• Title/Summary/Keyword: Risk level based management system

Search Result 214, Processing Time 0.027 seconds

A Study on the Improvement of the TRA Framework for Complex Weapon Systems from the System Integration Perspective (시스템 통합 관점의 복합 무기체계 기술성숙도 평가 프레임워크 개선에 관한 연구)

  • Jiin Koo;Sukjae Jeong
    • Journal of The Korean Institute of Defense Technology
    • /
    • v.5 no.2
    • /
    • pp.23-30
    • /
    • 2023
  • TRA(Technology Readiness Assessment) quantitatively assesses the current level of domestic technology and is used as a key tool for determining the possibility of domestic R&D and risk management. However, since the current TRA utilizes hardware-oriented TRL(Technology Readiness Level), it is suitable for independent assessment of each technologies, but has limitations in evaluation from a system integration perspective. In addition, the checklist-based assessment is highly likely to involve subjective evaluation. This study proposes an enhanced TRA framework by redefining TRA procedures and criteria from the systems integration perspective of system engineering. We focused on developing a framework that overcomes the limitations of the current TRL/TRA and enables easier and more intuitive assessment. The proposed framework distinguishes between TE(Technology Element) and CTE(Critical Technology Element) in terms of HW, SW and interface and redefines TRL. TRA is performed according to the TRL redefined from the above three points of view, and the lowest evaluation value is used as system maturity level in consideration of risk management. The proposed CTE selection method minimizes the intervention of the evaluator by utilizing the quantitative goal of the key ROC(Required Operational Capability), development difficulty, and application of COTS(Common Off The Shelf) technology. The effectiveness of this framework was confirmed through a case study of the TSS(Target Surveillance System). It is hoped that starting with this study, research at the framework level will be activated and contribute to the improvement of the TRA system.

  • PDF

An Empirical Study on the Effect of International Standards Management System Integration on Business Performance - Focused on Quality, Environment and Health & safety management system- (국제표준 경영시스템 통합이 경영성과에 미치는 영향에 대한 실증적 연구 - 품질, 환경 및 안전·보건 경영시스템 중심으로 -)

  • Kim, Yeun Sung;Suk, Ho Sam;Sung, Do Kyong
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.4
    • /
    • pp.781-810
    • /
    • 2017
  • Purpose: This paper studied about the integration for management system of representative international standard related to sustainable development. The well-known International standards such as ISO 9001, ISO 14001 and OHSAS 18001 (ISO 45001) can be operated in accordance with the organizational situation individually, or in a variety of ways of integration. It can be applied to help organizations utilizing the newly established "ISO IEC Directive Part1 Annex SL", when integrating quality, environmental and safety & health management systems based on international standards. Methods: We conducted an empirical survey of management executives and experts to study how three factors (management systems, organizational capabilities and integration methods) could affect business performance. Results: The questionnaire was analyzed using AMOS structural equation model. Quality, environmental and safety and health management systems affected management performance, and integration methods of management system affected business efficiency, risk performance and financial performance. Integration method is also important because organizational competence affects various aspects of integrated management. However, factors that affect integration should also be considered in terms of organizational capabilities. This is because organizational capacity influences the integration plan. Conclusion: To integrate the document system at the strategic level, management should actively participate in integrated operations to integrate organizations, eliminate duplicate tasks, and foster document integration experts to reflect the characteristics of individual standard. In the case of document integration, quality management is focusing, but once ISO 45001 is issued, the use of Annex SL is increasing, and Quality, environment and safety & health integration will also be expanded. It is possible to increase the effect of integration by strategically approaching and establishing organization document system rather than simple integration according to management system standard arrangement.

An Empirical Analysis on ISO 9001:2015 Transition Audits (ISO 9001:2015 전환심사의 실증적 분석)

  • Park, Dong Joon;Yoon, Min;Kang, Byung Hwan;Kim, Ho Gyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.70-80
    • /
    • 2018
  • The International Organization for Standardization (ISO) published ISO 9001 Quality Management System (QMS)-Requirements in 1987 and has revised four times since then. ISO 9001:2015 is the latest edition. This latest edition has two most noticeable changes. The first major change of new edition focuses on performance with an emphasis on Risk-Based Thinking (RBT) to enhance the process approach. The new edition consists of ten clauses whose first three clauses are largely same as older edition but risks are clearly stated and stressed in last seven clauses, emphasizing on Plan-Do-Check-Act cycle at all levels in the organization. The second major change is that the new edition has the same overall structure as other ISO management system standards known as High Level Structure (HLS) with Annex SL. The companies obtained the certificate of new ISO 9001:2015 QMS by September 15, 2018 in order to maintain as an ISO QMS registered firm. In this article we collected transition audit data from more than 100 companies that registered ISO 9001:2015 QMS for recent three years. We performed a statistical analysis to disclose the relationships between the characteristics of companies and the minor nonconformities found in ISO 9001:2015 requirements during transition audit processes. We also aim to interpret the findings and deduce the implications of the statistical results.

