Development of Stand-Alone Risk Assessment Software for Optimized Maintenance Planning of Power Plant Facilities |
Choi, Woo Sung
(Power Generation Laboratory, KEPCO Research Institute)
Song, Gee Wook (Power Generation Laboratory, KEPCO Research Institute) Kim, Bum Shin (Power Generation Laboratory, KEPCO Research Institute) Chang, Sung Ho (Power Generation Laboratory, KEPCO Research Institute) Lee, Sang Min (Power Generation Laboratory, KEPCO Research Institute) |
1 | Torigoe, M., Saito, N., Tarimi,K., Okatsuka, Y., Fuji, A. and Kihara, S., 2002, "Maintenance Planning and Cost Reduction by RBM Techniques in Fossil-Fired Power Boilers," Risk Based Management of Power Plant Equipment Seminar, ETD, pp.9-15 |
2 | Song, G. W., Kim, B. S., Choi, W. S., Park, M. S., 2013, "Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plant," Trans. Korean Soc. Mech. Eng. A, Vol. 37, No.10, pp.1291-1296 DOI ScienceOn |
3 | KEPIC, 2014, "Inspectio Planning Using Risk Based Method - Boiler/Piping ," MMI-1 |
4 | Choi, W. S., Song, G. W., Chang, S. H., Park, M. S. and Lee, S. M., 2014, "Evaluation of Boiler Tube Failure Probability Considering Thinning Damage," KSME Spring Conference, Vol. 34, No. 9, pp.1265-1272 |
5 | Choi W.S., Song G.W., Chang S. H., Lee S.M.,2014, " Verification and Application of Risk Assessment for Predictive Maintenance," KEPRI report, TR.9336.S2014.0559 |
6 | HITACHI, 2013, "Risk-Based Maintenance(RBM) Assessment Report," KCM 3761 |
7 | KEPRI, 2014, HRBM User manual |