use of topographic maps instead of LiDAR including more easier updating of topographic maps to support flood map generation. In addition, 1:1,000 topographic mapping, which is limited to the urban areas so far, needs to be extended to the river areas.

  • PDF

NGIS 수치지형도를 이용한 효율적인 홍수범람모의용 지형자료 구축에 관한 연구 (A Study on the Generation of DEM for Flood Inundation Simulation using NGIS Digital Topographic Maps)

  • 권오준;김계현
    • 대한공간정보학회지
    • /
    • 제14권1호
    • /
    • pp.49-55
    • /
    • 2006
  • 최근 들어 국내에서는 홍수에 의한 재산과 인명피해를 최소화하기 위해 지역특성에 알맞은 홍수지도를 제작 중에 있으며, 주로 LiDAR를 이용하여 홍수지도 제작을 위한 지형자료를 구축하고 있다. 그러나 LiDAR를 이용한 구축에 많은 시간과 높은 비용이 소요되기 때문에 이미 전국적으로 NGIS(국가GIS구축사업)사업을 통하여 구축된 수치지형도를 이용한 홍수지도의 구축 가능성과 타당성에 대한 검증 필요성이 제기되고 있다. 이에 따라 본 연구에서는 NGIS 수치지형도를 이용하여 홍수범람모의용 지형자료를 구축하기 위한 방안을 제시하였다. 이를 위하여 물의 흐름에 중요한 역할을 하는 breakline을 처리하고, 동시에 하상주변의 실제지형을 나타내는 유일한 자료인 하천종횡단자료를 연계하여 홍수범람모의용 DEM을 제작하였다. 경기도 구리시를 대상으로 1:1,000과 1:5,000의 NGIS 수치지형도를 활용하여 breakline을 처리하고 하천종횡단자료를 수치지형도와 연계하여 보간법을 기반으로 DEM을 구축하였다. 구축된 DEM은 1:1,000지형도가 전체 대상지역에 존재하지 않아 일부 지역에 대하여 1:5,000 지형도를 활용함으로써 상대적으로 위치 정확도는 떨어졌으나 홍수지도의 구축에는 적합한 정확도와 데이터의 정밀도를 제시하였다. 아울러 비용경제적 측면에서 매우 높은 효율성을 제시하였다. 반면 향후 NGIS 지형도의 보다 원만한 활용을 위하여 1:1,000 지형도의 갱신이 주기적으로 이루어져야 하며, 보간법의 적용에 있어서 고려사항과 breakline 구축을 위한 기술적 고려 사항 등이 정리되어야 하는 필요성을 제기하였다.

  • PDF

하천지형 구축 방법에 따른 홍수 시 예상 침수면적 산정 (Flooding Area Estimation by Using Different River Topographic Maps)

  • 문창건;이정식;신사철;손호근
    • 한국지반환경공학회 논문집
    • /
    • 제17권9호
    • /
    • pp.21-28
    • /
    • 2016
  • 본 연구의 목적은 유역규모별 홍수침수면적을 산정하기 위한 하천지형 구축기법과 그에 따른 침수면적을 비교하는 것이다. 대상 지역은 경상북도 청도군과 의성군 내 14개소 하천이며 수치지도 DEM, ASTER DEM과 SRTM DEM을 이용하여 하천지형을 구축하였으며, HEC-GeoRAS, RAS Mapper, RiverCAD 모형을 적용하여 홍수침수해석을 수행하였다. 해석 결과와 실제 침수흔적도와 비교하였으며, 각 해석 모형들과 하천지형 구축기법에 따라 침수면적을 비교하였다. 침수흔적도와 비교한 결과 HEC-GeoRAS 모형의 결과가 이 침수흔적도의 범람면적과 대부분의 유역에서 유사한 값을 나타내었으며, SRTM DEM이 ASTER DEM보다 수치지도 DEM과 유사한 결과를 나타내었다. 중 대규모 유역의 경우 HEC-GeoRAS 모형과 Ras Mapper 모형, 소규모 유역의 경우 HEC-GeoRAS 모형과 RiverCAD 모형이 효율적인 해석 모형으로 나타났다.

지도축척의 영향에 따른 하천형태학적 특성연구 (A study on stream morphological characteristics according to effect of Map Scale)

  • 안상진;조용진
    • 한국농공학회지
    • /
    • 제23권1호
    • /
    • pp.64-74
    • /
    • 1981
  • The stream morphological characteristics of watershed have important influence upon the analysis of runoff. In this study, the effect of the map scale on the stream morphological characteristics was used on the data taken from 15'(1:50, 000) and 7'30"(1 :25,000) topographic maps which could cover the whole Miho River basin This basin are the first tributary of the Geum. River. Otherwise, the longitudinal stream bed profile was calculated by Yang's theoretical stream bed profile, equilibrium profile and actual profile. In the result of this investigation the conclusion is that the resultant relationship obtained from different topographic maps in the scale on the same stream system has come upon the same result as the stream morphological characteristics. Therefore, the great amount of time and effort can be saved in studing the stream morphological charecteristics by using the 15' instead of the 7'30"map system excluding the first order streams.

  • PDF

하천주제도 관리시스템 시범구축 (Pliot Building of the Management System for River Thematic Maps)

  • 박진혁;이근상;고덕구;김계현;김성준
    • 한국지리정보학회지
    • /
    • 제8권2호
    • /
    • pp.95-102
    • /
    • 2005
  • 현재 국가에서는 "하천관리지리정보시스템(RIMGIS: river information management geographic information system)" 및 "홍수지도제작" 등의 하천지도전산화 사업을 통하여 하천관련 GIS DB를 구축하였다. 그리고 각 기관별로 구축한 하천관련 정보들의 효율적인 관리 및 공급을 위한 주제도 제작이 요구되어 2003년도에 "하천주제도 사업계획 수립" 용역을 수행하여 하천주제도의 정의 및 데이터모델 그리고 각 주제도별 구축 프로세스를 정립하였다. 본 연구는 하천지도전산화 사업 성과물인 하천관련 DB의 활용 극대화를 위해 GIS기반의 하천주제도의 데이터모델 및 구축프로세스를 기반으로 시범유역에 대한 하천주제도를 사전에 구축하고 메타데이터 및 주제도관리시스템 등을 설계하고 전산시스템으로 구축하는 것을 주요 목적으로 한다. 이를 위해 하천주제도 구축을 위한 데이터모델을 보완 설계하였고, 하천주제도의 효율적인 관리를 위해 선행연구에서 제시한 메타데이터를 2003년 국토지리정보원의 "메타데이터 표준화 연구"에서 제시된 국가 표준 메타데이터의 항목을 기반으로 효율적인 관리와 유통을 위한 메타데이터를 보완하여 구축하였다. 또한 본 연구에서는 기 구축 데이터인 수치지형도, RIMGIS 및 WAMIS(water resources management information system의 데이터를 활용하는 방안을 분석하였으며, 정의된 구축 프로세스에 맞추어 경안천유역을 대상으로 25개의 하천주제도를 시범 작성하여 하천주제도 관리시스템을 제작하였으며, 하천주제도의 효율적인 관리를 위해 메타데이터 관리기능을 추가하여 제작하였다.

  • PDF

Development of flood hazard and risk maps in Bosnia and Herzegovina, key study of the Zujevina River

  • Emina, Hadzic;Giuseppe Tito, Aronica;Hata, Milisic;Suvada, Suvalija;Slobodanka, Kljucanin;Ammar, Saric;Suada, Sulejmanovic;Fehad, Mujic
    • Coupled systems mechanics
    • /
    • 제11권6호
    • /
    • pp.505-524
    • /
    • 2022
  • Floods represent extreme hydrological phenomena that affect populations, environment, social, political, and ecological systems. After the catastrophic floods that have hit Europe and the World in recent decades, the flood problem has become more current. At the EU level, a legal framework has been put in place with the entry into force of Directive 2007/60/EC on Flood Risk Assessment and Management (Flood Directive). Two years after the entry into force of the Floods Directive, Bosnia and Herzegovina (B&H), has adopted a Regulation on the types and content of water protection plans, which takes key steps and activities under the Floods Directive. The "Methodology for developing flood hazard and risk maps" (Methodology) was developed for the territory of Bosnia and Herzegovina, following the methodology used in the majority of EU member states, but with certain modifications to the country's characteristics. Accordingly, activities for the preparation of the Preliminary Flood Risk Assessment for each river basin district were completed in 2015 for the territory of Bosnia and Herzegovina. Activities on the production of hazard maps and flood risk maps are in progress. The results of probable climate change impact model forecasts should be included in the preparation of the Flood Risk Management Plans, which is the subsequent phase of implementing the Flood Directive. By the foregoing, the paper will give an example of the development of the hydrodynamic model of the Zujevina River, as well as the development of hazard and risk maps. Hazard and risk maps have been prepared for medium probability floods of 1/100 as well as for high probability floods of 1/20. The results of LiDAR (Light Detection and Ranging) recording were used to create a digital terrain model (DMR). It was noticed that there are big differences between the flood maps obtained by recording LiDAR techniques in relation to the previous flood maps obtained using georeferenced topographic maps. Particular attention is given to explaining the Methodology applied in Bosnia and Herzegovina.

시계열 항공사진과 20세기 초 지형도를 이용한 경안천유역의 하천형태 및 하천부지 변화추세 분석 (Analysis of River Channel Morphology and Riparian Land Use Changes using Multi-temporal Aerial Photographs and Topographic Maps of the Early 20th Century in Gyeongan-cheon Watershed)

  • 박근애;이미선;김현준;김성준
    • 한국수자원학회논문집
    • /
    • 제38권5호
    • /
    • pp.379-390
    • /
    • 2005
  • 본 연구에서는 경안천 유역을 대상으로 과거의 경년 항공사진과 지형도를 이용하여 하천형태의 변화를 분석하고, 하천주위의 토지이용변화를 비교해 보고자 하였다. 이를 위해 경안천 유역의 지방 1, 2급 하천에 해당하는 1966년, 1981년, 2000년 항공사진에 내, 외부표정을 실시하여 정사영상을 생성하였으며 또한 1914 - 1915년 지형도를 이용하여 1966년, 1981년, 2000년의 하천과 비교하였다. 이 영상을 이용하여 경년 하천형태와 하천부지의 토지이용을 분석하였는바, 주로 하천제방구역에서 뚜렷한 하천변화를 보였으며 이는 1974년의 팔당댐 건설에 따른 팔당호 유입부의 변화와 1980년대 후반의 하천정비에 따른 직선화 작업이 그 원인으로 판단된다. 또한 하천부지를 6개의 주요 분류 항목 (수역, 산림, 농지, 주거지, 도로, 모래톱)으로 토지이용도를 작성하여 그 면적변화를 분석해본 결과 농지, 주거지, 도로, 모래톱이 가장 큰 면적변화를 나타내었다.

Utilization of Thematic Mappers Data for the Comparison of Methods to Create Watersheds

  • Chang, Eun-Mi;Park, Kyeong;Kim, Young-Soo;Lee, Bok-Ho
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 1999년도 Proceedings of International Symposium on Remote Sensing
    • /
    • pp.343-348
    • /
    • 1999
  • Delineation of watersheds is one of the most basic steps for water resource management and National Park management. The purpose of this study is to investigate how to utilize Thematic Mappers scenes to compare watersheds created by running a model with those produced by digitizing topographic maps of Keum River basin. A methodology is designed and tested using Geographic Information Systems (GIS) and remote sensing to map areas with various thematic maps. A CAD data on watersheds from the Decision Support system for Water Quality is converted into GIS format. The digital elevation model with 100-meter resolution is used to create watershed by cumulative watershed method. TM scenes are also classified by new procedures including stacking method, NDVI, NDWI, and unsupervised classification methods. To evaluate the relative correctness Kyerongsan National Park was studied intensively whose area was divided into 6 watersheds in both cases. The boundaries of watershed from the model are less correct than those of the topographic maps. This result shows that automated watershed creating system needs higher-resolution digital elevation model than 100-meters.