Development of Stand-Alone Risk Assessment Software for Optimized Maintenance Planning of Power Plant Facilities (발전설비 최적 정비를 위한 독립형 위험도 평가 소프트웨어 개발)

  • Choi, Woo Sung;Song, Gee Wook;Kim, Bum Shin;Chang, Sung Ho;Lee, Sang Min
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.11
    • /
    • pp.1169-1174
    • /
    • 2015
  • Risk-Risk-based inspection (RBI) has been developed in order to identify risky equipments that can cause major accidents or damages in large-scale plants. This assessment evaluates the equipment's risk, categorizes their priorities based on risk level, and then determines the urgency of their maintenance or allocates maintenance resources. An earlier version of the risk-based assessment software is already installed within the equipment management system; however, the assessment is based on examination by an inspector, and the results can be influenced by his subjective judgment, rather than assessment being based on failure probability. Moreover, the system is housed within a server, which limits the inspector's work space and time, and such a system can be used only on site. In this paper, the development of independent risk-based assessment software is introduced; this software calculates the failure probability by an analytical method, and analyzes the field inspection results, as well as inspection effectiveness. It can also operate on site, since it can be installed on an independent platform, and has the ability to generate an I/O function for the field inspection results regarding the period for an optimum maintenance cycle. This program will provide useful information not only to the field users who are participating in maintenance, but also to the engineers who need to decide whether to extend the lifecycle of the power machinery or replace only specific components.

Highway Bridge Inspection Period Based on Risk Assessment (위험도평가에 의한 고속도로 교량의 점검주기)

  • Lee, Il-Keun;Kim, Dong-Hyawn
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.64-72
    • /
    • 2015
  • Risk Based Inspection (RBI) Period was proposed for highway bridges in Korea. Hazard factors affecting bridge condition deterioration were found by analyzing condition data from Highway Bridge Management System (HBMS). Certain level of correlations between those factors and condition deterioration were found. They are used to evaluate hazard score. Summarizing several hazard factors, final hazard is classified as three level;high, moderate, low. Vulnerability is assessed only by the current state of bridge. Then, risk matrix is suggested for inspection periods. Inspection periods of the bridges with grade C, D, and E are maintained the same as before. But, those of grade A and B with moderate and high hazard score are elongated to maximum 6 years while the maximum inspection period is three years at present. By adjusting inspection period according to risk assessment, it was shown that 27% of average inspection manpower can be saved.

A Development of a Predictive Model Using the Data Mining Technique on Diabetes Mellitus (데이터마이닝 기법을 이용한 당뇨 발생 예측모형 개발)

  • Lee Ae-Kyung;Park Il-Su;Kang Seoung-Hong;Kang Hyn-Chul
    • Health Policy and Management
    • /
    • v.16 no.2
    • /
    • pp.21-48
    • /
    • 2006
  • As prior studies indicate that chronic diseases are mainly attributed to health behavior, preventive health care rather than treatment for illness needs to improve health status. Since chronic conditions require long-term therapy, health care expenditures to treat chronic diseases have been substantial burden at national level. In this point of view, this study suggests that the health promotion program should be based on Knowledge Based System Using Data Mining Technique, we developed a predictive model for preventive healthcare management on diabetes mellitus. Generally, in the outbreak of diabetes mellitus there is a difference in lifestyle and the risk factors according to gender. So we developed a predictive model in accordance with gender difference and applied the Logistic Regression Model based on Data Mining process. The result of the study were as follow. The lift of the last predictive model was an average 2.23 times(male model : 2.13, female model 2.33) more improved than in the random model in upper 10% group. The health risk factors of diabetes mellitus are gender, age, a place of residence, blood pressure, glucose, smoking, drinking, exercise rate. On the basis of these factors, we suggest the program of the health promotion.

