• Title/Summary/Keyword: River master plan

Search Result 35, Processing Time 0.029 seconds

A Study on the Application and Assessment of Urban River Restoration in the Anyang River (안양천 도시하천 복원의 실행과 평가에 관한 연구)

  • Lee, Sam-Hee;Choi, Jung-Kwon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2007
  • The Anyang River which located in an urban area near Seoul had been managed focusing on supplying home and industrial water and preventing floods, coping with rapid industrialization and urbanization. Consequently, it was changed into a deadly river during 25 years. Its channel was straightened by concrete and water quality deteriorated to BOD 190mg/l. In addition, water quantity has been rapidly decreased and has been drying up. Also, as the river ecosystem, landscape, water-friendly function, and so forth were seriously deteriorated, people turn away from the urban river. From 2001, the master plan under the 10-year has been actively carried out centering on the preceding items, which are healthy river in which fishes inhabit, safe river free from floods and droughts, and pleasant river where citizens visit. As a result, its water quality was remarkably improved by BOD 5mg/l in 2005 and some upper zones were improved enough to allow people to swim. Moreover, various animals including fish and birds gather around the river. Now, the 'Anyang River Restoration Project' is recognized as the first comprehensive and systematic nature-friendly urban river improvement in Korea.

Estimation of low impact development duration of estuaries at urban area (도시 유역에 위치한 하구를 구성하는 하천의 저영향 개발 기간 산정)

  • Jeong, Anchul;Lim, Jeongcheol;Kim, Songhyun;Baek, Chungyeol
    • Journal of Wetlands Research
    • /
    • v.21 no.4
    • /
    • pp.290-297
    • /
    • 2019
  • The estuary is a transition zone where fresh water and salt water meet because the stream is connected to the open sea area. So estuaries have very high biodiversity and form a unique ecosystem. However, before the recognition of the ecological value of the estuaries, various damage and disturbances have been occurred so countermeasures are needed. The river master plan is acting as a disturbance factor. However, the river master plan has the public object such as water disaster defense, river function improvement, and national water resources management. Therefore, it is necessary to study the ways in which the opposite relationship of development and ecosystem protection coexist. In this study, the concept of environmental windows were used to estimate the low impact development duration. We expected that proposed method for low impact development duration estimation can be used as a basis and basic data to protected the ecosystem from development project and disturbance in the future.

Study of Design Flood Estimation by Watershed Characteristics (유역특성인자를 이용한 설계홍수량 추정에 관한 연구)

  • Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.15 no.9
    • /
    • pp.887-895
    • /
    • 2006
  • Through this research of the analysis on the frequency flood discharges regarding basin property factors, a linear regression system was introduced, and as a result, the item with the highest correlation with the frequency flood discharges from Nakdong river basin is the basin area, and the second highest is the average width of basin and the river length. The following results were obtained after looking at the multi correlation between the flood discharge and the collected basin property factors using the data from the established river maintenance master plan of the one hundred twenty-five rivers in the Nakdong river basin. The result of analysis on multivariate correlation between the flood discharges and the most basic data in determining the flood discharges as basin area, river length, basin slope, river slope, average width of basin, shape factor and probability precipitation showed more than 0.9 of correlation in terms of the multi correlation coefficient and more than 0.85 for the determination coefficient. The model which induced a regression system through multi correlation analysis using basin property factors is concluded to be a good reference in estimating the design flood discharge of unmeasured basin.

RAUT: An end-to-end tool for automated parsing and uploading river cross-sectional survey in AutoCAD format to river information system for supporting HEC-RAS operation (하천정비기본계획 CAD 형식 단면 측량자료 자동 추출 및 하천공간 데이터베이스 업로딩과 HEC-RAS 지원을 위한 RAUT 툴 개발)

  • Kim, Kyungdong;Kim, Dongsu;You, Hojun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1339-1348
    • /
    • 2021
  • In accordance with the River Law, the basic river maintenance plan is established every 5-10 years with a considerable national budget for domestic rivers, and various river surveys such as the river section required for HEC-RAS simulation for flood level calculation are being conducted. However, river survey data are provided only in the form of a pdf report to the River Management Geographic Information System (RIMGIS), and the original data are distributedly owned by designers who performed the river maintenance plan in CAD format. It is a situation that the usability for other purposes is considerably lowered. In addition, when using surveyed CAD-type cross-sectional data for HEC-RAS, tools such as 'Dream' are used, but the reality is that time and cost are almost as close as manual work. In this study, RAUT (River Information Auto Upload Tool), a tool that can solve these problems, was developed. First, the RAUT tool attempted to automate the complicated steps of manually inputting CAD survey data and simulating the input data of the HEC-RAS one-dimensional model used in establishing the basic river plan in practice. Second, it is possible to directly read CAD survey data, which is river spatial information, and automatically upload it to the river spatial information DB based on the standard data model (ArcRiver), enabling the management of river survey data in the river maintenance plan at the national level. In other words, if RIMGIS uses a tool such as RAUT, it will be able to systematically manage national river survey data such as river section. The developed RAUT reads the river spatial information CAD data of the river maintenance master plan targeting the Jeju-do agar basin, builds it into a mySQL-based spatial DB, and automatically generates topographic data for HEC-RAS one-dimensional simulation from the built DB. A pilot process was implemented.

IT Industrial Policy of China (중국 IT 산업 정책)

  • Kwon Oh-Heung
    • Resources Recycling
    • /
    • v.12 no.6
    • /
    • pp.64-70
    • /
    • 2003
  • China is in the midst of readiness for the jump of the IT industry. It is generally esteemed in business circles that China will step up to the level which can be called the strong country of IT in the aspect of quality as well as the expansion of quantity China has put in operation the supporting policies of IT industry altogether through 'The 10th 5-year plan' which has begun since 2001 keeping pace with it, we are going to find out the desirable directions which we head for by looking into the present situation and policies for the development of Jung-kyung, where 'The master plan of the western development' is now Per-forming to balance the big economic disparity in the eastern and western areas.

Optimization for Roughness Coefficient of River in Korea - Review of Application and Han River Project Water Elevation - (실측 자료를 이용한 국내하천의 조도계수 산정 -적용성 및 한강의 계획홍수위 검토-)

  • Kim, Jooyoung;Lee, Jong-Kyu;Ahn, Jong-Seo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6B
    • /
    • pp.571-578
    • /
    • 2010
  • Manning's roughness coefficients were reevaluated for the computation of river flow of the Han River, the Nakdong River and the Geum River. The roughness coefficients were estimated by two methods. One is based on the assumption that roughness is primarily a function of grain diameter and the other is based on the findings that roughness may vary significantly with the flow discharge. The roughness coefficients adopted in each river improvement master plan have been compared with those obtained using the FLDWAV in this study, and their applicabilities have been reviewed, using the FLDWAV and HEC-RAS models. The design flood water levels computed by the abovementioned models with the roughness coefficients proposed in this study have shown good agreement with the measurements of time variation. The roughness coefficients computed using the FLDWAV model showed nearly no close correlation with the various hydraulic characteristic factors, such as grain size and river depth, etc.. Finally the design flood water levels and levee safety about the downstream part from the Paldang Dam of the Han River has been reviewed using HEC-2 model with roughness coefficients of this study and the results indicated that some parts of the existing levees were short of safety.

Analysis of Design Flood Change for the Small to Medium Size Rivers in Gyeonggi-do (경기도 중.소하천의 계획홍수량 변화 분석)

  • Park, Sun-Hee;Won, Jin-Young;Song, Ju-Il;Yoon, Sei-Eui
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.2
    • /
    • pp.143-149
    • /
    • 2010
  • The river master plan was established every 10 years in Korea. The basin characteristics of 62 small and medium size rivers of which master plans were recently established during the past three years in Gyeonggi-do were investigated, and design rainfalls and design floods in the past and the latest were compared and analyzed. It was predicted that basin data and flood estimating method changed design flood. The quantitative amount of design floods were analyzed for 6 basins like Gungunchen etc. As the results, the increasing factors of design flood were the application of critical duration time, temporal time of rainfall and the increase of CN value. The decreasing factors of design flood were the application of Huff's rainfall distribution instead of Mononobe one and the ARF. The application of critical duration time increased flood about 60% whereas the application of Huff's rainfall distribution method estimated less flood than Mononobe about 62%. Considering critical duration time and changing rainfall distribution were the most important factors of increasing or decreasing design flood. However, trends of flood variation were differently analyzed by factors in 6 basins because characteristics of topography, weather, hydrology and hydraulic were different, now that correlations were not found between factors and flood variation. Flood variation is evaluated by complex effects of factors so new flood recalculated by reasonable methods should be considered as design flood.

The Inundation Simulation for Inland by River Hydraulic Structures (하천 수리구조물에 의한 제내지 침수모의)

  • Choo, Tai-Ho;Yoon, Hyeon-Cheol;Noh, Hyun-Suk;Yun, Gwan-Seon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.2460-2468
    • /
    • 2014
  • A local rain that is concentrated in specific area in a short time frequently occurs due to recent abnormal weather. To prevent potential flood disasters, therefore, it is necessary to be established to the flood control system. Checking the river design standard, however, hydrologic design frequency of water gate is only marked as over 20 years, so this fact shows that the standard is unclear. The inland inundation modeling considering the stage in a river and quantitative assessment are required to reduce flood damage. The simulation for internal inundation is very complex and is time-consuming due to considering hydraulic hydrology characteristics at the same time. Using the already established river master plan, consequently, this study proposed the simple and convenient method for assessment of the internal inundation simulation. Using the proposed method in the upper and middle regions of a river, influences for design frequency or water gate location were assessed by applying the nine probability precipitation with design frequency and by targeting the water gates which are installed in five inlands.

Application and Analysis for Flood Season Roughness Height of River Master Plan(the case of streams of Han river basin) (하천기본계획의 홍수기 조도계수의 적용 및 분석(한강유역 하천 사례))

  • Lee, Tae-Hee;Park, Hyun-Keun;Kim, Seung-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1965-1970
    • /
    • 2010
  • 국내 하천은 하천의 관리, 이용, 개발, 치수경제 및 수질 보전을 위해 각 하천에 대해 하천기본계획이 작성되고 있다. 치수와 관련하여 조도계수는 각 하천의 계획홍수량 산정 및 하천제방 등 구조물 설계에 필수적인 인자로서 조도계수의 정확도에 따라 결과에 큰 오차범위를 가지게 된다. 국내 하천기본계획은 하천의 하상재료 및 하도조건에 따라 산정되어지는 조도계수를 각 하천의 일정빈도 홍수량에 맞추어 일정한 값으로 조도계수를 추정하고 있다. 본 연구에서는 국토해양부에서 2009년 한강유역 19개 지점에 대해 관측한 자료와 하천기본계획상에 제시된 조도계수를 적용하여 산정된 값을 비교 분석하였다. 국토해양부의 관측자료 분석에 있어서 유량 관측시 관측지점의 수면경사 및 하상경사의 관측 결함으로 하천기본계획상에 제시된 지형으로부터 하상경사를 추정하였으며 1차적으로 에너지경사는 하상경사와 동일하다고 가정하였다. 또한, 하천기본계획에 제시된 조도 계수의 값은 어느 일정 홍수빈도에 대하여 산정된 값으로 국토해양부 관측자료 중 갈수기 및 평수기의 자료는 제외하고 홍수기의 관측값에 대하여 분석을 실시하였다. 이러한 가정하에 하천기본계획상에 제시된 조도계수를 인용하여 Manning-Strickler 식으로 부터 산정된 유속과 국토해양부의 관측유속을 비교 분석하였다.

  • PDF

Establishment A Master Plan of 3D River Information (3차원 하천정보화 기본계획 수립)

  • Kim, Jeong-Yup;Cho, Hyo-Seob;Kim, Hwi-Rin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1505-1509
    • /
    • 2008
  • 본 기본계획 수립에서는 하천업무의 문제점을 개선하고 영상정보를 적극 활용할 수 있는 토대를 마련하고자 현재까지 전산화되지 않은 하천 제외지 지형정보와 하천을 대상으로 하는 영상정보를 취득하여 DB화하고, 이렇게 구축된 영상정보 및 하천 공간정보를 결합하여 활용할 수 있는 주요 시스템 구축에 주안점을 두고 3차원 하천정보화 기본계획을 제시하였다. 3차원 하천정보화 기본계획의 목표연도는 2011년까지로 설정하였고, 2007년부터 2011년까지 총 5개년에 대해 로드맵을 제시함과 동시에 분야별 중점 추진과제를 도출하였다. 그리고, 도출된 중점 추진과제에 대한 실행계획을 제시하였다. 로드맵은 하천 제외지에 대한 공간정보를 체계적으로 구축하여 활용할 수 있는 기반을 조성할 수 있도록 제시하였으며, 또한 영상정보를 활용한 하천업무의 3차원 공간정보 제공도 중요한 요소로써 고려하였다.

  • PDF