• Title/Summary/Keyword: Risk period of damage

Search Result 125, Processing Time 0.026 seconds

An Agrometeorological Reference Index for Projecting Weather-Related Crop Risk under Climate Change Scenario (농작물의 기상재해 발생위험 판정기준 설정 및 지구 온난화에 따른 기준기상위험의 변화 전망)

  • Kim, Dae-jun;Kim, Jin-hee;Yun, Jin I.
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.18 no.3
    • /
    • pp.162-169
    • /
    • 2016
  • The agrometeorological reference index means 'the agrometeorological damage possibility' or the possibility of the normal year climate condition to damage the crop cultivation in a certain region. It is a reference used to compare the cultivation risk of a crop by region. The global climate warming is expected to increase the winter temperature. At the same time, the frequency of extreme weather events will also increase. Therefore, people pay attention to the potential of low temperature-induced damages (e.g., frost damage and injury) to fruit trees under the future climate condition. However, simple damage projection based on climate conditions does not help the climate change adaptation in the practical aspect because the climate change affects the phenology of fruit trees as well. This study predicted the phenology of the pear, peach, and apple trees by using the climate change scenarios of major regions. Furthermore, low temperature induced agrometeorological reference indices were calculated based on the effects of temperature on each plant growth stage to predict the damage possibility. It was predicted that the breaking rest would delay more in the future while the bud-burst date and flowering date will be earlier. In Daegu, Jeonju, and Mokpo, the breaking rest delayed more as time passed. The bud-burst date and flowering date of Seoul and Incheon regions were later than other regions. Seoul and Incheon showed a similar pattern, while Daegu and Jeonju revealed a similar pattern. Busan and Mokpo also showed a similar pattern. All regions were safe from the frost damage during the dormancy period. However, plants were vulnerable to frost damage between the breaking rest and the bud-burst period. Regions showed different frost damage patterns between the bud-burst period and the flowering period. During the bud-burst and flowering period, the risk level decreased in general, although the risk of some areas tended to increase.

Probabilistic earthquake risk consideration of existing precast industrial buildings through loss curves

  • Ali Yesilyurt;Seyhan O. Akcan;Oguzhan Cetindemir;A. Can Zulfikar
    • Geomechanics and Engineering
    • /
    • v.37 no.6
    • /
    • pp.565-576
    • /
    • 2024
  • In this study, the earthquake risk assessment of single-story RC precast buildings in Turkey was carried out using loss curves. In this regard, Kocaeli, a seismically active city in the Marmara region, and this building class, which is preferred intensively, were considered. Quality and period parameters were defined based on structural and geometric properties. Depending on these parameters, nine main sub-classes were defined to represent the building stock in the region. First, considering the mean fragility curves and four different central damage ratio models, vulnerability curves for each sub-class were computed as a function of spectral acceleration. Then, probabilistic seismic hazard analyses were performed for stiff and soft soil conditions for different earthquake probabilities of exceedance in 50 years. In the last step, 90 loss curves were derived based on vulnerability and hazard results. Within the scope of the study, the comparative parametric evaluations for three different earthquake intensity levels showed that the structural damage ratio values for nine sub-classes changed significantly. In addition, the quality parameter was found to be more effective on a structure's damage state than the period parameter. It is evident that since loss curves allow direct loss ratio calculation for any hazard level without needing seismic hazard and damage analysis, they are considered essential tools in rapid earthquake risk estimation and mitigation initiatives.

Analysis of change characteristics through estimating the limit rainfall by period (기간별 한계강우량 산정을 통한 변화 특성 분석)