  • PDF

지리정보시스템을 이용한 하천유역의 지상학적 특성분석 (Analysis of Stream Physiographic Characteristics of River Basin by using GIS)

  • 안승섭;조명희
    • 한국지리정보학회지
    • /
    • 제2권3호
    • /
    • pp.23-34
    • /
    • 1999
  • 본 연구에서는 하천 유역의 종합적인 물 관리에 있어서 중요한 지배요인인 하천의 형태학적 특성을 분석하기 위하여 지리정보시스템을 이용하였다. 분석에 있어서는 금호강유역의 최상류에 위치한 영천댐 유역을 대상으로 1:25,000 지형도 5도엽을 기본도로 하여 Arc/Info(UNIX) GIS시스템을 이용하였으며, 분석결과를 기존에 사용되던 방법인 수치구적기(Digital Planimeter)를 이용한 분석결과와 비교 검토하였다. 분석결과, 영천댐 유역은 5차수 하천으로 구성되어 있으며, 누가표고곡선을 분석 검토한 결과 지질학적 발달과정을 볼 때 장년기를 거쳐 노년기로 진행중인 지형특성을 가지고 있음을 알 수 있었다. 또한, 하천의 차수개념에 의한 지형의 3대 법칙을 영천댐유역에 적용한 결과 일정한 규칙성을 가지고 발달되어 있음을 알 수 있었다. 그리고 GIS기법을 이용한 유역의 형태학적특성인자 분석결과를 기존의 방법을 이용한 분석결과와 비교한 결과 GIS기법의 적용을 위한 지형속성자료의 구축에 많은 시간이 요구되나 자료의 관리와 이용측면에서 적용 가능성이 충분함을 알 수 있었다.

  • PDF

GIS based Water-pollutant Buffering Zone Management

  • Kim, Kye-Hyun;Yoon, Chun-Joo
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2002년도 Proceedings of International Symposium on Remote Sensing
    • /
    • pp.506-506
    • /
    • 2002
  • S. Korean Government has accelerating its efforts to enhance the quality of the drinking water. The Ministry of Environment has declared the law of securing water-pollutant buffering zone to minimize the inflow of the point and nonpoint sources into the drinking water sources. As a first phase of installing nationa-wide water-pollutant buffering zone, approximately 300km buffering zone has been delineated along the South and North Han river, the major drinking water sources for the capital area of S. Korea, which has the population of more than 12 millions. The buffering zone has the width of 1,000 meter for the special protection area, and 500 meter for the remaining area from both ends of the river. The major works have been done in three stages. Firstly, the boundaries lines of the buffering zone was delineated on the digital topographic maps. Secondly, the maps were overlayed with the cadastral maps to identify individual land parcels, the street address of the major pollutant discharging facilities, and all different types of pollutants including livestocks. Thirdly, the field work has been done as a verification. Once the buffering zone was generated, all the information for the buffering gone were created or imported from other government agencies including official land price, details of the major manufacturing facilities discharging considerable amount of pollutants, major motels and resorts, not to mention of restaurants, etc. Also, major livestock houses were located to identify the path of the pollutant inflow to the drinking water source. Further works need to be continued such as purchasing private lands within the buffering zone and change the land use in the efforts to decrease the pollutant amount and to provide more environmentally friendly space. Also, high resolution satellite imagery should be utilized in the near future as a cost-effective data source to update all the landuse activities within buffering zone.

  • PDF