• Title/Summary/Keyword: Risk Management Model

Search Result 1,698, Processing Time 0.027 seconds

A Study on The Determinants of New Product Development Performance (신제품개발성과에 영향을 미치는 요인연구)

  • Lee, Kwang-Soo;Ree, Min-Ho;Ree, Sang-Bok
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2010.04a
    • /
    • pp.310-320
    • /
    • 2010
  • In this study, factors affecting the development of new products and research about the relevance of the factors based on the research model was configured. Existing research and technology commercialization process of discrimination that occur in the importance of risk management and open innovation company's competitive advantage in new product development and affect the reporter know what the effect is used as a control variable effects. Factor in the development of new products through research and innovation capacity and knowledge management activities, the introduction of open innovation and enterprise level ever due to the level of risk management controls and the need for effective research to study the model was proposed.

  • PDF

The Mitigation Model Development for Minimizing IT Operational Risks (IT운영리스크 최소화를 위한 피해저감모델 구현에 관한 연구)

  • Lee, Young-Jai;Hwang, Myung-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.95-113
    • /
    • 2007
  • To minimize IT operational risks and the opportunity cost for lost business hours. it is necessary to have preparedness in advance and mitigation activities for minimization of a loss due to the business discontinuity. There are few cases that banks have a policy on systematic management, system recovery and protection activities against system failure. and most developers and system administrators response based on their experience and the instinct. This article focuses on the mitigation model development for minimizing the incidents of disk unit in IT operational risks. The model will be represented by a network model which is composed of the three items as following: (1) the risk factors(causes, attributes and indicators) of IT operational risk. (2) a periodic time interval through an analysis of historical data. (3) an index or an operational regulations related to the examination of causes of an operational risk. This article will be helpful when enterprise needs to hierarchically analyze risk factors from various fields of IT(information security, information telecommunication, web application servers and so on) and develop a mitigation model. and it will also contribute to the reduction of operational risks on information systems.

  • PDF

Risk Factors Analysis and Quantitative Risk Assessment Model for Tunnel Construction Project (터널 건설 프로젝트 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Jeong, Seung-A;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.363-364
    • /
    • 2023
  • The tunnel construction projects is demanded more efficient risk management measures and loss forecasts to prepare for risk losses from an increase in the trend of tunnel construction. This study aims to analyze the risk factors that caused the loss of material in actual tunnel construction and to develop a quantified predictive loss model, based on the past loss record of tunnel construction projects.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Effect of Supply Chain Risk Management Factors on Risk Management Strategy and Corporate Performance (공급사슬관리 리스크 요인이 위험관리전략과 기업성과에 미치는 영향)

  • Lee, Choong-Bae;Kim, Hyun-Chung
    • Journal of Korea Port Economic Association
    • /
    • v.36 no.3
    • /
    • pp.55-74
    • /
    • 2020
  • With globalization and the development of information and communication technology, the supply chain is becoming more widespread and complex, which increases the occurrence and damage caused by supply chain risks. Supply chain risk management has a great impact on corporate performance through the analysis of risk factors and proactive and strategic approaches. This study aims to analyze the effects of supply chain risk factors on risk management strategies and corporate performance empirically. In the research model for empirical analysis, supply chain risk factors were classified into supply, demand, operation, network, and external environment, while the risk management strategies were divided into active and passive strategies, as well as financial and operational performance for corporate performance. The data obtained via the questionnaire were analyzed for the path of the structural equation model. As a result of the analysis, companies are actively pursuing risk management for internal risk factors, rather than external factors, in terms of internal and external risk factors, and it was found that these strategies have a significant effect on corporate performance. Therefore, in the future, companies should conduct risk management strategies more proactively and preemptively through a thorough analysis of various risk factors affecting business operations.

An Improved Multilevel Fuzzy Comprehensive Evaluation to Analyse on Engineering Project Risk

  • LI, Xin;LI, Mufeng;HAN, Xia
    • The Journal of Economics, Marketing and Management
    • /
    • v.10 no.5
    • /
    • pp.1-6
    • /
    • 2022
  • Purpose: To overcome the question that depends too much on expert's subjective judgment in traditional risk identification, this paper structure the multilevel generalized fuzzy comprehensive evaluation mathematics model of the risk identification of project, to research the risk identification of the project. Research design, data and methodology: This paper constructs the multilevel generalized fuzzy comprehensive evaluation mathematics model. Through iterative algorithm of AHP analysis, make sure the important degree of the sub project in risk analysis, then combine expert's subjective judgment with objective quantitative analysis, and distinguish the risk through identification models. Meanwhile, the concrete method of multilevel generalized fuzzy comprehensive evaluation is probed. Using the index weights to analyse project risks is discussed in detail. Results: The improved fuzzy comprehensive evaluation algorithm is proposed in the paper, at first the method of fuzzy sets core is used to optimize the fuzzy relation matrix. It improves the capability of the algorithm. Then, the method of entropy weight is used to establish weight vectors. This makes the computation process fair and open. And thereby, the uncertainty of the evaluation result brought by the subjectivity can be avoided effectively and the evaluation result becomes more objective and more reasonable. Conclusions: In this paper, we use an improved fuzzy comprehensive evaluation method to evaluate a railroad engineering project risk. It can give a more reliable result for a reference of decision making.

Reliability Management of Mechanical Ventilator in Intensive Care Unit Using FMEA Based on ISO14971 (ISO14971 기반 FMEA를 이용한 중환자실내 인공호흡기 신뢰성 관리)

  • Hyun Joon, Kim;Won Kyu, Kim;Tae Jong, Kim;Gee Young, Suh
    • Journal of Biomedical Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.19-24
    • /
    • 2023
  • Due to the spread of COVID-19, many patients with severe respiratory diseases have occurred worldwide, and accordingly, the use of mechanical ventilators has exploded. However, hospitals do not have systematic risk management, and the Medical Device Regulation also provides medical device risk management standards for manufacturers, but does not apply to devices in use. In this paper, we applied the Failure Mode Effects Analysis (FMEA) risk analysis technique based on the International Standard ISO 14971 (Medical Devices-Application of risk management to medical devices) for 85 mechanical ventilators of a specific model in use in hospitals. Failure modes and effects of each parts were investigated, and risk priority was derived through multiplication of each score by preparing criteria for severity, occurrence, and detection for each failure mode. As a result, it was confirmed that the microprocessor-based Patient Unit/Monitoring board in charge of monitoring scored the highest score with 36 points, and that reliability management is possible through systematic risk management according to priority.

Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant (원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

Korean Housing Cycle: Implications for Risk Management (Factor-augmented VAR Approach)

  • KWON, HYUCK-SHIN;BANG, DOO WON;KIM, MYEONG HYEON
    • KDI Journal of Economic Policy
    • /
    • v.39 no.3
    • /
    • pp.43-62
    • /
    • 2017
  • This paper proposes an integrated risk-management framework that includes 1) measuring the risk of credit portfolios, 2) implementing a (macro) stress test, and 3) setting risk limits using the estimated systematic latent factor specific to capture the housing market cycle. To this end, we extract information from a set of real-estate market variables based on the FAVAR methodology proposed by Bernanke, Boivin and Eliasz (2005). Then, we show the method by which the estimated systematic factor is applied to risk management in the housing market in an integrated manner within the Vasicek one-factor credit model. The proposed methodology is well fitted to analyze the risk of slow-moving and low-defaultable forms of capital, such as alternative investments.