• Title/Summary/Keyword: Research and Development Performance Plan

Search Result 327, Processing Time 0.033 seconds

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Development of the Postal Transportation Network Simulation System (우편운송망 성능평가를 위한 시뮬레이션 시스템 개발)

  • Park, Sang-Yong;Lee, Tae-Han;Choi, Ji-Young;Lee, Suk
    • IE interfaces
    • /
    • v.18 no.4
    • /
    • pp.454-464
    • /
    • 2005
  • In Postal logistics, the efficient design and operation of transportation network is very important issue. But, it is hard to operate the postal transportation network flexibly according to the change of mail volume. In Korea post, a transportation plan is pre-determined and the transportation of mail is performed through the routes in the plan. When the routes cannot transport all mail, temporary vehicles are used. In the postal transportation, it is important to make a good transportation plan and to manage the plan efficiently. But the change of transportation plan is not a simple work because hundreds of vehicles and persons are related to the plan. So, a methodology to check the effect of the change of the transportation plan in advance is required. In this paper, we develop a simulation model to evaluate the performance of a postal transportation plan. We implement the simulation model and develop an information system including user interface for managing data and simulation results. We apply our simulation model and system to the real change of transportation plan.

The Surrey Research Park: A Case Study of Strategic Planning for Economic Development

  • Parry, Malcolm
    • World Technopolis Review
    • /
    • v.1 no.3
    • /
    • pp.206-225
    • /
    • 2012
  • The development of the Surrey Research Park by the University of Surrey is an addition to a number of existing strategies to collaborate with industry that it has developed over its 120 year history. The potential to undertake this development was based on owning a substantial land holding that the University acquired when the Borough Council for the town of Guildford invited the University to relocate from Battersea in London to its new location in 1966. Initial plans for the Park in 1979 were accelerated in 1981 in response to plans by the then government to reduce funding for Higher Education in the UK. Beyond a broad master plan for the site that was based on topography and access to the site the plans that were developed were based on a survey of 100 companies that were deemed to be in the target market for the site and a review of the other 7 science parks that were being developed in the UK in 1981. The findings from this proved to be important in developing the master plan for the site. Another important influence on the project was the objectives that were defined for the 3 stakeholders in the project of the University, the tenant companies and the planning authority relate to economic development, a competitive advantage of tenant companies, knowledge transfer, the profile for the University and the capacity to generate income proved to be a valuable framework on which to develop a master plan. These details were underpinned by five objectives which served the three stakeholders in the site. Those for the University included commercial potential, knowledge transfer and image and reputation; those for the town primarily related to economic development and the plan was to help tenants gain a competitive advantage by locating on the site. In addition a number of success indicators were defined for the project against which to measure performance and have remained as a useful set of parameters on which to base the assessment of the performance of the site. In combination with these indicators a further analysis deals with the success factors that are considered as important in influencing performance. The paper sets details the history of the park and covers the success indicators and factors and reviews these in the context of the original objectives for the site.

Application of visual decision making process in the development of business process reengineering vision and implementation plan

  • Kim, Jae-Kyeong;Sung, Tae-Kyung
    • Korean Management Science Review
    • /
    • v.14 no.2
    • /
    • pp.185-198
    • /
    • 1997
  • Business process reengineering(BPR) aims at a radical redesign of our business processes in order to achieve dramatic improvements in their performance. However, the fact that many BPR projects have failed hesitates the companies who have started to use BPR or who are planning to do so. Implementing a radical plan from a cross-functional perspective needs a more careful consideration of process vision, preventive measures and contigency plan. Our research suggests to use a visual decision making process (VDMP) in the development of a process vision and implementation plan. A BPR project of Carlaon School of Mnagement (CSOM) at the University of Minnesota is illustrated to show our suggested methodology.

  • PDF

Application of Visual Decision Making Process in the Development of Business Process Reengineering Vision and Implementation Plan

  • 김재경;성태경
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.14 no.2
    • /
    • pp.185-185
    • /
    • 1989
  • Business process reengineering(BPR) aims at a radical redesign of our business processes in order to achieve dramatic improvements in their performance. However, the fact that many BPR projects have failed hesitates the companies who have started to use BPR or who are planning to do so. Implementing a radical plan from a cross-functional perspective needs a more careful consideration of process vision, preventive measures and contingency plan. Our research suggests to use a visual decision making process (VDMP) in the development of a process vision and implementation plan. A BPR project of Carlson School of Management (CSOM) at the University of Minnesota is illustrated to show our suggested methodology.

Systems Engineering Plan for the Development of Ultra-High-Speed Maglev Train System (초고속 자기부상철도 개발을 위한 시스템엔지니어링 계획서)

  • Lee, Young-Hoon;Min, Sung-Ki
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.21-32
    • /
    • 2009
  • The systems engineering (SE) process shall be applied to the project for successful development of ultra-high-speed (UHS) Maglev train system which is one of very large and complex systems. It is important to abolish technology differentials from the advanced developers such as Germany, Japan, etc. and to ensure discriminatory competitiveness of the application of systems engineering process for the development of the system based on appropriate concepts and requirements. General operation concept and stakeholder's requirements of UHS Maglev train system must be elicited with system concept for initiating the project. The management plan should be devised for all sorts of systems engineering activities of risk management, performance management, lifecycle cost management, etc. This paper would support to establish the systems engineering management plan (SEMP) for the program of UHS Maglev train system development with associated documents.

