Recently the railway safety is very important issue in Korea because there are lots of changes like the separation of operation and facility of national rail network, the inauguration of high speed train and Daegu subway fire accident. Railway safety management system is based on risk assessment of rolling stocks, electrical system, signaling, operation & maintenance and human element. With this process, railway risk will be reduced as low as reasonably acceptable level. Through risk assessment on accident data, this study predicted the current risk level of railway electrical system and presented the proper safety ensuring measures.
A two-plan sampling system is proposed for a failure-censored life testing when the lifetime follows a Weibull distribution with known shape parameter. The proposed sampling system is based on a switching rule, for switching between the tightened and the normal inspection levels when lots are submitted for inspection in the order of production or in some other systematic way. The design parameters of the proposed sampling system are determined by the two-point approach considering the producer's risks and the consumer's at the specified acceptable reliability level and the lot tolerance reliability level, respectively. It has been observed that the proposed system requires only a single failure for the observation.
Journal of Korea Society of Digital Industry and Information Management
/
v.6
no.4
/
pp.307-317
/
2010
The majority of financial and general business organizations have had individual damage from hacking, worms, viruses, cyber attacks, internet fraud, technology and information leaks due to criminal damage. Therefore privacy has become an important issue in the community. This paper examines various elements of the information security management system and discuss about Information Security Management System Models by using the analysis of the financial statue and its level of information security assessment. These analyses were based on the Information Security Management System (ISMS) of Korea Information Security Agency, British's ISO27001, GMITS, ISO/IEC 17799/2005, and COBIT's information security architecture. This model will allow users to manage and secure information safely. Therefore, it is recommended for companies to use the security management plan to improve the companies' financial and information security and to prevent from any risk of exposing the companies' information.
Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.1
/
pp.118-123
/
2015
There have been various studies on measurements of flood risk and forecasting models. For river and dam region, PDF and FVI has been proposed for measurement of flood risk and regression models have been applied for forecasting model. For Bo region unlikely river or dam region, flood risk would unexpectedly increase due to outgoing water to keep water amount under the designated risk level even the drain system could hardly manage the water amount. GFI and general linear model was proposed for flood risk measurement and forecasting model. In this paper, FVI with the consideration of duration on GFI was proposed for flood risk measurement at Bo region. General linear model was applied to the empirical data from Bo region of Nadong river to derive the forecasting model of FVI at three different values of Base High Level, 2m, 2.5m and 3m. The significant predictor variables on the target variable, FVI were as follows: ground water level based on sea level with negative effect, difference between ground altitude of ground water and river level with negative effect, and difference between ground water level and river level after Bo water being filled with positive sign for quantitative variables. And for qualitative variable, effective soil depth and ground soil type were significant for FVI.
Park, Hee Won;Zhang, Chang Ik;Kwon, You Jung;Seo, Young Il;Oh, Taeg-Yun
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.49
no.4
/
pp.469-482
/
2013
This study identified problems of the existing ecosystem-based fisheries assessment approach, and suggested new methods for scoring risk and for the estimation of fishery risk index. First, risk scores of zero to two for target and limit reference points for each indicator were replaced by those of zero to three, and the risk scores were calculated from new formulae which were developed in this study. Second, a new method for estimating fishery risk index (FRI) was developed in this study, considering the level of indicators. New method was applied to the Korean large purse seine fishery, large pair trawl fishery and drag net fishery. More precise and detailed risk scores were obtained from the new method, which can explain the risks by the wider range of both risk levels for 'better than target' and 'beyond limit'. The new method for estimating FRI could avoid the basic problem related with duplicated computations of fishery-level indicators, which improved the estimated FRI to be more accurate. Also, a method for estimating variance of FRI using the bootstrap was proposed in this study.
Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
Journal of Korean Academy of Fundamentals of Nursing
/
v.21
no.4
/
pp.380-391
/
2014
Purpose: This was a descriptive research study to examine the patient safety risk factors and the level of safety management of nurses in emergency service, hospitals and to analyze the relationship between the two factors. Method: Data for analysis were collected from 232 nurses in emergency service, hospitals in Busan and Gyeongnam from July 30 to September 7, 2013. Data were analyzed using descriptive statistics, t-test, one-way ANOVA, and Pearson correlation coefficients. Results: Therapeutic agents showed the highest risk level. The prevention of transfusion errors showed the highest performance. As the nurses were working in regional emergency medical centers and received education more than 7 sessions on patient safety, they readily recognized the riskiness of the safety risk factors. In addition, as the nurses were older than 40, married, having more education about safety and understood the incident report registration system well, they performed safety management better. There were significant correlations between perception of the patient safety risk factors and performance for safety management. Conclusion: Nurses in emergency service, hospitals should try to improve safety management to reduce the risk factors shown to be higher based on the results and ensure the patient safety.
This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons
The Journal of the Korea institute of electronic communication sciences
/
v.18
no.4
/
pp.555-562
/
2023
The Railway Safety Act of 2014 strengthened the 'Railway Safety Management System' to establish autonomous safety management for railway operators and railway facility managers. Accordingly, it is required to establish and implement risk assessment and safety measures for risk management. However, the current risk assessment system is carried out at the fragmented safety management level within individual fields, which has caused difficulties in establishing and implementing risk assessment and safety measures. In addition, the technical standards of the safety management system stipulate that risk assessment of railway operators is mandatory, so standardized standards for risk assessment of railway facilities and railway vehicle maintenance are needed. Therefore, in this paper, we first verified railway risks by analyzing railway accident data for the last 10 years, and proposed a standardized framework to effectively assess and manage risks through a case study of a condition-based smart maintenance system developed based on railway vehicle maintenance data.
In the event of continued train operation being impossible as the result of a breakdown, it will be essential to dispatch a relief train to recover the broken down train. Operation of relief train carries with the risk of collision in the process of connection with broken down train. The present study looks at the suitability of risk management procedures and associated problems in the light of case studies of relief train operation, and of national legal standards and railroad company regulations. It looks at appropriate methods of risk management and the problems that can arise. Based on the study a method is proposed of operating the relief train which is consistent with appropriate risk management. The proposed method will improve the safety of relief train operation, It is hoped that the results of the study will be reflected in relevant laws and operating company regulations, and so contribute to enhancing the overall level of railroad safety.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.