A study on the vessel traffic safety assessment of Busan Harbor (부산항내 선박통항 안전성 평가에 관한 연구)

  • KIM, Won-Ouk;KIM, Dae-Hee;KIM, Seok-Jae
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.53 no.4
    • /
    • pp.423-429
    • /
    • 2017
  • As invigoration plan of the marine tourism, Busan City has the plan to operate the cruise ship inside of the harbor, but the area has narrow water way with heavy traffic. As a result it is requested to evaluate the safety for the preparation of actual navigation. In this study, the Ship Handling Simulation (SHS) Assessment was conducted, which is regulated by the Maritime Traffic Safety Audit Scheme (MTSAS) in compliance with the Marine Safety Law and the Maritime Traffic Risk Assessment System based on the Electronic Chart Display and Information System (ECDIS). The proximity assessment, control assessment and subjective assessment were implemented, which is enacted by the Marine Safety Law by using the SHS. In the case of proximity assessment, the probability of trespass was not analyzed. As the control assessment, the swept path was measured at 11.7 m and 11.5 m for port entry and port departure respectively, which exceeded the width of the model vessel, 10.4 m over; it was considered as a marginal factor. As a result of the subjective evaluation of the navigator, there would be no difficulty on ship maneuvering by paying particular attention to the mooring vessel nearby the Busan Bridge and Yeongdo Bridge as well as the coming vessel from the invisible sea area when the vessel is entering and departing the port. The Marine Traffic Risk Assessment System analyzed as [Cautious] level until the vessel passed the Busan bridge and the curved area at 5 kts and it became to [Dangerous] level from where it left 75 m to the Busan Bridge. When the vessel passed the Busan Bridge and the curved area at 10 kts and entered the narrow area, it indicated the [Dangerous] level and became to [Very dangerous] level from where it left 410 m to the Busan bridge. In conclusion, the vessel should maintain at the speed of 5 kts to reduce the risk when it passes this area.

Risk Management for Ammonia Unloading and Storage Tank Facility (암모니아 입하 및 저장시설에서의 위험도 관리)

  • Jeong, Yun Seo;Woo, In Sung;Lim, Jong Woo
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.5
    • /
    • pp.95-103
    • /
    • 2017
  • A lot of hazardous materials have been used for product processing and utility plant. Many accidents including toxic release, fire and explosions occur in the ammonia related facility and plant. Various safety and environment management program including PSM, SMS, ORA etc. are being implemented for risk management and accident prevention in the production industry. Also much study and research have been carried about risk assessment of accident scenario in the academic and research area. In this paper, firstly risk level was assessed by using a typically used KORA program and LOPA PFD method for the selected ammonia unloading and storage facility. And then risk reduction measures for the risk assessed facility were studied in 3 aspects and some measures were proposed. Those Risk Reduction measures are including a leak detection and emergency isolation, water spray, dilution tank, dike and trench, scattering protection in hardware impovement aspect, and a applicable risk criteria, conditional modifier for existing LOPA PFD, alternative supporting modeling program in risk estimation methodology aspect, and last RBPS(Risk Based Process Safety) program, re-doing of process hazard analysis, management system compliance audit in managerial activity aspect.

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

A Study on the Analysis and Classification of Types and Causes of Railway Accidents (철도사고 위험분류 및 원인분석에 관한 연구)

  • Park Chan-Woo;Park Joo-Nam;Wang Jong-Bae;Cho Yun-ok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.599-604
    • /
    • 2005
  • As a public transportation possible to convey a large quantity, the railway is safe and keeps time, but it has hazards to cause a disaster if the accidents such as collision, derailment, and fire occur. So advanced countries carry out System Safety Plan with various program activities which have connected orders to maintain or improve safety level by finding hazards, evaluation, taking measures and practice, and improving problems. Especially they systematically manage hazards to cause railway accidents and the factors which possibly threat safety, using national classification of risk and causes with analysis of the related data such as establishing accident/incident data and safety regulations/standards. As executing railway safety regulations, domestic railway is currently trying to improve railway safety management system. The research of classification system of accidents/incidents is one thing to make railway safety management systems better. In this research, we reviewed hazardous factors of railway systems and classification of the causes as the beginning of system safety management, and we conducted study on development of railway accident classification based on findings of this research. The results are able to be used in identifying hazards and activities of systemic safety management at the step of railway accident report and investigation.

  • PDF