  • PDF

Development of Measurement Indicators and Effective Analysis for Utilizing Effects of Biotop Map (도시생태현황도의 활용효과 측정지표 개발 및 효과분석)

  • Lee, Eun-Yeob;Kang, Myung-Su;Jeon, Seong-U;Byun, Jong-Bong
    • Journal of Environmental Science International
    • /
    • v.20 no.10
    • /
    • pp.1213-1220
    • /
    • 2011
  • This study aims at choosing indicators to measure the effect of utilizing biotop map, and analyzing its effect by an indicator from the perspective of performer. The Primary performance indicators are made through specialist survey using SMART. As a result, three indicators are chosen: "Discussion of the period of an environmental effects evaluation(reduced effect)", "Plan and execution of environment and ecology plan in an urban development site", "Minimizing ecological damage in an urban development." The result in each indicator is as follows. The indicator of discussion of the period of an environmental effects evaluation(reduced effect), the average reduction rate in statistically meaningful level reduced 6.08% and 11.64% respectively in 2004-2005. In this period, environment information system was established and the reduction effect is shown in this period by reinforcing environment effect estimation using biotop map. As to the indicator of utilizing biotop map in an urban development site, the Seongnam P site case shows that biotop map was used when they set up an development plan. In case of minimizing ecological damage in an urban development, the Gwangjingu G-dong case shows that it was used to appoint preservation sit, and mediate development restrict area. Accordingly, the biotop map utilizing effect is confirmed through core performance indicators and verification of the indicators using SMART. The further research is encouraged to find evaluate indicators and verify the effect quantitatively to increase the use of biotop map.

A study on the new product development strategy patterns and their performance (신제품개발 전략유형과 그 성과에 관한 연구)

  • 유병우;송준민
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1989.10a
    • /
    • pp.108-125
    • /
    • 1989
  • A new product development is critical to the growth and success of most business firms. Increasingly, the new product development is recognized as an essential component of the corporate plan. But, relatively few research investigations have focused on the elements of a new product development strategy and its performance results. This study aims to identify the patterns of new product development strategy which business firms adopt, and its performance results. To identify these patterns and results, 268 firms in four industries known to be active in new product development were selected as a matter of convenience, and surveyed by the questionnaire and interviews. The questionnaire is composed of 67 strategy variables, 8 performance variables, and other variables. To analyze the data from samples, various statistical methods such as factor analysis, Pearson correlation analysis, sluster analysis, and one-way ANOVA were employed. This analysis brought forth the following major findings: First, three new product development strategy patterns were identified. Each strategy pattern was proved to be different from the others in terms of group of strategy elements that were adopted. Second, the new product development strategy was closely linked to its performance. Third, the difference of performance results among strategy groups in each industries was rather significant, however, the performance difference among industries in each strategy group was less significant.

  • PDF

Software Testing/Evaluation Strategy and Plan for the Military Information Systems (군용정보시스템의 소프트웨어 시험평가 전략 및 계획 - “차세대 한국형 워게임 모델”중심으로 -)

  • 김화수
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.57-74
    • /
    • 1998
  • This paper is aimed to propose an testing and evaluation strategy and plan in Military Information Systems, especially focusing on development an“New-generation Wargame Model”. Through this research, we concluded that the effective and efficient testing/evaluation strategy/plan can aid the productivity, maintainability, availability, etc., of the Militray Information Systems. Highlights of the proposed testing and evaluation strategy and plan for Military Information Systems are as follows. First, in the unit and module integration testing phase, hybrid of black-box and white-box testing techniques are available for Military Information Systems and progressive approach for module integration phase should be considered because of the complexity. Second, in the system testing phase, integrated module should be tested with respect to the function and performance that should be satisfied with the user requirements, specifications, risk analysis, etc., Third, in the acceptance testing phase, reliability, interoperability, maintainability, availability, integrity, etc., must be considered in the actual or mini-operational environments for testing efficiently and effectively.

  • PDF

Analysis on the Linkage between SDGs Framework and Forest Policy in Korea (국내 산림정책과 지속가능발전목표(SDGs)간의 연관성 분석)

  • Moon, Jooyeon;Kim, Nahui;Song, Cholho;Lee, Sle-Gee;Kim, Moonil;Lim, Chul-Hee;Cha, Sung-Eun;Kim, Gangsun;Lee, Woo-Kyun;Son, Yowhan;Young, Soogil;Jin, Seabom;Son, Young-Mo
    • Journal of Climate Change Research
    • /
    • v.8 no.4
    • /
    • pp.425-442
    • /
    • 2017
  • This study analysed the linkage between national forest policy in Korea, namely the $5^{th}$ National Forest Master Plan, 2016 Korea Forest Service Performance Management Plan, the $3^{rd}$ National Sustainable Development Plan, and UN Sustainable Development Goals (SDGs). The 7 strategies of the $5^{th}$ National Forest Master Plan were related to 11 Goals of SDGs, and 5 strategies of 2016 Korea Forest Service Performance Management Plan were associated with 7 areas of SDGs, and 4 strategies within $3^{rd}$ National Sustainable Development Plan were linked to 7 Goals of SDGs. Among 87 national forest indicators compiled from three respective forest-related policies of Korea, 45 national indicators were related to 18 SDGs indicators. This indicates that 52% of national indicators of Korean forest policy are reflecting the language of SDGs. However, seeing from SDGs perspective, only 18 out of 241, which accounts for 7.8% of SDGs indicators are related to national indicators. The findings imply that a number of national forest-related indicators do not meet the diverse dimension of SDGs which provides potential areas for forest to contribute. Based on the findings, following recommendations were suggested: 1) the term used in forest policy should be aligned to SDGs targets so that it can be embedded in national policies, and 2) indicators should be further contextualized as well as in its assessment system. Lastly, it suggests for leveraging 3) '5 Processes of sub-national climate change adaptation plan' and the core concept of REDD+ MRV which could provide fundamental background for implementing SDGs framework to national forest policy.