• Title/Summary/Keyword: Risk assessment system

Search Result 1,366, Processing Time 0.026 seconds

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF

Risk Assessment for Performance Evaluation System of Hydrogen Refueling Station (수소충전소 성능평가 장비 안전성 평가 연구)

  • KANG, SEUNGKYU;LEE, DONGHOON
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.3
    • /
    • pp.232-239
    • /
    • 2022
  • This study performed qualitative and quantitative risk assessment of equipment for evaluating the protocol of hydrogen refueling stations and suggested measures to improve safety. Hazard and operability study was performed for qualitative risk assessment, and Hy-KoRAM was used for quantitative risk assessment. Through a qualitative risk assessment, additional ventilation devices were installed, simultaneous venting of the storage container was prohibited, and the number of repeated refilling of the evaluation equipment was identified to manage the number of fillings of the container. Through quantitative risk assessment, the area around the device was set as a restricted area when evaluating the station, and measures were suggested to reduce the frequency of accidents.

Development of Risk Assessment System for Steel and Iron Works (제철 사업장 적용을 위한 위험성평가 시스템 개발)

  • Hong, Sung-Man;Park, Peom;Sun, Su-Bin
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.7-14
    • /
    • 2009
  • Steel and iron works have place many hazard or risk factor as a high temperature material, a high place, and so on. Accordingly, steel and iron works need system for risk assessment. In this paper, we development of risk assessment system for steel and iron works. In case study applied at the steel enterprise. The resultant, we can discovery that an human factor is an important question form risk assessment.

Discussion for Improvement of Decision System of Total Risk in Off-site Risk Assessment (화학사고 장외영향평가 제도의 종합위험도 결정 체계 개선을 위한 고찰)

  • Choi, Woosoo;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Jung, Jinhee;Lee, Jieun;Kim, Jungkon;Baek, Jongbae;Yoon, Junheon;Ryu, Jisung
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.3
    • /
    • pp.217-226
    • /
    • 2018
  • Objectives: Despite the positive effects of Off-site risk assessment (ORA) system such as prevention of chemical accidents, some problems have been constantly raised. The purpose of this study is to analyze the problems that have occurred through the implementation of the ORA system for the past three years and to suggest reasonable directions for improvement in the future. Methods: In order to identify the problems with the methodology and procedure of ORA system, we analyzed statutes, administrative rules and documents related to the ORA system. A survey of ORA reviewers in National Institute of Chemical Safety was conducted to investigate the weight of determinants considered when judging the level of total risk in ORA. Results: In this study, we found out the uncertainty of the estimation of the number of people in the impact range in the procedure of the risk assessment of individual handling facilities, the lack of quantitative risk analysis methods for environmental receptors, and the ambiguity of the criteria for the total risk. In addition to suggesting solutions to the problems mentioned above, we also, suggested a decision tree for total risk in ORA. Conclusion: We anticipate that the solutions including the systematic decision tree for total risk suggested will contribute to the smooth operation of the ORA system.

Study on Theoretical Models of Regional Humanity Lung Cancer Hazards Assessment

  • Zhang, Chuan;Gao, Xing
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.5
    • /
    • pp.1759-1764
    • /
    • 2015
  • Purpose: To establish the concept of lung cancer hazard assessment theoretical models, evaluating the degree of lung cancer risk of Beijing for regional population lung cancer hazard assessment to provide a basis for technical support. Materials and Methods: ISO standards were used to classify stratified analysis for the entire population, life cycle, processes and socioeconomic management. Associated risk factors were evaluated as lung cancer hazard risk assessment first class indicators. Study design: Using the above materials, indicators were given the weight coefficients, building lung cancer risk assessment theoretical models. Regional data for Beijing were entered into the theoretical model to calculate the parameters of each indicator and evaluate the degree of local lung cancer risk. Results: Adopting the concept of lung cancer hazard assessment and theoretical models for regional populations, we established a lung cancer hazard risk assessment system, including 2 first indicators, 8 secondary indicators and 18 third indicators. All indicators were given weight coefficients and used as information sources. Score of hazard for lung cancer was 84.4 in Beijing. Conclusions: Comprehensively and systematically building a lung cancer risk assessment theoretical model for regional populations in conceivable, evaluating the degree of lung cancer risk of Beijing, providing technical support and scientific basis for interventions for prevention.

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

Development of a Product Risk Assessment System using Injury Information in Korea Consumer Agency (한국소비자원 위해정보를 활용한 제품 리스크 평가시스템 개발)

  • Suh, Jungdae
    • Journal of Digital Convergence
    • /
    • v.15 no.4
    • /
    • pp.181-190
    • /
    • 2017
  • Recently, safety accidents of daily necessities such as humidifier disinfectant, mobile phones, and infant diapers, have occurred frequently. To protect consumers from these accidents, product safety management is required, and a product risk assessment tool is needed to evaluate the degree of safety of the product. In this paper, we have constructed RAS, which is a system that can evaluate product risk based on injury information of product accident in Korea Consumer Agency. RAS consists of an injury information analysis system for analyzing accident-related information and a risk assessment system for assessing risk using information derived from the system. The Bayesian network - based probabilistic method is applied to reflect the causal relationships that affect product risk in the risk assessment process. We used RAS to evaluate 33 children's products and compared them with the results of EU RAPEX RAG. Subsequent tasks include reducing the subjectivity of the input of the accident impact scale, and linking the above two systems.

Identification an Improvement Plan for the Risk Assessment System to Increase the Reduction Rate of Industrial Accidents : Focus on Small and Medium-size Companies (산업재해 감소율 제고를 위한 위험성평가 제도의 개선 방안 도출 : 중소규모 사업장을 중심으로)

  • Song, Ho-Jun;Kim, Beom-Su;Shin, Jong-Gyu;Kim, Sang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.25-32
    • /
    • 2022
  • The rate of industrial accident reduction is slowing down as the attention of the Ministry of Employment and Labor and related agencies on risk assessment systems decreased. this paper focuses on weakness of legal system for the risk assessment in recent years. A survey was conducted to identify the status and condition of the risk assessment system applying on small and medium-sized manufacturing companies. A set of questionnaires is designed to reflect various perspectives of the companies regarding the problems and solutions of the system. The results refer that differentiated instructions and support systems in response to the actual conditions of the companies are mandatory to reinforce the efficiency of risk assessment system.

A Basic Study on the Risk Assessment of Domestic Construction Companies (국내 건설업체의 위험성평가 실태조사 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF