• Title/Summary/Keyword: River Project(Construction) Management System

Search Result 18, Processing Time 0.028 seconds

Improvement of Detailed Indicators and Application of Methodology for Post-Evaluation of National River Project (국가하천사업 사후 평가를 위한 세부지표 개선 및 방법론 적용)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.188-196
    • /
    • 2021
  • Korea has invested heavily in projects related to national rivers, but there is no evaluation technique and system to manage river projects that can evaluate the effectiveness of the river projects after they are completed. Their absence leads to the inability of information on river construction sections, analysis of project effects, and benchmarking between projects. This may cause over-budget, overlapping investment problems due to the implementation of similar projects in the same section, and incorrect business elements may be repeatedly utilized. In order to solve this shortcoming, this study developed river project evaluation techniques and a river project (construction) management system. The development of evaluation techniques enables comparison and analysis between projects and can be utilized in establishing maintenance plans. The system can also provide inquiry of construction information, visualization of construction, and management of performance items. In this study, the evaluation techniques developed through prior research were modified and supplemented, and the effectiveness was verified by applying them to national river projects in A river and B river. It is expected that the evaluation techniques and system utilization measures presented will increase the work efficiency of river projects and enhance the efficiency of river projects.

Analysis of Water-Quality Constituents Variations before and after Weir Construction in South Han River using Probability Distribution (확률분포를 이용한 남한강 보 건설 전·후 수질변화 분석)

  • Kim, Kyung Sub
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.1
    • /
    • pp.55-63
    • /
    • 2019
  • The Four Major Rivers Restoration Project started in 2009 and completed in early 2013 is a large-scale inter-ministry SOC project investing ₩22.2 $10^{12}$ and one of the Project's objectives was to enhance the water-quality grade through recovering the river eco-system and environment. The average concentration and probability distribution of water-quality constituents at given and selected sampling sites are very significant elements for analyzing and controlling the water-quality of rivers or reservoirs effectively. Average concentration can be estimated by point estimator, distribution function of water-quality constituents or Bootstrap method, in which the distribution function estimated with more data in case of insufficient dataset, is applied. Ipo and Gangcheon water-quality monitoring stations in South Han River were selected to compare and analyze the variation of concentration before and after Ipo and Gangcheon Weirs construction, using the whole 4-year's data, from 2005 to 2008 and from 2014 to 2017. Water-quality constituents such as BOD and COD relating to oxygen demanding wastes and TP and Chlorophyll-a relating to the process of nutrient enrichment called eutrophication were also selected. The guidelines for water-quality control and management after weir construction including evaluation of water-quality constituents' variations can be presented by this paper.

Regional House Prices and the Ripple Effect in the Yangtze River Delta Region

  • Chang, Tengyuan;Deng, Xiaopeng;Tan, Yuting;Zhou, Qianwen
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.62-72
    • /
    • 2017
  • In this study, liner unit root tests and panel unit root tests to the ratio of city to regional house price were applied to examine the ripple effects across 28 cities in the Yangtze River Delta region. Then invert LM unit root tests with two structural breaks for 10 representative cities were conducted. The results showed that there is overwhelming evidence of the existence of ripple effect in the Yangtze River Delta region, while segmentation is restricted to a small group of cities in which there is no long-run relationship with the Yangtze River Delta region average; compared to no- and one-break case, there is overwhelming evidence of a ripple effect with the LM test with two structural breaks. Furthermore, the results of the Granger causality test showed that changes in house prices in Shanghai, Nanjing and Hangzhou have led to changes in house prices in other cities. The findings of this research make certain contributions to the improvements of research system of ripple effect among regional house prices in the Yangtze River Delta Region,and could be referenced by other markets of other cities.

  • PDF

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

DEVELOPMENT OF A FLOOD PROTECTION SYSTEM BY THE USE OF MODEL TESTS

  • Knoblauch Helmut;Goekler Gottfried;Heigerth Guenther
    • Water Engineering Research
    • /
    • v.3 no.1
    • /
    • pp.45-55
    • /
    • 2002
  • The Szentgotthard Flood Protection Project is located in the southeasters part of Austria, very close to the Hungarian border and to the Hungarian town of Szentgotthard situated near the Junction of the rivers Lafnitz and Raab. During heavy rainstorms, this area has always been liable to severe floodings, affecting the town itself and upstream reaches, where major industrial and commercial development is planned. In order to solve these problems, several solutions have been developed by means of a series of model tests performed at the hydraulic laboratory of the Technical University of Graz, Austria. The model was constructed to scales 1:75 (lengths) and 1:25 (heights). This trebled scale allowed greater accuracy in the measurement of discharge depths. The results from the model tests have led to the following proposals: - Construction of a flood relief trough with an inflow section 3.5 km upstream of the junction of the rivers Lafnitz and Raab. - Use of a former river bed for the flood relief trough. - Design of a lowered embankment crest section to pass one-third of the maximum flood flow of the river Lafnitz. - Connection of the flood relief trough to the Lahnbach stream, a tributary of the river Raab.

  • PDF

A Site Application verification of technology and Equipment for Construction Application of Construction CALS System (건설 CALS 시스템 건설공사 활용을 위한 요소기술 및 장비의 현장 적용성 검증)

  • Choi, Sang-Yong;Shin, Tae-Hong;Kim, Byung-Kon;Kim, Tea-Hak;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.767-771
    • /
    • 2008
  • From industrial field spearhead IT and new create an added value and market with fusion of traditional industry composition researches actively to be in the process of advancing. The application possibility of high-tech IT technique is coming to be high in construction industry. Currently, the user requirements that upgrade existing system to high-tech construction project information system combined construction CALS system applying in road/river business management service with high-tech IT such as ubiquitous and mobile techniques are increasing. Therefore, the objective of this study is to verify site application of RFID and mobile equipment for applying in high-tech field with ubiquitous and mobile techniques so that construction CALS system gets advanced increasingly.

  • PDF

HOUSING PRICE MODEL USING GIS IN SEOUL (APPLICATIONS OF STRUCTURAL EQUATION MODELING)

  • Kyong-Hoon Kim;Jae-Jun Kim;Bong-Sik Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.366-375
    • /
    • 2007
  • Our nation has a problem with discrimination of income distribution and inefficient of resources distribution caused by real estate price rising from a sudden economy growth and industrialization. Specially, in recent years, there is a great disparity of condominium price between the north and south of the Han river. Because the housing price is deciede by the immanent value of a house and neighborhood effects of the regional where the house is situated, the housing price is occurred difference. In this study, I analyzed the differences of housing price determinants about condominium developments in the old and new residential areas, and found the important factors that affect the condominium price using Structural Equation Modeling(SEM) The purpose of study is to analyze the influence of various factors of housing price. Also, this study tried to predict real estate market and to establish previous effective real estate policy.

  • PDF

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects (공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구)

  • Cho, Young-Jun;Kim, Jong-Ouk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.109-116
    • /
    • 2010
  • A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.