  • Hwang, Jeong Geun;Cho, Jae Woong;Kang, Ho Seon;Lee, Han Seung;Moon, Hye Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.99-99
    • /
    • 2020
  • The frequency and scale of domestic flood damage continues to increase, but the criteria for responding to flood damage have not been established. To this end, research is underway to estimate the amount of rainfall in each region so that it can be used to respond to flood damage. The limit rainfall is defined as the cumulative maximum rainfall for each duration that causes flooding, and this research purpose to improve the threshold rainfall by estimating the damage based on the damage history in units of 5 years and analyzing changes over time. The limit rainfall based on the damage history was estimated by using the NDMS past damage history of the Ministry of the Interior and Safety and the rainfall minutes data of AWS and ASOS. The period for estimating the limit rainfall is 2013 ~ 2017, 2015 ~ 2019, and the limit rainfall is estimated by analyzing the relationship between the flood damage history and the rainfall event in each period. Considering changes in watershed characteristics and disaster prevention performance, the data were compared using 5-year data. As a result of the analysis, the limit rainfall based on the damage history could be estimated for less than about 10.0% of the administrative dongs nationwide. As a result of comparing the limit rainfall by period, it was confirmed that the area where the limit rainfall has increased or decreased This was analyzed as a change due to rainfall events or urbanization, and it is judged that it will be possible to improve the risk criteria of flooding.

  • PDF

Time-dependent seismic risk analysis of high-speed railway bridges considering material durability effects

  • Yan Liang;Ying-Ying Wei;Ming-Na Tong;Yu-Kun Cui
    • Earthquakes and Structures
    • /
    • v.24 no.4
    • /
    • pp.275-288
    • /
    • 2023
  • Based on the crucial role of high-speed railway bridges (HSRBs) in the safety of high-speed railway operations, it is an important approach to mitigate earthquake hazards by proceeding with seismic risk assessments in their whole life. Bridge seismic risk assessment, which usually evaluates the seismic performance of bridges from a probabilistic perspective, provides technical support for bridge risk management. The seismic performance of bridges is greatly affected by the degradation of material properties, therefore, material damage plays a nonnegligible role in the seismic risk assessment of the bridge. The effect of material damage is not considered in most current studies on seismic risk analysis of bridges, nevertheless. To fill the gap in this area, in this paper, a nonlinear dynamic time-history analysis has been carried out by establishing OpenSees finite element model, and a seismic vulnerability analysis is carried out based on the incremental dynamic analysis (IDA) method. On this basis, combined with the site risk analysis, the time-dependent seismic risk analysis of an offshore three-span HSRB in the whole life cycle has been conducted. The results showed that the seismic risk probabilities of both components and system of the bridge increase with the service time, and their seismic risk probabilities increase significantly in the last service period due to the degradation of the material strength, which demonstrates that the impact of durability damage should be considered when evaluating the seismic performance of bridges in the design and service period.

The conditional risk probability-based seawall height design method

  • Yang, Xing;Hu, Xiaodong;Li, Zhiqing
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.7 no.6
    • /
    • pp.1007-1019
    • /
    • 2015
  • The determination of the required seawall height is usually based on the combination of wind speed (or wave height) and still water level according to a specified return period, e.g., 50-year return period wind speed and 50-year return period still water level. In reality, the two variables are be partially correlated. This may be lead to over-design (costs) of seawall structures. The above-mentioned return period for the design of a seawall depends on economy, society and natural environment in the region. This means a specified risk level of overtopping or damage of a seawall structure is usually allowed. The aim of this paper is to present a conditional risk probability-based seawall height design method which incorporates the correlation of the two variables. For purposes of demonstration, the wind speeds and water levels collected from Jiangsu of China are analyzed. The results show this method can improve seawall height design accuracy.

Risk assessment for inland flooding in a small urban catchment : Focusing on the temporal distribution of rainfall and dual drainage model (도시 소유역 내 내수침수 위험도 평가 : 강우 시간분포 및 이중배수체계 모형을 중심으로)

  • Lee, Jaehyun;Park, Kihong;Jun, Changhyun;Oh, Jeill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.35 no.6
    • /
    • pp.389-403
    • /
    • 2021
  • In this study, dual drainage system based runoff model was established for W-drainage area in G-si, and considering the various rainfall characteristics determined using Huff and Mononobe methods, the degree of flooding in the target area was analyzed and the risk was compared and analyzed through the risk matrix method. As a result, the Monobe method compared to the Huff method was analyzed to be suitable analysis for flooding of recent heavy rain, and the validity of the dynamic risk assessment considering the weight of the occurrence probability as the return period was verified through the risk matrix-based analysis. However, since the definition and estimating criteria of the flood risk matrix proposed in this study are based on the return period for extreme rainfall and the depth of flooding according to the results of applying the dual drainage model, there is a limitation in that it is difficult to consider the main factors which are direct impact on inland flooding such as city maintenance and life protection functions. In the future, if various factors affecting inland flood damage are reflected in addition to the amount of flood damage, the flood risk matrix concept proposed in this study can be used as basic information for preparation and prevention of inland flooding, as well as it is judged that it can be considered as a major evaluation item in the selection of the priority management area for sewage maintenance for countermeasures against inland flooding.

Determination of the Cold Weather Concreting Period and Early Frost Damage Risk Using Climate Data of Korea (기상자료를 이용한 우리나라 한중콘크리트 적용기간과 초기동해 위험일 산정)

  • Han, Min-Cheol;Lee, Jun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.73-81
    • /
    • 2017
  • In this paper, the periods of cold weather concrete and early frost damage depending on each region in South Korea were studied using the climate data from Korea meteorological administration. The specifications of Korea Concrete Institute(KCI) and Architectural Institute of Japan(AIJ) were applied to provide the periods of cold weather concrete. The periods of early frost damage risk(EFD) were calculated by Hasegawa's suggestion depending on 91 cities in Korea. Climate data for 5 years (2008~2012) were used to obtain both of the periods. Existing data from 1971 to 2000 were also used to compare differences in the periods between past and present study. The periods of cold weather concrete by KCI were calculated about 98 days on average. As the latitude goes up and close to mountain areas, the periods tend to be increased. The periods by present study was shown to be reduced compared to that of previous study by 1~2days. The period of EFD was provided with the level of daily lowest temperature from $-5^{\circ}C$, $-2^{\circ}C$ and $0^{\circ}C$. The beginning day of the period of EFD was earlier than the period of cold weather concrete and the finishing day of the period of EFD was later than the period of cold weather concrete.

Insights from existing earthquake loss assessment research in Croatia

  • Hadzima-Nyarko, Marijana;Sipos, Tanja Kalman
    • Earthquakes and Structures
    • /
    • v.13 no.4
    • /
    • pp.365-375
    • /
    • 2017
  • Seismic risk management has two main technical aspects: to recommend the construction of high-performance buildings and other structures using earthquake-resistant designs or evaluate existing ones, and to prepare emergency plans using realistic seismic scenarios. An overview of seismic risk assessment methodologies in Croatia is provided with details regarding the components of the assessment procedures: hazard, vulnerability and exposure. For Croatia, hazard is presented with two maps and it is expressed in terms of the peak horizontal ground acceleration during an earthquake, with the return period of 95 or 475 years. A standard building typology catalogue for Croatia has not been prepared yet, but a database for the fourth largest city in Croatia is currently in its initial stage. Two methods for earthquake vulnerability assessment are applied and compared. The first is a relatively simple and fast analysis of potential seismic vulnerability proposed by Croatian researchers using damage index (DI) as a numerical value indicating the level of structural damage, while the second is the Macroseismic method.

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

A case study for determination of seismic risk priorities in Van (Eastern Turkey)

  • Buyuksarac, Aydin;Isik, Ercan;Harirchian, Ehsan
    • Earthquakes and Structures
    • /
    • v.20 no.4
    • /
    • pp.445-455
    • /
    • 2021
  • Lake Van Basin, located in Eastern Turkey, is worth examining in terms of seismicity due to large-scale losses of property and life during the historical and instrumental period. The most important and largest province in this basin is Van. Recent indicators of the high seismicity risk in the province are damage occurring after devastating earthquakes in 2011 (Mw=7.2 and Mw=5.6) and lastly in 2020 Khoy (Mw=5.9). The seismic hazard analysis for Van and its districts in Eastern Turkey was performed in probabilistic manner. Analyses were made for thirteen different districts in Van. In this study, information is given about the tectonic setting and seismicity of Van. The probabilistic seismic hazard curves were obtained for a probability of exceedance of 2%, 10% and 50% in 50-year periods. The PGA values in the Van province vary from 0.24 g - 0.43 g for earthquakes with repetition period of 475 years. Risk priorities were determined for all districts. The highest risk was calculated for Çaldıran and the lowest risk was found for Gürpınar. Risk priorities for buildings in all districts were also determined via rapid seismic assessment for reinforced-concrete and masonry buildings in this study.