• Title/Summary/Keyword: River Construction

Search Result 1,279, Processing Time 0.033 seconds

Environmental Impact Assessment of the Yangyang Pumped Storage Power Plant Construction on the Namdae-Chun River, Korea (남대천 양양 양수발전소의 환경영향과 대책)

  • Chun, Sang-Ki
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.151-160
    • /
    • 1997
  • The Yangyang Pumped Storage Power Plant is being constructed by Korea Electric Power Corporation in Namdae-Chun River, Korea. The Yangyang Pumped Storage Power Plant has 1000MW capacity with upper reservior, lower reservior, hydrauric tunnel and underground power plant facilities. But NGO(Non Governmental Groups) and residents are worried about the power plant construction because of some problems, as follows. (1) Namdae-Chun River is principal salmon returning river in Korea. (2) Namdae-Chun River is main water supply source of the Yangyang country. So, brief explanation of Environmental Impacts Assessment executed by Korea Electric Power Corporation, main environmental impacts and countermeasures will be introduced.

  • PDF

Spatial Downscaling of Precipitation from GCMs for Assessing Climate Change over Han River and Imjin River Watersheds

  • Jang, S.;Hwang, M.;Hur, Y. T.;Yi, J.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.738-739
    • /
    • 2015
  • The main objective of this study, "Spatial Downscaling of Precipitation from GCMs for Assessing Climate Change over Han River and Imjin River Watersheds", is to carry out over Han River and Imjin River watersheds. To this end, a statistical regression method with MOS (Model Output Statistics) corrections at every downscaling step was developed and applied for downscaling the spatially-coarse Global Climate Model Projections (GCMPs) from CCSM3 and CSIRO with respect to precipitation into 0.1 degree (about 11 km) spatial grid over study regions. The spatially archived hydro-climate data sets such as Willmott, GsMap and APHRODITE datasets were used for MOS corrections by means of monthly climatology between observations and downscaled values. Precipitation values downscaled in this study were validated against ground observations and then future climate simulation results on precipitation were evaluated for the projections.

  • PDF

The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City - (친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 -)

  • An, Byung-Chul
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.

Application of Physical Habitat Simulation System (PHABSIM) in the Reach of Small Dam Removal for Zacco platypus (피라미에 대한 보 철거 구간에서의 물리서식처 모의(PHABSIM) 적용)

  • Im, Dong-Kyun;Jung, Sang-Hwa;Ahn, Hong-Kyu;Kim, Kyu-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.11
    • /
    • pp.909-920
    • /
    • 2007
  • River restoration and environmental improvement projects have been peformed by social needs, therefore methodology for evaluating such projects must be provided. The PHysical HABitat SIMulation system (PHABSIM) is proposed as a tool for the assessment of hydraulic habitat suitability for aquatic species related to flow regime in river. This study evaluates the change of physical habitat for Zacco platypus according to small dam removal and the model suitability by applying PHABSIM to the reach where small dam was removed. It is shown that the physical habitat is generally increased and improved where the small dam was removed. However, physical habitat in the spawning stage that has a weak swimming speed is decreased by increased flow velocity in the upstream area of small dam, so proper countermeasure for that condition should be needed. Consequently, PHABSIM can be effectively used to provide methodology for assessment and necessity of various river projects including a removal of out-aged hydraulic structures.

Spatially Distributed Model for Soil Loss Vulnerability Assessment in Mekong River Basin

  • Thuy, H.T.;Lee, Giha;Lee, Daeeop;Sophal, Try
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.188-188
    • /
    • 2016
  • The Mekong which is one of the world's most significant rivers plays an extremely important role to South East Asia. Lying across six riparian countries including China, Myanmar, Thailand, Laos, Cambodia and Vietnam and being a greatly biological and ecological diversity of fishes, the river supports a huge population who living along Mekong Basin River. Therefore, much attention has been focused on the giant Mekong Basin River, particularly, the soil erosion and sedimentation problems which rise critical impacts on irrigation, agriculture, navigation, fisheries and aquatic ecosystem. In fact, there have been many methods to calculate these problems; however, in the case of Mekong, the available data have significant limitations because of large area (about 795 00 km2) and a failure by management agencies to analyze and publish of developing countries in Mekong Basin River. As a result, the Universal Soil Loss Equation (USLE) model in a GIS (Geographic Information System) framework was applied in this study. The USLE factors contain the rainfall erosivity, soil erodibility, slope length, steepness, crop management and conservation practices which are represented by raster layers in GIS environment. In the final step, these factors were multiplied together to estimate the soil erosion rate in the study area by using spatial analyst tool in the ArcGIS 10.2 software. The spatial distribution of soil loss result will be used to support river basin management to find the subtainable management practices by showing the position and amount of soil erosion and sediment load in the dangerous areas during the selected 56- year period from 1952 to 2007.

  • PDF

Seasonal Variation of Water Temperature Before and After Weir Construction Using Satellite Image in the Nakdong River (낙동강유역에서 위성영상을 이용한 보 건설 전후 수온의 계절변화)

  • Kim, Sang-Woo;Kim, Hae-Dong;Lim, Jin-Wook;Ahn, Ji-Suk
    • Journal of Environmental Science International
    • /
    • v.24 no.11
    • /
    • pp.1417-1430
    • /
    • 2015
  • In this study we were to explore the seasonal variation of water temperature distributions before and after weir construction at Gumi, Chilgok, Gangjung(Goryung), Dalsung in the Nakdong River using Landsat satellite images. Relationship between in-situ water temperature and radiance values of Landsat-5, 7, 8 satellite images showed high correlation. Seasonal variation of water temperature in Nakdong River showed that the fluctuation ranges of water temperature before weir construction were larger than those after weir construction. This indicated that the variation of water temperature is due to the difference of heat storage volume by weir construction and dredging work. In particular, the water temperature after weirs construction in autumn was 4-8 times lower than that before weirs construction. Water temperature after weir construction decreased in spring and summer at the downstream of Gumi weir and Gangjung(Goryung) weir, and the upstream of Dalsung weir. In autumn and winter, the water temperature after weir construction increased in the upstream and downstream of the whole weirs except upstream of Gumi weir. Relationship between water temperature and meteorological elements (air temperature, wind speed, sunshine, radiation) showed high correlation of above 94% in air temperature, and then radiation was high correlation before and after 65%.

Morphological Change in Seabed Surrounding Jinwoo-Island Due to Construction of New Busan Port - Qualitative Evaluation through Numerical Simulation (부산신항 건설이 진우도 주변 해저지형 변화에 미치는 영향 - 수치실험을 통한 정성적 평가)

  • Hong, Namseeg
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.192-201
    • /
    • 2018
  • In this study, a qualitative evaluation of the morphological changes in the seabed surrounding Jinwoo-Island due to the construction of the new Busan port were determined through a numerical simulation. Various scenarios for the discharge of the Nakdong river estuary dam and construction stage of the new Busan port were established and utilized for an indirect and qualitative investigation through simulation using the numerical model implemented in this study. It was concluded through a qualitative study that the morphological changes in the seabed surrounding Jinwoo-Island were typical estuary seabed changes due to the discharge of the Nakdong river estuary dam and waves from the open sea. The effects from the construction of the new Busan port were relatively small.

Changes in Landscape Characteristics of Stream Habitats with the Construction and Operation of River-Crossing Structures in the Geum-gang River, South Korea (금강에서 횡단구조물의 설치와 운영에 따른 하천 서식처의 경관 특성 변화)

  • Kim, Dana;Lee, Cheolho;Kim, Hwirae;Ock, Giyoung;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.1
    • /
    • pp.64-78
    • /
    • 2021
  • This study was conducted to find out the effect of the construction and operation of river-crossing structures on the habitat landscape characteristics in the Geum-gang River, South Korea. A total of three study reaches were selected in the downstream of the Daecheong Dam: the Buyong-ri reach, which is a control that is not affected by the construction and operation of the weir of the Four Rivers Project and Sejong-bo Weir reach and Gongju-bo Weir reach of the upper and lower sections of each weir that are affected by the weir construction and operation. The habitat type was classified, and then the structural characteristics of the landscape were analyzed using aerial photographs taken before and after the construction of the Daecheong Dam, before and after the construction of the weir, and before and after the weir gate operation. After the construction of Daecheong Dam in Geum River, the area of the bare land greatly decreased, and the area of grassland and woodland increased in the downstream of the dam. In addition, the patch number in the river landscape increased, the patch size decreased, and the landscape shape index and the habitat diversity increased. Therefore, after the construction of the dam, the bare land habitat was changed to a vegetated habitat, and the habitat was fragmented and diversified in the downstream of the dam. After the construction of the weirs, the area of open water increased by 18% in the Sejong-bo reach and by 90% in the Gongju-bo reach, and the landscape shape index of the open water decreased by 32% in the Sejong-bo reach and by 35% in the Gongju-bo reach, and the habitat diversity index decreased to 25% in the Sejong-bo reach and to 24% in the Gongju-bo reach. Therefore, the open water habitat was expanded, the shape of the habitat was simplified, and the habitat diversity decreased according to the construction of the weirs. After water-gate opening of the weir, the bare land that disappeared after the construction of the weir reappeared, and the landscape shape index and habitat diversity index increased in both terrestrial and open water habitats. Therefore, it was found that the landscape characteristics of the river habitats were restored to the pre-construction of the weir by the operation of the weir gate. The effect of weir gate opening was delayed in the downstream than in the upstream of the weir. Although the characteristics of the landscape structure in the river habitat changed due to the construction of the river-crossing structures, it is thought that proper technology development for the ecological operation of the structures is necessary as the habitat environments can be restored by the operation of these structures.

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

Analysis of Water-Quality Constituents Variations before and after Weir Construction in South Han River using Probability Distribution (확률분포를 이용한 남한강 보 건설 전·후 수질변화 분석)

  • Kim, Kyung Sub
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.1
    • /
    • pp.55-63
    • /
    • 2019
  • The Four Major Rivers Restoration Project started in 2009 and completed in early 2013 is a large-scale inter-ministry SOC project investing ₩22.2 $10^{12}$ and one of the Project's objectives was to enhance the water-quality grade through recovering the river eco-system and environment. The average concentration and probability distribution of water-quality constituents at given and selected sampling sites are very significant elements for analyzing and controlling the water-quality of rivers or reservoirs effectively. Average concentration can be estimated by point estimator, distribution function of water-quality constituents or Bootstrap method, in which the distribution function estimated with more data in case of insufficient dataset, is applied. Ipo and Gangcheon water-quality monitoring stations in South Han River were selected to compare and analyze the variation of concentration before and after Ipo and Gangcheon Weirs construction, using the whole 4-year's data, from 2005 to 2008 and from 2014 to 2017. Water-quality constituents such as BOD and COD relating to oxygen demanding wastes and TP and Chlorophyll-a relating to the process of nutrient enrichment called eutrophication were also selected. The guidelines for water-quality control and management after weir construction including evaluation of water-quality constituents' variations can be presented by this paper.