Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

Geomorphic Resources of Mt. Palgong, in Daegu (대구 팔공산의 지형자원)

  • JEON, Young-Gweon
    • Journal of The Geomorphological Association of Korea
    • /
    • v.18 no.4
    • /
    • pp.247-259
    • /
    • 2011
  • This research aimed to analyse geomorphic resources of Mt. palgong(in Daegu city and Gyeongbuk province) through some field surveys, and then to clarify geomorphic features. The main results are as follows. 1) The geological boundary of the south slope(granite) is more clear than one of the north slope(granite bedrock and metamorphic sedimentary rock). Small basins are along with fault line between granite bedrock and metamorphic sedimentary rock. 2) It is estimated that relatively big valleys on the north slope are due to local climate, geomorphic and geological features. 3) Tor, sheeting joint, gutter are well developed both on the south slope and on the north slope, however the development of polygonal cracking and boulder stream are more dominant on the south slope; river cliff, pool, waterfall are more dominant on the north slope with valleys that well developed. 4) Scenic geomorphic landscapes are mainly developed in Dongsan valley and Chisan valley on the north slope. 5) There are many interesting geomorphic resources in the viewpoint of storytelling in Mt. Palgong. So the specific design to utilize such resources is required

Estimation of Superelevation in Mountainous River Bends (산지하천 만곡부의 편수위 산정)

  • Park, Sang Doeg;Lee, Seung Kyu;Shin, Seung Sook;Cho, Jaewoong
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.12
    • /
    • pp.1165-1176
    • /
    • 2014
  • In a river bend the water surface is inclined by the centrifugal force toward the transverse section. If channel slope and flow rate increase, the gradient is rising generally. There are lots of the flood damage at the bends of mountain river because the flood water levels have exceeded frequently the levee levels which are added a free board to the design flood water level. Therefore the superelevation should be considered in designing the mountainous river bend. In present study it was proposed to estimate the superelevation at the bend of mountain river and the superelevation coefficient defined from multiplying the sub-factors. The values of the influence factors for the superelevation coefficient were suggested from analyzing the superelevation measured at the bends in Yangyangnamdae river and the hydraulic experiments in gravel-bed channel with a $90^{\circ}$ bend. The applicability of these methods to estimate the superelevation at the bends in mountain river was verified by the superelevation measured at the bend in Naerin river.

A Study for the Calculation of Instream Flow in the Rehabilitation of Urban stream (도심하천 복원에 따른 하천유지유량 산정 연구)

  • Choi, Gye Woon;Chang, Yun Gyu;Han, Man Sin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.448-452
    • /
    • 2004
  • Instream flow is necessary to manage the basic function of the rivers. The evaluation method of instream flow in a big river has been studied widely. However, the study in a urban hasn't researched. In theses days the environmental function of a river becomes very important. The evaluation method and secure of instream flow are basic conditions to perform it. Especially view of stream, recreation, protection of ecology are highly demanded In a urban according to the multipurpose of river spaces. In this paper the evaluation methods of instream flow were compared and investigated with many papers. This paper presents a proper evaluation procedure of instream flow in a urban stream through comparison and examination. According to the demanded hydraulic conditions the method can be considered the environmental function depend on the purpose of river restoration. The relationship of the coefficient of roughness and the slope of the river bed were examinated in order to estimate the minimum instream flow corresponding to proper Hydraulic conditions. Also calculate the instream flow of Sueng-gi stream in In-cheon.

  • PDF

Improvement of the storage coefficient estimating mehod for the clark model (Clark 단위도의 저류상수산정방법의 개선)

  • 윤태훈;박진원
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2002.05b
    • /
    • pp.1334-1339
    • /
    • 2002
  • The objective of this study is to help practicing engineers easily use the Clark model which is used for estimating the magnitude of design flood for small stream. A representative unit hydrograph was derived on the basis of the past rainfall-runoff data and unit hydrographs, and the storage coefficient of Clark model was estimated by using hydrograph recession analysis. Since the storage coefficient(K) is a dominating factor among the parameters of Clark method, a mulitple regression formula, which has the drainage area, main channel length and slope as parameters, is propsed to estimate K value of a basin where measured data are missing. The result of regression analysis showed that there is a correlation between a storage coefficient(K) and aforemetioned three parameters in homogenious basins. A regression formular for K was derived using these correlations in a basin of Han River, Nakdong River, Young River, Kum River and Sumjin River

  • PDF

The Actual Condition of River Revetment in Gang Won-Do (강원도 하천 호안 실태조사)

  • Choi, Han-Kuy;Jung, Young-Duk;Baek, Hyo-Seon
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.207-213
    • /
    • 2009
  • The propose of this study is to survey the revetments installed in Gangwon Province for identifying their characteristics. The survey showed that in eastern Gangwon Province, gabion, retaining wall and concrete blocks took about 63% or more, and in western Gangwon Province, dry wall, gabion and retaining wall, 68% or more. Gabion and dry wall had better vegetation coverage in western Gangwon Province than in eastern Gangwon Province. That is thought to be due to slope of river and under-water frequency.

