Application of the SCE-UA to Derive Zone Boundaries of a Zone Based Operation Rule for a Dam (저수지 수위 구간별 운영률의 구간 경계 도출을 위한 집합체 혼합진화 알고리즘의 적용)

  • Kang, Shinuk;Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.921-934
    • /
    • 2014
  • The purpose of the study is to derive a long term reservoir operation method that is easy to understand and apply to practical use for dam operators. The zone based operation rule is a simple method to make operation decisions by criteria corresponding to storage zones. The reservoir storage levels dividing a reservoir, however, must be determined by some methods. We developed a reservoir operation model based on the zone based operation rule and the shuffled complex evolution algorithm (SCE-UA) was used to determine storage levels for zone division. The model was applied to Angat Dam in the Philippines that has trouble in water supply due to imbalance between supply and demand. We derived a zone based operation rule for Angat Dam and applied it to the reservoir simulation of Angat Dam using the historical inflow. The simulation results showed water supply deficit and power generation were improved by 34.5% and 21.2%, respectively, when compared with the historical records. The current study results may be used to derive a long term reservoir operation rule.

Improvement of Drought Operation Criteria in Agricultural Reservoirs (농업용 저수지 이수관리를 위한 저수율 가뭄단계기준 개선)

  • Mun, Young-Sik;Nam, Won-Ho;Woo, Seung-Beom;Lee, Hee-Jin;Yang, Mi-Hye;Lee, Jong-Seo;Ha, Tae-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.4
    • /
    • pp.11-20
    • /
    • 2022
  • Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

Optimization of Multi-reservoir Operation with a Hedging Rule: Case Study of the Han River Basin (Hedging Rule을 이용한 댐 연계 운영 최적화: 한강수계 사례연구)

  • Ryu, Gwan-Hyeong;Chung, Gun-Hui;Lee, Jung-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.8
    • /
    • pp.643-657
    • /
    • 2009
  • The major reason to construct large dams is to store surplus water during rainy seasons and utilize it for water supply in dry seasons. Reservoir storage has to meet a pre-defined target to satisfy water demands and cope with a dry season when the availability of water resources are limited temporally as well as spatially. In this study, a Hedging rule that reduces total reservoir outflow as drought starts is applied to alleviate severe water shortages. Five stages for reducing outflow based on the current reservoir storage are proposed as the Hedging rule. The objective function is to minimize the total discrepancies between the target and actual reservoir storage, water supply and demand, and required minimum river discharge and actual river flow. Mixed Integer Linear Programming (MILP) is used to develop a multi-reservoir operation system with the Hedging rule. The developed system is applied for the Han River basin that includes four multi-purpose dams and one water supplying reservoir. One of the fours dams is primarily for power generation. Ten-day-based runoff from subbasins and water demand in 2003 and water supply plan to water users from the reservoirs are used from "Long Term Comprehensive Plan for Water Resources in Korea" and "Practical Handbook of Dam Operation in Korea", respectively. The model was optimized by GAMS/CPLEX which is LP/MIP solver using a branch-and-cut algorithm. As results, 99.99% of municipal demand, 99.91% of agricultural demand and 100.00% of minimum river discharge were satisfied and, at the same time, dam storage compared to the storage efficiency increased 10.04% which is a real operation data in 2003.

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

The Capability Analysis of Water Supply for the Parallel Reservoir System by Allocation Rules (저수량 배분규칙을 적용한 병렬저수지 용수공급능력 해석)

  • Park, Ki-Bum;Jee, Hong-Kee;Lee, Soon-Tak
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.2
    • /
    • pp.215-224
    • /
    • 2007
  • The purpose of this study was to estimates water supply reliability indices of the water supply by Allocation Rules(AR) for parallel reservoirs. Rule (A) can be considered it as only current storage, Rule(B) can be considered it as current storage and inflow and Rule(C) can be considered it as current storage, inflow and water supply capacity. First, conditions of water supply are divided by Condition I for the monthly constant water supply and Condition II for the monthly varied water supply. Second, results of allocation coefficients are revealed the smallest different at Rule(C). The analysis of water supply showed that the capability of water supply is superior to the Rule(B), it is superior to the Rule(C) on the base of the balance of water supply. The reliability analysis was highly showed at the Rule(B) and Rule(C). A methodology for the analysis of water supply was developed and applied to the parallel reservoir system from this research, The operation rule for the parallel reservoir can be slightly modified and successfully applied to the different kinds of the parallel reservoir system.

Management of Irrigation Reservoir to Overcome Drought by Operation Rule Curve and WWW (이수관리곡선과 WWW 에 의한 관개저수지의 이수관리)

  • 민진우;문종필;김영식;박승기;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.81-86
    • /
    • 1998
  • It is difficult to know how to restrict the amount of water supply in the drought season, because there is no objective standard rules. The purpose of the study is to present management rules to overcome the drought in the irrigation reservoir by forecasting the water level and restricting water supply according to the operation rule curve and the pattern of rotation-irrigation system. From the operation rule curve drawn up by analyzing the observed water level of reservoir, the water supply rules and rotation-irrigation patterns using WWW and GIS are suggested.

  • PDF

Development and Assessment of Hedging Rule for Han River Reservoir System Operation against Severe Drought (한강수계 저수지군의 갈수대응 운영을 위한 Hedging Rule의 개발과 적용성 평가)

  • Kim, Jeong Yup;Park, Myung Ky;Lee, Gi Ha;Jung, Kwan Sue
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.891-906
    • /
    • 2014
  • This study suggests the hedging rule of MIP (Mixed Integer Programing) in counting the risk evaluation criteria of the objective function and constraints in order to provide the optimum operating rule in reservoir system as constraining water shortage as much as possible which may happen in the downstream control point of water supply in the aspect of water system management. The proposed model is applied to the Han-river reservoir system for two testing periods (Case I: Jan. 1993~Dec. 1997, Case II: Jan. 1999~Dec. 2003). The model based on the hedging rule with trigger volume, estimated in this study shows that in Case I, the monthly minimum discharge was $310.6{\times}10^6m^3$ in the single operation, $56.3{\times}10^6m^3$ in the joint operation, and $317.5{\times}10^6m^3$ in the hedging rule and also, in Case II, the monthly minimum discharge was found to be $204.2{\times}10^6m^3$ in the single operation, $111.2{\times}10^6m^3$ in the joint operation, and $243.7{\times}10^6m^3$ in the hedging rule. In conclusion, the hedging rule, proposed in this study can decrease vulnerability while guarantees reliability and resiliency.

OPTIMUM STORAGE REALLOCATION AND GATE OPERATION IN MULTIPURPOSE RESERVOIRS

  • Hamid Moradkhani
    • Water Engineering Research
    • /
    • v.3 no.1
    • /
    • pp.57-62
    • /
    • 2002
  • This research is intended to integrate long-term operation rules and real time operation policy for conservation & flood control in a reservoir. The familiar Yield model has been modified and used to provide long-term rule curves. The model employs linear programming technique under given physical conditions, i.e., total capacity, dead storage, spillways, outlet capacity and their respective elevations to find required and desired minimum storage fur different demands. To investigate the system behavior resulting from the above-mentioned operating policy, i.e., the rule curves, the simulation model was used. Results of the simulation model show that the results of the optimization model are indeed valid. After confirmation of the above mentioned rule curves by the simulation models, gate operation procedure was merged with the long term operation rules to determine the optimum reservoir operating policy. In the gate operation procedure, operating policy in downstream flood plain, i.e., determination of damaging and non-damaging discharges in flood plain, peak floods, which could be routed by reservoir, are determined. Also outflow hydrograph and variations of water surface levels for two known hydrographs are determined. To examine efficiency of the above-mentioned models and their ability in determining the optimum operation policy, Esteghlal reservoir in Iran was analyzed as a case study. A numerical model fur the solution of two-dimensional dam break problems using fractional step method is developed on unstructured grid. The model is based on second-order Weighted Averaged Flux(WAF) scheme with HLLC approximate Riemann solver. To control the nonphysical oscillations associated with second-order accuracy, TVD scheme with SUPERBEE limiter is used. The developed model is verified by comparing the computational solutions with analytic solutions in idealized test cases. Very good agreements have been achieved in the verifications.

  • PDF

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( III ) - Multi Reservoir Operation Methods - (퍼지제어모형을 이용한 다목적댐의 홍수조절모형 (III) - 댐군의 연계운영방안 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.61-72
    • /
    • 2004
  • In this research, multi reservoir operation methods for reservoirs in Han River are proposed based on the single dam operation models using fuzzy control techniques. The result of fuzzy controled single dam operation has shown that it can improve flood controllability at the downstream of dams. Among the many control rules of fuzzy operation, a rule that shows the most effective flood control rate at the downstream has been selected as Ike operation rule. The simulated results for 1990 and 1995 flood events are compared with historical ones. As the results, it is founded that suggested models can reduce the inundation of upstream and keep the water elevation lower at downstream, which make the proposed models as the effective methods in multi reservoir operation.