• Title/Summary/Keyword: Risk Management Capability

Search Result 126, Processing Time 0.029 seconds

Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework (CM기업 현장운영 리스크 관리 실태 분석을 통한 효율적 관리 방안 제시)

  • Park, Kyungmo;Lee, Hyun Woo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.66-73
    • /
    • 2014
  • The Korean construction industry has been severely impacted by the 2008 global financial crisis, which resulted in a significant reduction in the overall contract amount. For survival, many construction management (CM) companies had to adapt a strategy of lowering bid prices to maintain their competitiveness. As a result of the strategy, companies faced a number of issues including their decreased capability in risk management. However, most risk management-related studies focused on construction risk management, yet these studies lacked consideration of enterprise-level risk management practices. To fill the gap, the objectives of the present study are (1) to investigate, the risk management practices of Korean CM companies, (2) to identify factors that determine efficient enterprise-level risk management practices, and (3) to propose a module for the development of enterprise-level risk management. Lastly, the efficiency of the proposed development module was validated by using a survey.

Study on the Influence of Personal Traits to the Entrepreneurial Intention - Focusing on the Mediating Effect of Globalization Capability - (개인특성이 창업의지에 미치는 영향에 관한 연구 -글로벌역량의 매개변수를 중심으로-)

  • Lee, Ru-Ri;Lee, So-Young
    • Journal of Digital Convergence
    • /
    • v.14 no.5
    • /
    • pp.217-225
    • /
    • 2016
  • This study examines whether personal traits and globalization capability would affect the entrepreneurial intention. Survey using questionnaires was conducted toward 257 male and female adults aged 21 above across the nation. The analysis of the data shows that the desire for self-fulfillment, risk-taking propensity and sense of self-efficiency as personal traits have positive influence on entrepreneurial intention. And the globalization capability as mediating variable has meaningful influence on entrepreneurial intention, that is, globalization capability under the control of respective personal trait makes positive influence on entrepreneurial intention. Current study would support the potential entrepreneur and the educator to create effective entrepreneurial education program.

Development Acceptable Risk Model for International Construction Projects - Focusing on Small and Medium Construction Companies - (해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -)

  • Hwang, Geunouk;Park, Chan Young;Jang, Woosiki;Han, Seung Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.90-97
    • /
    • 2016
  • Since Korean construction firms have steadily advanced into the international market, small and medium construction companies (SMCCs) have also advanced in such market. SMCCs's recent trend have clearly shown the changes of contract types from single subcontractor projects to multiple general contracting projects. However, among those multiple projects performed by SMCCs, 1 out of 3 projects were deficit projects that impact the overall pe rformance of the firm. To increase such performance, risk management for in international construction must be managed at the enterprise level for SMCCs. This research aims to create a multiple project management model for SMCCS that employs the concept of acceptable risk to assess the limit risk level for corporation to acceptable. Using the accumulated data from previous survey and International Construction Association of Korea (ICAK), integrated risk of each firm and their profitability of each project are analyzed. Through the analysis, each firm's acceptable risk level is derived. Through the two research steps, acceptable risk algorithm was developed based on corporate integrated risk and profit correlation. To prove the acceptable algorithm relevance, financial statement analysis of 3 corporation was derived that level of acceptable risk and financial statement were available. Through the approach, this research allows the firms to analyze the firm's capability and find projects that suits the firm's situation and capability.

On Enhancing Train-Centric Train Control System Development Process using DSM-based Safety Management (DSM 기법에 따른 안전 관리를 통한 차상중심 열차제어시스템 개발 프로세스의 개선에 관한 연구)

  • Kim, Joo-Uk;Oh, Seh Chan;Han, Seok Youn;Kim, Young-Min;Sim, Sang-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.129-138
    • /
    • 2016
  • The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.

An Improved Multilevel Fuzzy Comprehensive Evaluation to Analyse on Engineering Project Risk

  • LI, Xin;LI, Mufeng;HAN, Xia
    • The Journal of Economics, Marketing and Management
    • /
    • v.10 no.5
    • /
    • pp.1-6
    • /
    • 2022
  • Purpose: To overcome the question that depends too much on expert's subjective judgment in traditional risk identification, this paper structure the multilevel generalized fuzzy comprehensive evaluation mathematics model of the risk identification of project, to research the risk identification of the project. Research design, data and methodology: This paper constructs the multilevel generalized fuzzy comprehensive evaluation mathematics model. Through iterative algorithm of AHP analysis, make sure the important degree of the sub project in risk analysis, then combine expert's subjective judgment with objective quantitative analysis, and distinguish the risk through identification models. Meanwhile, the concrete method of multilevel generalized fuzzy comprehensive evaluation is probed. Using the index weights to analyse project risks is discussed in detail. Results: The improved fuzzy comprehensive evaluation algorithm is proposed in the paper, at first the method of fuzzy sets core is used to optimize the fuzzy relation matrix. It improves the capability of the algorithm. Then, the method of entropy weight is used to establish weight vectors. This makes the computation process fair and open. And thereby, the uncertainty of the evaluation result brought by the subjectivity can be avoided effectively and the evaluation result becomes more objective and more reasonable. Conclusions: In this paper, we use an improved fuzzy comprehensive evaluation method to evaluate a railroad engineering project risk. It can give a more reliable result for a reference of decision making.

Design and Implementation of a Learning Organization for Autonomous Biosafety Management of Infectious Disease Laboratories by Knowledge Translation (지식확산에 의한 감염병 실험실의 자율적 생물안전관리 학습조직 설계 및 실행)

  • Shin, Haeng-Seop;Yu, Minsu
    • Journal of Environmental Health Sciences
    • /
    • v.41 no.2
    • /
    • pp.102-115
    • /
    • 2015
  • Objectives: A learning organization was designed and implemented on the basis of the selection criteria and essential elements of knowledge translation theory. Methods: The learning organization was designed on the basis of biosafety harmonization criteria and risk management strategy and was implemented as the learning organization for biosafety management by the National Institute of Health, Korea Centers for Disease Control & Prevention. The effect of knowledge translation in the research institutions by evidence-based policy was verified. Results: The result of applying the knowledge translation theory involving all stakeholders showed a positive reaction in establishing and implementing biosafety management strategy and embodied risk assessment criteria and evoked sympathy with the necessity of learning and using of expert knowledge about risk assessment and risk management. All stakeholders initiated voluntarily action toward new human-network construction and communication between similar organizations. The learning organization's capability expanded the base of knowledge translation. Conclusion: These results showed that a learning organization could enhance the autonomous safety management system by diffusion of knowledge translation.

On Enhancing Test and Evaluation Process of Weapon Systems Development using DSM-Based Risk and Safety Management (DSM기법에 의한 위험 및 안전 관리를 통해 무기체계 시험평가 프로세스의 개선에 관한 연구)

  • Sim, Sang Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.89-96
    • /
    • 2015
  • The weapon systems development has some distinct characteristics in that a big size of government budget (derived from national tax) has been expended frequently and the completion of the development projects seems to take long. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks. As such, proper management of project risk has been one of crucial subjects in the weapon systems development. Although a variety of methods can be considered, an approach based on the test and evaluation (T&E) process has been selected in this paper in order to appropriately handle those potential risks. In the study of the underlying T&E process, the safety consideration (for instance, explosiveness) of weapon systems is also included. To achieve the objective of the paper, a step-by-step procedure is first presented in the analysis of the T&E process. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored based on a design structure matrix method. The case study of a tank development is also discussed.

Entropical Risk Analysis Method for Managing Project Disruptions

  • Ro, In-Kyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.5 no.1
    • /
    • pp.61-72
    • /
    • 1980
  • This paper is an attempt at developing a method for the analysis and estimation of the effects of project disruptions due to uncertainties. Such uncertainties may result from design changes in large-scale, complex, research and development, or construction projects. An entropical risk analysis method is developed. The method is able to estimate the project capacity to handle equivocation due to design changes and the effects of project disruptions. In an attempt to evaluate the predictive capability of the method, it is compared with the results obtained by a computer Monte Carlo simulation program. It is shown that the entropical risk analysis method may be suggested as an expedient means of evaluating project status for management in the different stages of project execution.

  • PDF

Guideline on the Risk Assessment for Railway Safety Case (철도 Safety Case 작성을 위한 위험도평가 가이드라인)

  • Jung, Won;Wang, Jong-Bae;Park, Chan-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1255-1263
    • /
    • 2008
  • A Safety Case is an railway organization's formal arrangement, through the provision of policies, resources and processes, to ensure the safety of its work activity within safety management system. An effective system helps the organization to identify and manage risks effectively. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. The purpose of this research is to give how to the risk assessments are described within Railway Safety Cases can be prepared and maintained to meet the criteria specified by the upcoming railway regulations. Through this research, we propose the elements of safety management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.

  • PDF

A Study on the Fire Risk Assessment of EIFS by Cone Calorimeter Test & Single Burning Item Test (중소형화재실험을 이용한 외단열 시스템(EIFS) 화재위험성평가에 관한 연구)

  • Min, Se-Hong;Kim, Mi-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2010
  • Recently, in circumstantial situation it is recommended positively to utilize of EIFS(Exterior Insulating and Finishing System) as energy policy for economizing energy. But internal EPS insulators of EIFS are exterior panel of high fire risk, because of constituting of flammable materials to be fragile in fire. In this study, fire risk is assessed by experiment Con Calorimeter test and SBI(Single Burning Item) test. As the result of experiment, Con Calorimeter tests do not reach to capability standard of internal incombustible grade, and are assessed as low grade in SBI incombustible grade. Because EIPS is exterior material in buildings with high fire risk in spite of good efficiency, it is required rapidly to take measures to meet situation through various studies(for instance, adjusting law regulation, etc.) in the future.