  • PDF

Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds (낙동강 오염총량관리 단위유역 유달율 경험공식)

  • Kim, Mun Sung;Shin, Hyun Suk;Park, Ju Hyun;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

Effects of DEM Resolution on Hydrological Simulation in, BASINS-BSPF Modeling

  • Jeon, Ji-Hong;Ham, Jong-Hwa;Chun G. Yoon;Kim, Seong-Joon
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.7
    • /
    • pp.25-35
    • /
    • 2002
  • In this study, the effect of DEM (Digital Elevation Model) resolution (15m, 30m, 50m, 70m, 100m, 200m, 300m) on the hydrological simulation was examined using the BASINS (Better Assessment Science Integrating point and Nonpoint Source) for the Heukcheon watershed (303.3 ㎢) data from 1998 to 1999. Generally, as the cell size of DEM increased, topographical changes were observed as the original range of elevation decreased. The processing time of watershed delineation and river network needed more time and effort on smaller cell size of DEM. The larger DEM demonstrated had some errors in the junction of river network which might affect on the simulation of water quantity and quality. The area weighted average watershed slope became milder but the length weighted average channel slope became steeper as the DEM size increased. DEM resolution affected substantially on the topographical parameter but less on the hydrological simulation. Considering processing time and accuracy on hydrological simulation, DEM grid size of 100m is recommended for this range of watershed size.

Analysis of Land Subsidence Risk Factors Considering Hydrological Properties, Geomorphological Parameters, and Population Distribution (수문 및 지형특성과 인구분포를 고려한 지반침하 발생 평가인자 분석)

  • Ye-Yeong Lee;Dahae Lee;Eun-Ji Bae;Chung-Mo Lee;Hanna Choi
    • Journal of Soil and Groundwater Environment
    • /
    • v.28 no.6
    • /
    • pp.45-57
    • /
    • 2023
  • To assess land subsidence estimation and preparedness in the Geum River basin, this study applied GIS techniques and identified six key areas. The Geum River basin has experienced an increase in heavy rainfall since late 2010, and four study areas have shown an increase in groundwater levels. Land subsidence primarily occurred from June to September, with higher rainfall years in 2020 and 2023. Approximately 83.6% of land subsidence in Chungcheongbuk-do province occurred in Cheongju-si, mainly attributed to aging sewage pipes. The regions experiencing population growth have likely led to the construction of underground infrastructures and sewer pipes. Thus, it is considered that various factors, including sewage pipe leaks, precipitation, slope gradient, low drainage density, and groundwater level fluctuations, have contributed to land subsidence. Improving land subsidence estimation involves incorporating additional natural factors and human activities.

A Method of Rating Curve Adjustment (수위유량곡선보정방법에 대하여)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.2
    • /
    • pp.4116-4120
    • /
    • 1976
  • With the use of many rivers increased nearly to the capacity, the need for information concerning daily quantities of water and the total annual or seasonal runoff has became increased. A systematic record of the flow of a river is commonly made in terms of the mean daily discharge Since. a single observation of stage is converted into discharge by means of rating curve, it is essential that the stage discharge relations shall be accurately established. All rating curves have the looping effect due chiefly to channel storage and variation in surface slope. Loop rating curves are most characteristic on streams with somewhat flatter gradients and more constricted channels. The great majority of gauge readings are taken by unskilled observers once a day without any indication of whether the stage is rising or falling. Therefore, normal rating curves shall show one discharge for one gauge height, regardless of falling or rising stage. The above reasons call for the correction of the discharge measurements taken on either side of flood waves to the theoretical steady-state condition. The correction of the discharge measurement is to consider channel storage and variation in surface slope. (1) Channel storage As the surface elevation of a river rises, water is temporarily stored in the river channel. There fore, the actual discharge at the control section can be attained by substracting the rate of change of storage from the measured discharge. (2) Variation in surface slope From the Manning equation, the steady state discharge Q in a channel of given roughness and cross-section, is given as {{{{Q PROPTO SQRT { 1} }}}} When the slope is not equal, the actual discharge will be {{{{ { Q}_{r CDOT f } PROPTO SQRT { 1 +- TRIANGLE I} CDOT TRIANGLE I }}}} may be expressed in the form of {{{{ TRIANGLE I= { dh/dt} over {c } }}}} and the celerity is approximately equal to 1.3 times the mean watrr velocity. Therefore, The steady-state discharge can be estimated from the following equation. {{{{Q= { { Q}_{r CDOT f } } over { SQRT { (1 +- { A CDOT dh/dt} over {1.3 { Q}_{r CDOT f }I } )} } }}}} If a sufficient number of observations are available, an alternative procedure can be applied. A rating curve may be drawn as a median line through the uncorrected values. The values of {{{{ { 1} over {cI } }}}} can be yielded from the measured quantities of Qr$.$f and dh/dt by use of Eq. (7) and (8). From the 1/cI v. stage relationship, new vlues of 1/cI are obtained and inserted in Eq. (7) and (8) to yield the steady-state discharge Q. The new values of Q are then plotted against stage as the corrected steadystate curve.

  • PDF